Agency: Bonneville Power Administration
Advanced Search
Pages: 1
[FR Doc E9-23921] 1. Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville
Copies of the Bonneville Purchasing Instructions (BPI), which
contain the policy and establish the procedures that BPA uses in the
solicitation, award, and administration of its purchases of goods and
services, including construction, are available in printed form for
$30, or without charge at the following Internet address:
Published: 2009-10-05
DEPARTMENT OF ENERGY :
Bonneville Power Administration The Bonneville Power Administration (BPA) has decided to offer
Sagebrush Power Partners, LLC, a Large Generator Interconnection
Agreement for interconnection of up to 108 megawatts of power into the
Federal Columbia River Transmission System. The power would be
generated from their proposed Kittitas Valley Wind Project (Wind
Project) in Kittitas Published: 2009-09-16
DEPARTMENT OF ENERGY :
Bonneville Power Administration
The Bonneville Power Administration (BPA) has decided to offer
BP Alternative Energy North America, Inc. a Large Generator
Interconnection Agreement for interconnection of up to 200 megawatts of
power into the Federal Columbia River Transmission System. The power
would be generated by the Golden Hills Wind Project (Wind Project) in
Sherman County, Published: 2009-08-24
DEPARTMENT OF ENERGY :
Bonneville Power Administration BPA intends to prepare an EIS in accordance with the National
Environmental Policy Act (NEPA) on the construction, operation, and
maintenance of a proposed 500kilovolt (kV) transmission line in
Garfield, Columbia, and Walla Walla counties, Washington. The proposed
line would extend west from a new BPA 500kV Central Ferry Substation
(separately Published: 2009-06-19
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces the availability of the ROD to offer
contract terms for interconnection of up to 200 megawatts of wind
generation from the Iberdrola Renewables, Inc.'s proposed Leaning
Juniper II Wind Project into the Federal Columbia River Transmission
System. This decision is consistent with and tiered to BPA's Business
Plan Final Published: 2009-04-21
DEPARTMENT OF ENERGY :
Bonneville Power Administration In July 2007, the Bonneville Power Administration released its
LongTerm Regional Dialogue Final Policy (RD Policy) and associated
Record of Decision (ROD). The RD Policy proposed specific, related
changes to BPA's May 2000 Policy on Determining Net Requirements Under
Sections 5(b)(1) and 9(c) of the Northwest Power Act (5(b)/9(c) Policy)
that BPA Published: 2009-03-31
DEPARTMENT OF ENERGY :
Bonneville Power Administration On February 10, 2009, BPA published a notice in the Federal
Register (74 FR 6609), (February 10, 2009 Notice) announcing its
upcoming consolidated rate proceeding, BPA10, with separate sub
dockets for power and transmission rates for FY 20102011. However, on
page 6611, third column in Part III.A., Distinguishing Between
``Participants'' and Published: 2009-03-02
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces the availability of the ROD to implement
the Proposed Action identified in the Lyle Falls Fish Passage Project EIS (DOE/EIS0397, November 2008). BPA has decided to fund Published: 2009-03-02
DEPARTMENT OF ENERGY :
Bonneville Power Administration
Pages:
1
[FR Doc
E9-22284] 2.
[FR Doc
E9-20303] 3. Electrical Interconnection of the Golden Hills Wind Project
[FR Doc
E9-14448] 4. Central Ferry-Lower Monumental Transmission Line Project
[FR Doc
E9-9094] 5. Leaning Juniper II Wind Project
[FR Doc
E9-7168] 6. Notice of Final Policy; Revised Policy on Determining Net Requirements of
[FR Doc
E9-4323] 7. Fiscal Year (FY) 2010-2011 Proposed Power and Transmission Rate Adjustments;
[FR Doc
E9-4324] 8. Lyle Falls Fish Passage Project
modifications to the existing Lyle Falls Fishway on the lower Klickitat
River (river mile 2.2) in Klickitat County, Washington to improve fish
passage to the