RSS Feed RSS Feed

Agency: Bonneville Power Administration

Browse: Departments   Dates   Agencies  

The Federal Register
200020012002200320042005200620072008

Pages: 1

1. Shepherds Flat Wind Project

NOTICES: Shepherds Flat Wind Project; Record of Decision,

The Bonneville Power Administration (BPA) has decided to offer contract terms for the electrical interconnection into the Federal Columbia River Transmission System (FCRTS) of up to 846 megawatts of power to be generated by the proposed Shepherds Flat Wind Project (Wind Project). Caithness Shepherds Flat LLC proposes to construct and operate the
DEPARTMENT OF ENERGY : Bonneville Power Administration

2. Willow Creek Wind Project

NOTICES: Willow Creek Wind Project,

The Bonneville Power Administration (BPA) has decided to offer contract terms for the electrical interconnection into the Federal Columbia River Transmission System (FCRTS) of up to 72 megawatts of power to be generated by the proposed Willow Creek Wind Project (Wind Project). Willow Creek Energy, LLC proposes to construct and operate the proposed
DEPARTMENT OF ENERGY : Bonneville Power Administration

3. Columbia Basin Fish Accords

NOTICES: Columbia Basin Fish Accords,

This notice announces the availability of the ROD for the 2008 Columbia Basin Fish Accords (Accords) consistent with and tiered to the Fish and Wildlife Implementation Plan Environmental Impact Statement (DOE/EIS0312, April 2003) and ROD (October 31, 2003). BPA has decided to enter into these agreements to help mitigate the impacts of the Federal
DEPARTMENT OF ENERGY : Bonneville Power Administration

4. 2012 Tiered Rate Methodology Proceeding; Public Hearings and Opportunities for Public Review and Comment

NOTICES: 2012 Tiered Rate Methodology Proceeding; republication,

BPA is proposing to adopt a new tiered rate design for setting its Priority Firm Power (PF) rates beginning with the FY 20122013 rate period. The primary feature of this Tiered Rate Methodology (TRM) proposal is one rate tier (Tier 1) based on generation output and costs attributed to BPA's current Federal base system resources and a second rate
DEPARTMENT OF ENERGY : Bonneville Power Administration

5. 2012 Tiered Rate Methodology Proceeding; Public Hearings and Opportunities for Public Review and Comment

NOTICES: 2012 Tiered Rate Methodology Proceeding,

BPA is proposing to adopt a new tiered rate design for setting its Priority Firm Power (PF) rates beginning with the FY 20122013 rate period. The primary feature of this Tiered Rate Methodology (TRM) proposal is one rate tier (Tier 1) based on generation output and costs attributed to BPA's current Federal base system resources and a second rate
DEPARTMENT OF ENERGY : Bonneville Power Administration

6. 2007 Supplemental Wholesale Power Rate Adjustment Proceeding, Public Hearings, and Opportunities for Public Review

NOTICES: 2007 Supplemental Wholesale Power Rate Adjustment Proceeding, Public Hearings, and Opportunities for Public Review and Comment,

The Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act) provides that BPA must establish and periodically review and revise its rates so they are adequate to recover, in accordance with sound business principles, the costs associated with the acquisition, conservation and transmission of electric power, and to
DEPARTMENT OF ENERGY : Bonneville Power Administration

7. Proposed Methodology for Determining the Average System Cost of Resources for Electric Utilities Participating in the

NOTICES: Bonneville Power Administration,

Bonneville Power Administration (BPA) proposes a revised methodology for determining the average system cost (ASC) of resources for regional electric utilities that participate in the Residential Exchange Program (REP) authorized by section 5(c) of the Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act). The ASC
DEPARTMENT OF ENERGY : Bonneville Power Administration

8. Proposed Wind Integration--Within-Hour Balancing Service Rate for Public Hearing, and Opportunity for Public Review

NOTICES: Proposed Wind IntegrationWithin-Hour Balancing Service Rate,

The purpose of the hearing is to adopt a rate for Wind IntegrationWithinHour Balancing Service. As increasing amounts of wind generation have integrated into BPA's Balancing Authority, the variability and uncertainty of wind generation have led to increased costs through the need for additional reserve capacity, the shift of energy generation from
DEPARTMENT OF ENERGY : Bonneville Power Administration

©2004,2005,2006 theFederalRegister.com