Agency: Bonneville Power Administration

Advanced Search

Years: 2000200120022003200420052006200720082009

Pages: 1

[FR Doc 01-29247] 1. Northeast Oregon Hatchery--Grande Ronde and Imnaha Spring Chinook Project

This notice announces BPA's intention to prepare an EIS on the development of additional supplementation facilities and modifications to existing facilities to support the mitigation of impacts to natural populations of spring chinook salmon in the Grande Ronde and Imnaha River basins. The U.S. Fish and Wildlife Service (USFWS), Department of

Published: 2001-11-23 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 01-28726] 2. Condon Wind Project

This notice announces the availability of the ROD to enter into power purchase and transmission service agreements to acquire and connect the scheduled output of up to 49.8 megawatts of the Condon Wind Project located in central Oregon. This decision is based on the Condon Wind Project Final Environmental Impact Statement (DOE/EIS0321, August

Published: 2001-11-16 DEPARTMENT OF ENERGY : Bonneville Power Administration

[FR Doc 01-27435] 3. Notice of Revised Schedule Regarding Issues Arising Under Bonneville Power

This notice announces a change in the schedule for the policy review of certain issues relating to BPA's existing policy on New Large Single Loads (NLSL). Three issues were identified in the initial Federal Register notice (published June 25, 2001) as follows: (1) BPA preference customer service to direct service industrial (DSI) load; (2) the

Published: 2001-11-01 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 01-27122] 4. TransAlta Centralia Generation LLC Big Hanaford Project

This notice announces the availability of the ROD to offer contract terms for integrating power from the TransAlta Centralia Generation LLC Big Hanaford Project into the Federal Columbia River Transmission System. This decision is based on input from public processes and information in the BPA Business Plan Environmental Impact Statement

Published: 2001-10-29 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 01-25832] 5. Horse Heaven Wind Project

This notice announces BPA's intention to prepare an EIS on the proposed Horse Heaven Wind Project (Project), located southwest of the town of Kennewick in Benton County, Washington. Washington Winds Incorporated (Washington Winds) proposes to construct and operate the wind generation facility, which would have a generating capacity up to 225

Published: 2001-10-15 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 01-24522] 6. Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville

Copies of the Bonneville Purchasing Instructions (BPI), which contain the policy and establish the procedures that BPA uses in the solicitation, award, and administration of its purchases of goods and services, including construction, are available in printed form for $30, or without charge at the following Internet address:

Published: 2001-10-01 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 01-20078] 7. Longview Energy Development Project

This notice announces the availability of the ROD to offer contract terms for integrating power from Longview Energy Development LLC (LED) into the Federal Columbia River Transmission System. This decision is based on input from public processes and information in the BPA Business Plan Environmental Impact Statement (DOE/EIS0183, June 1995) and

Published: 2001-08-10 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 01-17069] 8. Temporary Small Resource Policy

This notice announces the availability of the ROD to establish a Temporary Small Resource Policy (Policy) as an incentive to utility customers to use small resources to serve a portion of their electricity needs, reducing firm load on BPA. This ROD is based on input from the public process and information in the BPA Business Plan Environmental

Published: 2001-07-09 DEPARTMENT OF ENERGY : Bonneville Power Administration

[FR Doc 01-15843] 9. Opportunity for Public Comment Regarding Issues Arising Under Bonneville

This notice announces an opportunity for public comment on three specific issues relating to BPA's existing policy on New Large Single Loads (NLSL). BPA's NLSL policy is statutorily based and has been developed and refined over the past twenty years, since enactment in 1980 of the Pacific Northwest Electric Power Planning and Conservation Act

Published: 2001-06-25 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 01-14989] 10. Starbuck Power Project

This notice announces BPA's intention to prepare a joint National Environmental Policy Act (NEPA)/State Environmental Policy Act (SEPA) EIS in cooperation with the State of Washington Energy Facility Site Evaluation Council (EFSEC) for an electrical interconnection including a new 16mile 500kilovolt (kV) transmission line and other facilities

Published: 2001-06-14 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 01-14734] 11. Bonneville Power Administration; Maiden Wind Farm Project

BPA intends to prepare an EIS on the proposed Maiden Wind Farm (Project), located northeast of the town of Sunnyside in Benton and Yakima Counties, Washington. Washington Winds, Incorporated (Washington Winds) proposes to construct and operate the 150 to 494megawatt (MW) wind generation facility. BPA proposes to purchase the electrical output from

Published: 2001-06-12 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 01-13915] 12. Electrical Interconnection of the Chehalis Generation Facility

This notice announces the availability of the ROD to integrate power from the Chehalis Generation Facility into the Federal Columbia River Transmission System (FCRTS), based on BPA's Resource Contingency Program Environmental Impact Statement (RCP EIS, DOE/EIS0230, November 1995), Supplement Analysis (SA, DOE/EIS0230/SA02, May 9, 2001), BPA's

Published: 2001-06-04 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 01-12332] 13. McNary-John Day Transmission Line Project

Bonneville intends to prepare an EIS on the construction, operation, and maintenance of a 75milelong 500kilovolt transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the

Published: 2001-05-16 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 01-11926] 14. Santiam-Bethel Transmission Line Project

This notice announces BPA's proposal to rebuild a 17-mile portion of the SantiamChemawa singlecircuit 230kilovolt (kV) line as a doublecircuit 230kV line in the existing rightofway in
floodplains and wetlands located in Marion and Linn Counties, Oregon. The purpose of the project is to prevent overloads on the Santiam Chemawa 230kV line. In

Published: 2001-05-11 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 01-9379] 15. Blackfeet Wind Project

BPA intends to prepare an EIS on the proposed Blackfeet Wind Project (Project), located in Glacier County, Montana, on the Blackfeet Indian Reservation. Blackfeet I, LLC (Blackfeet I) proposes to construct and operate the 36 to 66megawatt (MW) wind generation facility. BPA proposes to purchase the electrical output from the Project. The EIS will

Published: 2001-04-16 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 01-8509] 16. Wallula Power Project

This notice announces BPA's intention to prepare a joint National Environmental Policy Act (NEPA)/State Environmental Policy Act (SEPA) EIS in cooperation with the State of Washington Energy Facility Site Evaluation Council (EFSEC) for an electrical interconnection including a new 29mile 500kilovolt (kV) transmission line associated with a

Published: 2001-04-06 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 01-8004] 17. Electrical Interconnection of the Goldendale Energy Project

This notice announces the availability of the ROD to integrate power from the Goldendale Energy Project (GEP) into the Federal Columbia River Transmission System, based on input from the public process and information in the BPA Business Plan Environmental Impact Statement (DOE/EIS0183) and a Supplement Analysis (DOE/EIS0183/SA 03). BPA has decided

Published: 2001-04-02 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 01-4640] 18. Transmission System Vegetation Management Program

This supplemental ROD is to clarify Bonneville's decisions regarding its approved herbicide list and procedures that were adopted in its ROD of July 2000, based on its Transmission System Vegetation Management Program Environmental Impact Statement (EIS) (DOE/EIS0285, May 2000). The remaining text of the supplemental ROD is included in its

Published: 2001-02-26 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 01-2573] 19. Shelton-Kitsap Transmission Line Rebuild

This notice announces BPA's proposal to rebuild its existing SheltonKitsap No. 2 115kilovolt (kV) transmission line as a double circuit 230kV line in the existing rightofway (ROW), in order to improve system capability and reliability. BPA has prepared an Environmental Assessment (EA) (DOE/EA1342) evaluating the proposed project. Based on the

Published: 2001-01-30 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 01-442] 20. Umatilla Generating Project

This notice announces BPA's intention to prepare an EIS, under the National Environmental Policy Act (NEPA), on a proposed electrical interconnection requested by Umatilla Generating Company, L.P., to integrate electrical power from the Umatilla Generating Project into the Federal transmission grid. BPA proposes to execute an agreement with

Published: 2001-01-08 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

Years: 2000200120022003200420052006200720082009

Pages: 1