Agency: Bonneville Power Administration
Advanced Search
Pages: 1
[FR Doc 01-29247] 1. Northeast Oregon Hatchery--Grande Ronde and Imnaha Spring Chinook Project
This notice announces BPA's intention to prepare an EIS on the development of additional supplementation facilities and modifications to existing facilities to support the mitigation of impacts to natural populations of spring chinook salmon in the Grande Ronde and Imnaha River basins. The U.S. Fish and Wildlife Service (USFWS), Department of
Published: 2001-11-23 DEPARTMENT OF ENERGY : Bonneville Power Administration
[FR Doc 01-28726] 2. Condon Wind Project
This notice announces the availability of the ROD to enter into power purchase and transmission service agreements to acquire and connect the scheduled output of up to 49.8 megawatts of the Condon Wind Project located in central Oregon. This decision is based on the Condon Wind Project Final Environmental Impact Statement (DOE/EIS0321, August
Published: 2001-11-16 DEPARTMENT OF ENERGY : Bonneville Power Administration
[FR Doc 01-27435] 3. Notice of Revised Schedule Regarding Issues Arising Under Bonneville Power
This notice announces a change in the schedule for the policy review of certain issues relating to BPA's existing policy on New Large Single Loads (NLSL). Three issues were identified in the initial Federal Register notice (published June 25, 2001) as follows: (1) BPA preference customer service to direct service industrial (DSI) load; (2) the
Published: 2001-11-01 DEPARTMENT OF ENERGY : Bonneville Power Administration
[FR Doc 01-27122] 4. TransAlta Centralia Generation LLC Big Hanaford Project
This notice announces the availability of the ROD to offer contract terms for integrating power from the TransAlta Centralia Generation LLC Big Hanaford Project into the Federal Columbia River Transmission System. This decision is based on input from public processes and information in the BPA Business Plan Environmental Impact Statement
Published: 2001-10-29 DEPARTMENT OF ENERGY : Bonneville Power Administration
[FR Doc 01-25832] 5. Horse Heaven Wind Project
This notice announces BPA's intention to prepare an EIS on the proposed Horse Heaven Wind Project (Project), located southwest of the town of Kennewick in Benton County, Washington. Washington Winds Incorporated (Washington Winds) proposes to construct and operate the wind generation facility, which would have a generating capacity up to 225
Published: 2001-10-15 DEPARTMENT OF ENERGY : Bonneville Power Administration
[FR Doc 01-24522] 6. Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville
Copies of the Bonneville Purchasing Instructions (BPI), which
contain the policy and establish the procedures that BPA uses in the
solicitation, award, and administration of its purchases of goods and
services, including construction, are available in printed form for
$30, or without charge at the following Internet address:
Published: 2001-10-01
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces the availability of the ROD to offer
contract terms for integrating power from Longview Energy Development
LLC (LED) into the Federal Columbia River Transmission System. This
decision is based on input from public processes and information in the
BPA Business Plan Environmental Impact Statement (DOE/EIS0183, June
1995) and Published: 2001-08-10
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces the availability of the ROD to establish
a Temporary Small Resource Policy (Policy) as an incentive to utility
customers to use small resources to serve a portion of their
electricity needs, reducing firm load on BPA. This ROD is based on
input from the public process and information in the BPA Business Plan
Environmental Published: 2001-07-09
DEPARTMENT OF ENERGY :
Bonneville Power Administration
This notice announces an opportunity for public comment on
three specific issues relating to BPA's existing policy on New Large
Single Loads (NLSL). BPA's NLSL policy is statutorily based and has
been developed and refined over the past twenty years, since enactment
in 1980 of the Pacific Northwest Electric Power Planning and
Conservation Act Published: 2001-06-25
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces BPA's intention to prepare a joint
National Environmental Policy Act (NEPA)/State Environmental Policy Act
(SEPA) EIS in cooperation with the State of Washington Energy Facility
Site Evaluation Council (EFSEC) for an electrical interconnection
including a new 16mile 500kilovolt (kV) transmission line and other
facilities Published: 2001-06-14
DEPARTMENT OF ENERGY :
Bonneville Power Administration BPA intends to prepare an EIS on the proposed Maiden Wind Farm
(Project), located northeast of the town of Sunnyside in Benton and
Yakima Counties, Washington. Washington Winds, Incorporated (Washington
Winds) proposes to construct and operate the 150 to 494megawatt (MW)
wind generation facility. BPA proposes to purchase the electrical
output from Published: 2001-06-12
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces the availability of the ROD to integrate
power from the Chehalis Generation Facility into the Federal Columbia
River Transmission System (FCRTS), based on BPA's Resource Contingency
Program Environmental Impact Statement (RCP EIS, DOE/EIS0230, November
1995), Supplement Analysis (SA, DOE/EIS0230/SA02, May 9, 2001), BPA's Published: 2001-06-04
DEPARTMENT OF ENERGY :
Bonneville Power Administration Bonneville intends to prepare an EIS on the construction,
operation, and maintenance of a 75milelong 500kilovolt transmission
line in Benton and Klickitat Counties, Washington, and Umatilla and
Sherman Counties, Oregon. The new line would start at Bonneville's
McNary Substation in Oregon and would cross the Columbia River just
north of the Published: 2001-05-16
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces BPA's proposal to rebuild a 17-mile
portion of the SantiamChemawa singlecircuit 230kilovolt (kV) line as a doublecircuit 230kV line in the existing rightofway in Published: 2001-05-11
DEPARTMENT OF ENERGY :
Bonneville Power Administration BPA intends to prepare an EIS on the proposed Blackfeet Wind
Project (Project), located in Glacier County, Montana, on the Blackfeet
Indian Reservation. Blackfeet I, LLC (Blackfeet I) proposes to
construct and operate the 36 to 66megawatt (MW) wind generation
facility. BPA proposes to purchase the electrical output from the
Project. The EIS will Published: 2001-04-16
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces BPA's intention to prepare a joint
National Environmental Policy Act (NEPA)/State Environmental Policy Act
(SEPA) EIS in cooperation with the State of Washington Energy Facility
Site Evaluation Council (EFSEC) for an electrical interconnection
including a new 29mile 500kilovolt (kV) transmission line associated
with a Published: 2001-04-06
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces the availability of the ROD to integrate
power from the Goldendale Energy Project (GEP) into the Federal
Columbia River Transmission System, based on input from the public
process and information in the BPA Business Plan Environmental Impact
Statement (DOE/EIS0183) and a Supplement Analysis (DOE/EIS0183/SA
03). BPA has decided Published: 2001-04-02
DEPARTMENT OF ENERGY :
Bonneville Power Administration This supplemental ROD is to clarify Bonneville's decisions
regarding its approved herbicide list and procedures that were adopted
in its ROD of July 2000, based on its Transmission System Vegetation
Management Program Environmental Impact Statement (EIS) (DOE/EIS0285,
May 2000). The remaining text of the supplemental ROD is included in
its Published: 2001-02-26
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces BPA's proposal to rebuild its existing
SheltonKitsap No. 2 115kilovolt (kV) transmission line as a double
circuit 230kV line in the existing rightofway (ROW), in order to
improve system capability and reliability. BPA has prepared an
Environmental Assessment (EA) (DOE/EA1342) evaluating the proposed
project. Based on the Published: 2001-01-30
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces BPA's intention to prepare an EIS, under
the National Environmental Policy Act (NEPA), on a proposed electrical
interconnection requested by Umatilla Generating Company, L.P., to
integrate electrical power from the Umatilla Generating Project into
the Federal transmission grid. BPA proposes to execute an agreement
with Published: 2001-01-08
DEPARTMENT OF ENERGY :
Bonneville Power Administration
Pages:
1
[FR Doc
01-20078] 7. Longview Energy Development Project
[FR Doc
01-17069] 8. Temporary Small Resource Policy
[FR Doc
01-15843] 9. Opportunity for Public Comment Regarding Issues Arising Under Bonneville
[FR Doc
01-14989] 10. Starbuck Power Project
[FR Doc
01-14734] 11.
Bonneville Power Administration; Maiden Wind Farm Project
[FR Doc
01-13915] 12. Electrical Interconnection of the Chehalis Generation Facility
[FR Doc
01-12332] 13. McNary-John Day Transmission Line Project
[FR Doc
01-11926] 14. Santiam-Bethel Transmission Line Project
floodplains and wetlands located in Marion and Linn Counties, Oregon.
The purpose of the project is to prevent overloads on the Santiam
Chemawa 230kV line. In[FR Doc
01-9379] 15. Blackfeet Wind Project
[FR Doc
01-8509] 16. Wallula Power Project
[FR Doc
01-8004] 17. Electrical Interconnection of the Goldendale Energy Project
[FR Doc
01-4640] 18. Transmission System Vegetation Management Program
[FR Doc
01-2573] 19. Shelton-Kitsap Transmission Line Rebuild
[FR Doc
01-442] 20. Umatilla Generating Project