[FR Doc 02-28467] 1. McNary-John Day Transmission Line Project

This notice announces the availability of the ROD to construct the McNaryJohn Day Transmission Line Project in Benton and Klickitat Counties, Washington, and Sherman and Umatilla Counties, Oregon. This decision is based on input from public processes and information in the McNaryJohn Day Transmission Line Project Final Environmental Impact

Published: 2002-11-08 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 02-25530] 2. Umatilla Generating Project

This notice announces the availability of the ROD to offer contract terms for integrating power from the Umatilla Generating Project into the Federal Columbia River Transmission System. This decision is based on input from public processes and information in the Umatilla Generating Project Environmental Impact Statement (DOE/EIS 0324, January

Published: 2002-10-08 DEPARTMENT OF ENERGY : Bonneville Power Administration

[FR Doc 02-24073] 3. GNA Cliffs Energy Project

This notice announces the availability of the ROD to offer contract terms for integrating power from the Cliffs Energy Project of GNA Energy, LLC, into the Federal Columbia River Transmission System. This decision is based on input from public processes and information in the BPA Business Plan Environmental Impact Statement (DOE/EIS0183, June

Published: 2002-09-23 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 02-24074] 4. Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville

Copies of the Bonneville Purchasing Instructions (BPI), which contain the policy and establish the procedures that BPA uses in the solicitation, award, and administration of its purchases of goods and services, including construction, are available in printed form for $30, or without charge at the following Internet address:

Published: 2002-09-23 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 02-17420] 5. BP Cherry Point Cogeneration Project

This notice announces BPA's intention to prepare a joint National Environmental Policy Act (NEPA)/State Environmental Policy Act (SEPA) EIS in cooperation with the State of Washington Energy Facility Site Evaluation Council (EFSEC) for a proposed new cogeneration plant and its electrical interconnection with the Federal Columbia River Transmission

Published: 2002-07-11 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 02-12251] 6. Kangley-Echo Lake Transmission Line Project

This notice announces BPA's intention to prepare a Supplemental Draft EIS on the construction, operation, and maintenance of a 500kilovolt (kV) transmission line in King and Kittitas Counties, State of Washington. Cooperating agencies are Mt. BakerSnoqualmie and Wenatchee National Forests, U.S. Department of Agriculture. The Supplemental Draft EIS

Published: 2002-05-16 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 02-11397] 7. Electrical Interconnection of the Satsop Combustion Turbine Project

This notice announces the availability of the ROD to offer contract terms to integrate power from the Satsop Combustion Turbine Project, a 650megawatt gasfired, combinedcycle, combustion turbine power generation project, into the Federal Columbia River Transmission System (FCRTS). The project is located in Satsop, in the Satsop Development Park,

Published: 2002-05-08 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 02-9274] 8. Proposed Adjustment to the ACS-02 Generation Imbalance

By this notice, BPA's Transmission Business Line (TBL) announces its proposal to revise the ACS02 Generation Imbalance Service rate (rate) found in its 2002 Transmission and Ancillary Service Rate Schedules. BPA proposes to eliminate the 100 mills per kilowatthour minimum rate for wind resources for imbalances that exceed the

Published: 2002-04-17 DEPARTMENT OF ENERGY : Bonneville Power Administration

[FR Doc 02-4616] 9. Mint Farm Generation Project

This notice announces the availability of the ROD to offer contract terms for integrating power from the Mint Farm Generation Project, proposed by Mint Farm Generation LLC (MFG), a wholly owned subsidiary of Mirant Corporation, into the Federal Columbia River Transmission System.

Published: 2002-02-27 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 02-3090] 10. Santiam-Bethel Transmission Line Project

BPA is issuing this FONSI on its proposal to rebuild the first 17 miles of the SantiamChemawa transmission line from Santiam Substation to the line's connection (tap) to Portland General Electric's (PGE) Bethel Substation to improve transmission system reliability in the Salem area of northwestern Oregon. A Floodplain Statement of Findings is also

Published: 2002-02-08 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 02-2598] 11. Bonneville Power Administration; Salmon Creek Project

This notice announces BPA's intention to prepare an EIS on the Salmon Creek Project, a proposal by the Confederated Tribes of the Colville Indian Reservation (CCT) and the Okanogan Irrigation District (OID) to enhance fish habitat and fish passage and increase instream flows in lower Salmon Creek, a tributary to the Okanogan River in Okanogan

Published: 2002-02-04 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 02-1469] 12. Plymouth Generating Facility

This notice announces BPA's intention to prepare a joint National Environmental Policy Act (NEPA)/State Environmental Policy Act (SEPA) EIS in cooperation with Benton County, State of Washington, for an electrical interconnection including a new onemile transmission line and other facilities associated with a proposed powerplant. BPA is the lead

Published: 2002-01-22 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 02-1468] 13. Proposed Adjustment to the Rate for Interchange Energy Imbalances Under the

The Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act) provides that BPA must establish and periodically review its rates so that they are adequate to recover, in accordance with sound business principles, the costs associated with the acquisition, conservation, and transmission of electric power, and to recover

Published: 2002-01-22 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 02-893] 14.(Eastern Washington Reinforcement)

Bonneville intends to prepare an EIS on the proposed construction, operation, and maintenance of an 84milelong 500 kilovolt (kV) transmission line in Douglas, Grant, Lincoln, and Spokane Counties, Washington. The new line would start at Bonneville's Bell Substation in Spokane, and proceed west along an existing rightofway for about 84 miles,

Published: 2002-01-14 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc 02-210] 15. COB Energy Facility

This notice announces BPA's intention to prepare an EIS, under the National Environmental Policy Act (NEPA), on a proposed electrical interconnection requested by Peoples Energy Resources Corporation (Peoples Energy), to integrate electrical power from the COB Energy Facility into the Federal transmission grid. BPA proposes to execute an agreement

Published: 2002-01-04 DEPARTMENT OF ENERGY : Bonneville Power Administration

 