Agency: Bonneville Power Administration
Advanced Search
Pages: 1
[FR Doc 02-28467] 1. McNary-John Day Transmission Line Project
This notice announces the availability of the ROD to construct the McNaryJohn Day Transmission Line Project in Benton and Klickitat Counties, Washington, and Sherman and Umatilla Counties, Oregon. This decision is based on input from public processes and information in the McNaryJohn Day Transmission Line Project Final Environmental Impact
Published: 2002-11-08 DEPARTMENT OF ENERGY : Bonneville Power Administration
[FR Doc 02-25530] 2. Umatilla Generating Project
This notice announces the availability of the ROD to offer contract terms for integrating power from the Umatilla Generating Project into the Federal Columbia River Transmission System. This decision is based on input from public processes and information in the Umatilla Generating Project Environmental Impact Statement (DOE/EIS 0324, January
Published: 2002-10-08 DEPARTMENT OF ENERGY : Bonneville Power Administration
[FR Doc 02-24073] 3. GNA Cliffs Energy Project
This notice announces the availability of the ROD to offer contract terms for integrating power from the Cliffs Energy Project of GNA Energy, LLC, into the Federal Columbia River Transmission System. This decision is based on input from public processes and information in the BPA Business Plan Environmental Impact Statement (DOE/EIS0183, June
Published: 2002-09-23 DEPARTMENT OF ENERGY : Bonneville Power Administration
[FR Doc 02-24074] 4. Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville
Copies of the Bonneville Purchasing Instructions (BPI), which
contain the policy and establish the procedures that BPA uses in the
solicitation, award, and administration of its purchases of goods and
services, including construction, are available in printed form for
$30, or without charge at the following Internet address:
Published: 2002-09-23
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces BPA's intention to prepare a joint
National Environmental Policy Act (NEPA)/State Environmental Policy Act
(SEPA) EIS in cooperation with the State of Washington Energy Facility
Site Evaluation Council (EFSEC) for a proposed new cogeneration plant
and its electrical interconnection with the Federal Columbia River
Transmission Published: 2002-07-11
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces BPA's intention to prepare a
Supplemental Draft EIS on the construction, operation, and maintenance
of a 500kilovolt (kV) transmission line in King and Kittitas Counties,
State of Washington. Cooperating agencies are Mt. BakerSnoqualmie and
Wenatchee National Forests, U.S. Department of Agriculture. The
Supplemental Draft EIS Published: 2002-05-16
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces the availability of the ROD to offer
contract terms to integrate power from the Satsop Combustion Turbine
Project, a 650megawatt gasfired, combinedcycle, combustion turbine
power generation project, into the Federal Columbia River Transmission
System (FCRTS). The project is located in Satsop, in the Satsop
Development Park, Published: 2002-05-08
DEPARTMENT OF ENERGY :
Bonneville Power Administration By this notice, BPA's Transmission Business Line (TBL)
announces its proposal to revise the ACS02 Generation Imbalance
Service rate (rate) found in its 2002 Transmission and Ancillary
Service Rate Schedules. BPA proposes to eliminate the 100 mills per
kilowatthour minimum rate for wind resources for imbalances that exceed
the Published: 2002-04-17
DEPARTMENT OF ENERGY :
Bonneville Power Administration
This notice announces the availability of the ROD to offer
contract terms for integrating power from the Mint Farm Generation
Project, proposed by Mint Farm Generation LLC (MFG), a wholly owned
subsidiary of Mirant Corporation, into the Federal Columbia River
Transmission System. Published: 2002-02-27
DEPARTMENT OF ENERGY :
Bonneville Power Administration BPA is issuing this FONSI on its proposal to rebuild the first
17 miles of the SantiamChemawa transmission line from Santiam
Substation to the line's connection (tap) to Portland General
Electric's (PGE) Bethel Substation to improve transmission system
reliability in the Salem area of northwestern Oregon. A Floodplain
Statement of Findings is also Published: 2002-02-08
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces BPA's intention to prepare an EIS on the
Salmon Creek Project, a proposal by the Confederated Tribes of the
Colville Indian Reservation (CCT) and the Okanogan Irrigation District
(OID) to enhance fish habitat and fish passage and increase instream
flows in lower Salmon Creek, a tributary to the Okanogan River in
Okanogan Published: 2002-02-04
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces BPA's intention to prepare a joint
National Environmental Policy Act (NEPA)/State Environmental Policy Act
(SEPA) EIS in cooperation with Benton County, State of Washington, for
an electrical interconnection including a new onemile transmission
line and other facilities associated with a proposed powerplant. BPA is
the lead Published: 2002-01-22
DEPARTMENT OF ENERGY :
Bonneville Power Administration The Pacific Northwest Electric Power Planning and Conservation
Act (Northwest Power Act) provides that BPA must establish and
periodically review its rates so that they are adequate to recover, in
accordance with sound business principles, the costs associated with
the acquisition, conservation, and transmission of electric power, and
to recover Published: 2002-01-22
DEPARTMENT OF ENERGY :
Bonneville Power Administration Bonneville intends to prepare an EIS on the proposed
construction, operation, and maintenance of an 84milelong 500
kilovolt (kV) transmission line in Douglas, Grant, Lincoln, and Spokane
Counties, Washington. The new line would start at Bonneville's Bell
Substation in Spokane, and proceed west along an existing rightofway
for about 84 miles, Published: 2002-01-14
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces BPA's intention to prepare an EIS, under
the National Environmental Policy Act (NEPA), on a proposed electrical
interconnection requested by Peoples Energy Resources Corporation
(Peoples Energy), to integrate electrical power from the COB Energy
Facility into the Federal transmission grid. BPA proposes to execute an
agreement Published: 2002-01-04
DEPARTMENT OF ENERGY :
Bonneville Power Administration
Pages:
1
[FR Doc
02-17420] 5. BP Cherry Point Cogeneration Project
[FR Doc
02-12251] 6. Kangley-Echo Lake Transmission Line Project
[FR Doc
02-11397] 7. Electrical Interconnection of the Satsop Combustion Turbine Project
[FR Doc
02-9274] 8. Proposed Adjustment to the ACS-02 Generation Imbalance
[FR Doc
02-4616] 9. Mint Farm Generation Project
[FR Doc
02-3090] 10. Santiam-Bethel Transmission Line Project
[FR Doc
02-2598] 11.
Bonneville Power Administration; Salmon Creek Project
[FR Doc
02-1469] 12. Plymouth Generating Facility
[FR Doc
02-1468] 13. Proposed Adjustment to the Rate for Interchange Energy Imbalances Under the
[FR Doc
02-893] 14.(Eastern Washington Reinforcement)
[FR Doc
02-210] 15. COB Energy Facility