Agency: Bonneville Power Administration
Advanced Search
Pages: 1
[FR Doc 03-31452] 1. Transmission Policy-Level Environmental Impact Statement
BPA proposes to adopt a comprehensive policy to guide its transmission business activities. This transmission policylevel Environmental Impact Statement (EIS) will address the planning, construction, operation, and marketing of BPA's Transmission Business Line. BPA is taking this opportunity to further enhance and inform its decisionmaking by
Published: 2003-12-22 DEPARTMENT OF ENERGY : Bonneville Power Administration
[FR Doc 03-28507] 2. Fish and Wildlife Implementation Plan
This notice announces the availability of BPA's ROD to adopt the Preferred Alternative (PA 2002) Policy Direction in its Fish and Wildlife Implementation Plan Environmental Impact Statement (FWIP EIS, DOE/EIS0312, April 2003). BPA has decided to adopt this Preferred Alternative as a comprehensive and consistent policy to guide the implementation
Published: 2003-11-14 DEPARTMENT OF ENERGY : Bonneville Power Administration
[FR Doc 03-26651] 3. Plymouth Generating Facility
This notice announces the availability of the ROD to offer contract terms for interconnection of the Plymouth Generating Facility (PGF) into the Federal Columbia River Transmission System (FCRTS), based on the Plymouth Generating Facility Final Environmental Impact Statement (DOE/EIS0345, June 2003). The interconnection would occur at BPA's
Published: 2003-10-22 DEPARTMENT OF ENERGY : Bonneville Power Administration
[FR Doc 03-22521] 4. Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville
Copies of the Bonneville Purchasing Instructions (BPI), which
contain the policy and establish the procedures that BPA uses in the
solicitation, award, and administration of its purchases of goods and
services, including construction, are available in printed form for
$30, or without charge at the following Internet address:
Published: 2003-09-04
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces the availability of the ROD to offer
contract terms for interconnection of the proposed Summit/Westward
Project into the Federal Columbia River Transmission System at BPA's Allston Published: 2003-08-04
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces the availability of the ROD to construct
the proposed KangleyEcho Lake Transmission Line Project in King
County, Washington, based on the KangleyEcho Lake Transmission Line
Project Final Environmental Impact Statement (DOE/EIS0317S1, June
2003). BPA has decided to implement the Proposed Action (Alternative 1)
identified in Published: 2003-07-29
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces the availability of the ROD for BPA to
implement its proposed SN CRAC Adjustment to 2002 Wholesale Power
Rates. This rate adjustment is being implemented to allow BPA to
address potential revenue shortfalls and to allow BPA to recover its
costs through rates. This rate adjustment involves implementation of
one of BPA's Published: 2003-07-10
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces BPA's intention to prepare an EIS on
removal of all fish from selected lakes in the South Fork of the
Flathead River drainage that harbor nonnative species that threaten to
genetically contaminate native fish in streams leading from those
lakes, down into the South Fork Flathead River and Hungry Horse
Reservoir. The specific Published: 2003-05-05
DEPARTMENT OF ENERGY :
Bonneville Power Administration
This notice announces the availability of the ROD to construct
the proposed SchultzHanford Area Transmission Line Project in Douglas,
Grant, Lincoln, and Spokane Counties, Washington, based on the Final
Environmental Impact Statement for this project (DOE/EIS0325, January
2003). The proposed action consists of constructing a new 500kilovolt
(kV) Published: 2003-03-25
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces the availability of the ROD for the
WallulaMcNary Transmission Line Project and Wallula Power Project,
based on the Final Environmental Impact Statement (DOE/EIS0330, August
2002). BPA has decided to implement its portion of the proposed action
identified in the Final EIS, which includes interconnection with the
Federal Published: 2003-03-20
DEPARTMENT OF ENERGY :
Bonneville Power Administration The Pacific Northwest Electric Power Planning and Conservation
Act (Northwest Power Act), 16 U.S.C. 839, provides that the Bonneville
Power Administration (BPA) must establish and periodically review and
revise its rates to recover, in accordance with sound business
principles, the costs associated with the acquisition, conservation,
and Published: 2003-03-13
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces the availability of the ROD to construct
the proposed Grand CouleeBell 500kilovolt (kV) Transmission Line
Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington,
based on the Final Environmental Impact Statement for this project
(DOE/EIS0344, December 2002). The proposed action consists of
constructing a new Published: 2003-01-22
DEPARTMENT OF ENERGY :
Bonneville Power Administration This notice announces BPA's proposal to rebuild the Raymond-
Cosmopolis 115kilovolt transmission line in western Washington State.
The proposed rebuild is needed to increase transmission line capacity
and to address safety and reliability concerns because the transmission
line is old, physically worn, and structurally unsound in some areas.
The Published: 2003-01-14
DEPARTMENT OF ENERGY :
Bonneville Power Administration
Pages:
1
[FR Doc
03-19709] 5. Electrical Interconnection of the Summit/Westward Project
[[Page 45799]]
Substation. This decision is consistent with BPA's Business Plan Final
Environmental Impact Statement (DOE/EIS0183, June 1995) and[FR Doc
03-19251] 6. Kangley-Echo Lake Transmission Line Project
[FR Doc
03-17471] 7. Safety-Net Cost Recovery Adjustment Clause (SN CRAC); Adjustment to 2002
[FR Doc
03-11010] 8. South Fork Flathead Watershed/Westslope Cutthroat Trout Conservation Program
[FR Doc
03-7025] 9. Schultz-Hanford Area Transmission Line Project
[FR Doc
03-6690] 10. Wallula-McNary Transmission Line Project and Wallula Power Project
[FR Doc
03-6091] 11. Bonneville Power Administration's Proposed Safety-Net Cost Recovery
[FR Doc
03-1333] 12. Grand Coulee-Bell 500-kV Transmission Line Project
[FR Doc
03-682] 13. Raymond-Cosmopolis Transmission Line Rebuild Project