Agency: Bonneville Power Administration

Advanced Search

Years: 2000200120022003200420052006200720082009

Pages: 1

[FR Doc E8-27186] 1. 2008 Columbia Basin Fish Accords Memorandum of Agreement with the

This notice announces the availability of the ROD for the 2008 Columbia Basin Fish Accords Memorandum of Agreement (MOA) with the ShoshoneBannock Tribes consistent with and tiered to the Fish and Wildlife Implementation Plan Environmental Impact Statement (DOE/EIS 0312, April 2003) and ROD (October 31, 2003). BPA has decided to enter into a MOA

Published: 2008-11-17 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc E8-22357] 2. Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville

Copies of the Bonneville Purchasing Instructions (BPI), which contain the policy and establish the procedures that BPA uses in the solicitation, award, and administration of its purchases of goods and services, including construction, are available in printed form for $30, or without charge at the following Internet address:

Published: 2008-09-24 DEPARTMENT OF ENERGY : Bonneville Power Administration

[FR Doc E8-17241] 3. Shepherds Flat Wind Project

The Bonneville Power Administration (BPA) has decided to offer contract terms for the electrical interconnection into the Federal Columbia River Transmission System (FCRTS) of up to 846 megawatts of power to be generated by the proposed Shepherds Flat Wind Project (Wind Project). Caithness Shepherds Flat LLC proposes to construct and operate the

Published: 2008-07-28 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc E8-14610] 4. Willow Creek Wind Project

The Bonneville Power Administration (BPA) has decided to offer contract terms for the electrical interconnection into the Federal Columbia River Transmission System (FCRTS) of up to 72 megawatts of power to be generated by the proposed Willow Creek Wind Project (Wind Project). Willow Creek Energy, LLC proposes to construct and operate the proposed

Published: 2008-06-27 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc E8-10435] 5. Columbia Basin Fish Accords

This notice announces the availability of the ROD for the 2008 Columbia Basin Fish Accords (Accords) consistent with and tiered to the Fish and Wildlife Implementation Plan Environmental Impact Statement (DOE/EIS0312, April 2003) and ROD (October 31, 2003). BPA has decided to enter into these agreements to help mitigate the impacts of the Federal

Published: 2008-05-09 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc E8-9953] 6. 2012 Tiered Rate Methodology Proceeding; Public Hearings and Opportunities

BPA is proposing to adopt a new tiered rate design for setting its Priority Firm Power (PF) rates beginning with the FY 20122013 rate period. The primary feature of this Tiered Rate Methodology (TRM) proposal is one rate tier (Tier 1) based on generation output and costs attributed to BPA's current Federal base system resources and a second rate

Published: 2008-05-06 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc E8-9572] 7. 2012 Tiered Rate Methodology Proceeding; Public Hearings and Opportunities

BPA is proposing to adopt a new tiered rate design for setting its Priority Firm Power (PF) rates beginning with the FY 20122013 rate period. The primary feature of this Tiered Rate Methodology (TRM) proposal is one rate tier (Tier 1) based on generation output and costs attributed to BPA's current Federal base system resources and a second rate

Published: 2008-05-01 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc E8-2339] 8. 2007 Supplemental Wholesale Power Rate Adjustment Proceeding, Public

The Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act) provides that BPA must establish and periodically review and revise its rates so they are adequate to recover, in accordance with sound business principles, the costs associated with the acquisition, conservation and transmission of electric power, and to

Published: 2008-02-08 DEPARTMENT OF ENERGY : Bonneville Power Administration

[FR Doc E8-2258] 9. Proposed Methodology for Determining the Average System Cost of Resources for

Bonneville Power Administration (BPA) proposes a revised methodology for determining the average system cost (ASC) of resources for regional electric utilities that participate in the Residential Exchange Program (REP) authorized by section 5(c) of the Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act). The ASC

Published: 2008-02-07 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

[FR Doc E8-2253] 10. Proposed Wind Integration--Within-Hour Balancing Service Rate for Public

The purpose of the hearing is to adopt a rate for Wind IntegrationWithinHour Balancing Service. As increasing amounts of wind generation have integrated into BPA's Balancing Authority, the variability and uncertainty of wind generation have led to increased costs through the need for additional reserve capacity, the shift of energy generation from

Published: 2008-02-07 DEPARTMENT OF ENERGY : Bonneville Power Administration

 

Years: 2000200120022003200420052006200720082009

Pages: 1