Agency: Southwestern Power Administration

Years: 200020012002200320042005200620072008200920102011201220132014

Pages: 1

[FR Doc E8-30967] 1. Sam Rayburn Dam Power Rate Schedule

Pursuant to Delegation Order Nos. 00-037.00, effective December 6, 2001, and 00001.00C, effective January 31, 2007, the Deputy Secretary has approved and placed into effect on an interim basis Rate Order No. SWPA60, which increases the power rate for the Sam Rayburn Dam (Rayburn) pursuant to the following Sam Rayburn Dam Rate Schedule:

Rate

Published: 2008-12-30 DEPARTMENT OF ENERGY : Southwestern Power Administration

 

[FR Doc E8-27719] 2. Solicitation of Interest for Transmission Line Projects Under EPAct05 Section

The United States Department of Energy (DOE or Department) acting through the Southwestern Power Administration (Southwestern), a power marketing administration within the Department, is seeking Statements of Interest (SOIs) from entities that are interested in providing contributed funds for Southwestern's participation in the upgrade of

Published: 2008-11-21 DEPARTMENT OF ENERGY : Southwestern Power Administration

[FR Doc E8-26137] 3. Sam Rayburn Dam Power Rate

The Administrator, Southwestern Power Administration (Southwestern), has prepared Current and Revised 2008 Power Repayment Studies that show the need for an increase in annual revenues to meet cost recovery criteria. Such increased revenues are required primarily due to increases in U.S. Army Corps of Engineers' operations and maintenance

Published: 2008-11-03 DEPARTMENT OF ENERGY : Southwestern Power Administration

 

[FR Doc E8-25690] 4. Integrated System Rate Schedule Changes

Due to the omission of the P-06A Rate Schedule from the Notice of Proposed Changes to Southwestern Power Administration Rate Schedules and Opportunity for Public Review and Comment published on October 20, 2008 (73 FR 62269), this notice is a resubmission to include both the P06A and the NFTS06A Rate Schedule proposals for review and comment.

Published: 2008-10-28 DEPARTMENT OF ENERGY : Southwestern Power Administration

 

[FR Doc E8-24868] 5. Integrated System Rate Schedule Changes

The Administrator, Southwestern Power Administration (Southwestern), has determined that revisions to the Real Power Losses provisions within existing rate schedules P06 and NFTS06 are required. The Federal Energy Regulatory Commission (FERC) confirmed and approved such rates on February 27, 2007 in Docket No. EF074011000 (118 FERC ]62,162) for

Published: 2008-10-20 DEPARTMENT OF ENERGY : Southwestern Power Administration

 

[FR Doc E8-23230] 6. Robert D. Willis Hydropower Rate Schedules

Pursuant to Delegation Order Nos. 00-037.00, effective December 6, 2001, and 00001.00C, effective January 31, 2007, the Deputy Secretary has approved and placed into effect on an interim basis Rate Order No. SWPA59, which increases the power rate for the Robert Douglas Willis Hydropower Project (Willis) pursuant to the following Willis Rate

Published: 2008-10-02 DEPARTMENT OF ENERGY : Southwestern Power Administration

 

[FR Doc E8-18574] 7. Notice of Re-Opening of Public Comment Period for White River Minimum

Southwestern Power Administration (Southwestern) is re-opening the public comment period on its proposed determination of the Federal and nonFederal hydropower impacts of the White River Minimum Flows project for an additional 45 days. The original notice, issued July 3, 2008, provided a 30day comment period ending on August 4, 2008 (73 FR 38198).

Published: 2008-08-12 DEPARTMENT OF ENERGY : Southwestern Power Administration

 

[FR Doc E8-17912] 8. Robert D. Willis Power Rate

The Administrator, Southwestern Power Administration (Southwestern), has prepared Current and Revised 2008 Power Repayment Studies that show the need for an increase in annual revenues to meet cost recovery criteria. Such increased revenues are required primarily due to increases in U.S. Army Corps of Engineers' operations and maintenance

Published: 2008-08-05 DEPARTMENT OF ENERGY : Southwestern Power Administration

[FR Doc E8-15135] 9. White River Minimum Flows--Proposed Determination of Federal and Non-Federal

Section 132 of Public Law 109-103 (2005) authorized and directed the Secretary of the Army to implement alternatives BS3 and NF7, as described in the White River Minimum Flows Reallocation Study Report, Arkansas and Missouri, dated July 2004.

The law states that the Administrator, Southwestern Power Administration (Southwestern), shall

Published: 2008-07-03 DEPARTMENT OF ENERGY : Southwestern Power Administration

 

[FR Doc E8-2085] 10. White River Minimum Flows--Determination of Federal and Non- Federal

Section 132 of Public Law 109-103 (2005) authorized and directed the Secretary of the Army to implement alternatives BS3 and NF7, as described in the White River Minimum Flows Reallocation Study Report, Arkansas and Missouri, dated July 2004.

The law states that the Administrator, Southwestern Power Administration (Southwestern), shall

Published: 2008-02-05 DEPARTMENT OF ENERGY : Southwestern Power Administration

 

Years: 200020012002200320042005200620072008200920102011201220132014

Pages: 1