Browse: Departments Dates Agencies
SUBJECT CATEGORY: Havre-Rainbow Transmission Line Rebuild Project
DOCUMENT SUMMARY: The Western Area Power Administration (Western) intends to rebuild the HavreRainbow 161 kilovolt (kV) Transmission Line in central Montana. This will initially require replacement of structures. Eventually, conductors will be replaced and overhead groundwires and fiber optic cable may be added. The line lies north and west of the Missouri River and crosses the Marias and Teton Rivers near Loma, Montana, and the Big Sandy Creek near Big Sandy, Montana.
In accordance with the U.S. Department of Energy (DOE) Floodplain/ Wetland Review Requirements (10 CFR part 1022), Western will prepare a floodplain assessment and will perform the proposed actions in a manner so as to avoid or minimize potential harm to or within the affected floodplain. The floodplain assessment will be included in the Environmental Assessment being prepared by Western, in accordance with the provisions of the DOE National Environmental Policy Act Implementing Procedures (10 CFR part 1021).
SUMMARY: Havre-Rainbow Transmission Line Rebuild Project, MT,
The line crosses the Marias and Teton Rivers, at their confluence
with the Missouri River near Loma, Montana, and Big Sandy Creek near
Big Sandy, Montana. The line will affect lands mostly in private
ownership (grazing and cultivated lands), but will also cross Indian
allotted lands on the Rocky Boys Indian Reservation. There may also be
lands managed by the Bureau of Land Management and lands belonging to the State of Montana along the route.
Issued: December 12, 2001.
Michael S. Hacskaylo,
Administrator.
[FR Doc. 0131352 Filed 121901; 8:45 am]
BILLING CODE 645001P
FOR FURTHER INFORMATION CONTACT Comments should be addressed to Mr. Theodore Anderson, Environmental Specialist, Upper Great Plains Customer Service Region, Western Area Power Administration, P.O. Box 35800, Billings, Montana 591075800, email tanderso@wapa.gov. For further information on DOE Floodplain/Wetlands Environmental Review Requirements, contact Ms. Carol M. Borgstrom, Director, NEPA Policy and Compliance, EH42, U.S. Department of Energy, 1000 Independence Avenue, SW., Washington, DC 20585, telephone (202) 5864600 or (800) 4722756.
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 50 CFR Part 679 26 CFR Part 1 40 CFR Part 180 47 CFR Part 73 50 CFR Part 17 33 CFR Part 117 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 33 CFR Part 100 40 CFR Part 63 26 CFR Part 301 50 CFR Part 622 39 CFR Part 111 40 CFR Part 300 44 CFR Part 65 50 CFR Part 660 40 CFR Part 271 40 CFR Parts 52 and 81 47 CFR Part 64 50 CFR Part 665 49 CFR Part 571 44 CFR Part 64 21 CFR Part 522 14 CFR Part 23 47 CFR Part 76