Federal Register: December 31, 2001 (Volume 66, Number 250)
DOCID: FR Doc 01-32061
NUCLEAR REGULATORY COMMISSION
Nuclear Regulatory Commission
Docket ID: [Docket Nos. 50-361 and 50-362]
NOTICE: NOTICES
ACTION: Applications, hearings, determinations, etc.:
SUBJECT CATEGORY:
In the Matter of Southern California Edison Company (San Onofre Nuclear Generating Station, Units 2 and 3); Exemption
DOCUMENT SUMMARY:
I
Southern California Edison Company (the licensee) is the holder of Facility Operating License Nos. NPF10 and NPF15, which authorize operation of the San Onofre Nuclear Generating Station, Units 2 and 3, (SONGS) at power levels not to exceed 3438 megawatts thermal. The facility consists of two pressurizedwater reactors located at the licensee's site in San Diego County, California. The license provides, among other things, that the licensee is subject to all rules, regulations, and orders of the Nuclear Regulatory Commission (NRC, the Commission) now or hereafter in effect.
II
Section IV.F.2.b of Appendix E to Title 10 of the Code of Federal
Regulations (10 CFR) part 50 requires each licensee at each site to
conduct an exercise of its onsite emergency preparedness plan (EPP)
every 2 years and indicates the exercise may be included in the full
participation biennial exercise of the offsite EPP required by
paragraph 2.c. Paragraph 2.c requires the offsite EPP for each site to
be exercised biennially with full participation by each offsite
authority having a role under the plan. During such biennial full
participation exercises, the NRC evaluates onsite emergency
preparedness activities and the Federal Emergency Management Agency
(FEMA) evaluates offsite emergency preparedness activities. The licensee successfully conducted an NRC/FEMAevaluated full
participation exercise for SONGS on October 27, 28, and 29, 1999.
By letter dated September 18, 2001, the licensee requested an exemption from Sections IV.F.2.b and c of Appendix E regarding the conduct of a full participation onsite and offsite exercise originally scheduled for September 12, 2001. Specifically, the licensee requested a onetime exemption, in accordance with 10 CFR 50.12, ``Specific exemptions,'' from the requirements in 10 CFR Part 50, Appendix E, Items IV.F.2.b and c to perform a biennial exercise of the onsite and offsite EPPs with full participation of each offsite authority having a role under the plan (i.e., a full participation EPP exercise), for SONGS. A full participation onsite and offsite exercise had been scheduled for SONGS for September 12, 2001; however, as a result of the national security events occurring in the United States on September 11, 2001, this exercise was canceled. The licensee requested that the biennial exercise for 2001 not be conducted as required by Appendix E, and the next full participation exercise be conducted in 2003 and every two years thereafter.
The licensee has provided the Commission with copies of letters
from five local authorities that would participate in the full
participation EPP exercise at SONGS, requesting relief from FEMA to
cancel the 2001 SONGS full participation exercise. The letters were to
the Governor's Office of Emergency Services, State of California, which in its letter dated December 13,
[[Page 67560]]
2001, to FEMA, requested the cancellation from FEMA for the State and
the five local authorities. The State requested that the next biennial
full participation exercise to be held at SONGS with NRC/FEMA
participation be conducted in 2003. Although the requests from the
State and local authorities do not come under the responsibility and
authority of the Commission, the Commission realizes that the full
participation exercise required by Appendix E would require the
participation of the State and these local authorities. The State's
letter is addressed in the safety evaluation dated December 21, 2001.
Based on the safety evaluation dated December 21, 2001, the Commission concludes that the licensee's request for an exemption should be denied. However, because the scheduled 2001 full participation exercise to meet the regulations was canceled for good cause; there is insufficient time before January 1, 2002, when the licensee would be in violation of the regulations, to prepare and conduct the exercise; and the licensee has provided sufficient information for a oneyear schedular extension to the requirements in the regulations, the Commission concludes that such a schedular exemption to the biennial exercise requirements in Sections IV.F.b and c of Appendix E to 10 CFR Part 50 should be granted to SONGS.
The Commission, pursuant to 10 CFR 50.12(a)(1), may grant exemptions from the requirements of 10 CFR Part 50 that are authorized by law, will not present an undue risk to public health and safety, and are consistent with the common defense and security. The Commission, however, pursuant to 10 CFR 50.12(a)(2), will not consider granting an exemption unless special circumstances are present. Under 10 CFR 50.12(a)(2)(v), special circumstances are present whenever the exemption would provide only temporary relief from the applicable regulation and the licensee or applicant has made good faith efforts to comply with the regulation.
III
The revised exemption is a onetime postponement of the 2001 full participation exercise for SONGS. The full participation exercise may be conducted in 2002. It is requested that the exercise be conducted as soon as practical, but the challenges of rescheduling the exercise are recognized and the exemption is not predicated on the early conduct of the exercise. Subsequent full participation exercises for SONGS would be scheduled at no greater than 2year intervals in accordance with 10 CFR part 50, appendix E, Section IV.F.2.c. The calendar biennium for SONGS would not be affected by this schedular exemption and the next full participation exercise would be required to be performed in 2003. Accordingly, the exemption would provide only temporary relief from that regulation.
As indicated in the licensee's request for an exemption of September 18, 2001, the licensee had originally scheduled a full participation exercise for September 12, 2001. As further set forth in that letter, as a result of the national security events occurring in the United States on September 11, 2001, this exercise was canceled. Accordingly, the licensee made a good faith effort to comply with the schedular requirements of Appendix E for full participation exercises.
The NRC staff has completed its evaluation of the revised exemption. The NRC staff, having considered the schedule and resource issues resulting from this schedular exemption and the fact that the licensee successfully conducted the last full participation exercise for SONGS on October 27, 28, and 29, 1999, which was evaluated by the NRC and FEMA, and conducted a full participation ``dress rehearsal'' exercise on August 8, 2001, in preparation for the September 12, 2001, exercise that was canceled, finds the request for a schedular exemption for rescheduling the 2001 biennial full participation exercise acceptable. The inspection/evaluation by NRC and FEMA indicated that the performance demonstrated during the 1999 exercise was a satisfactory test of the EPP. In its letter, the licensee stated that it successfully conducted the ``dress rehearsal'' exercise on August 8, 2001, with the same emergency planning elements that were planned for the September 12, 2001, exercise. The NRC staff also recognizes that it was not appropriate to conduct an exercise during the period of disruption and heightened security directly after the national emergency of September 11, 2001. However, in this period of heightened security concerns regarding nuclear plant vulnerability, it is prudent to conduct the full participation exercise as soon as practical to demonstrate and maintain readiness.
IV
The Commission has determined that, pursuant to 10 CFR Part 50, Appendix E, this exemption is authorized by law, will not present an undue risk to the public health and safety, and is consistent with the common defense and security, and is otherwise in the public interest. Further, the Commission has determined, pursuant to 10 CFR 50.12(a), that special circumstances of 10 CFR 50.12(a)(v) are applicable in that the exemption would provide only temporary relief from the applicable regulation and the licensee has made good faith efforts to comply with the regulation. Therefore, the Commission hereby grants a one year schedular exemption from Sections IV.F.2.b and c of Appendix E to 10 CFR Part 50.
Pursuant to 10 CFR 51.32, the Commission has determined that the
granting of this exemption will have no significant impact on the quality of the human environment (66 FR 66000).
This exemption is effective upon issuance.
Dated at Rockville, Maryland, this 21st day of December 2001.
For the Nuclear Regulatory Commission
Ledyard B. Marsh,
Acting Director, Division of Licensing Project Management, Office of Nuclear Reactor Regulation.
[FR Doc. 0132061 Filed 122801; 8:45 am]
BILLING CODE 759001P
SUMMARY:
Southern California Edison Co.,
DOCUMENT BODY 2:
I
Southern California Edison Company (the licensee) is the holder of Facility Operating License Nos. NPF10 and NPF15, which authorize operation of the San Onofre Nuclear Generating Station, Units 2 and 3, (SONGS) at power levels not to exceed 3438 megawatts thermal. The facility consists of two pressurizedwater reactors located at the licensee's site in San Diego County, California. The license provides, among other things, that the licensee is subject to all rules, regulations, and orders of the Nuclear Regulatory Commission (NRC, the Commission) now or hereafter in effect.
II
Section IV.F.2.b of Appendix E to Title 10 of the Code of Federal
Regulations (10 CFR) part 50 requires each licensee at each site to
conduct an exercise of its onsite emergency preparedness plan (EPP)
every 2 years and indicates the exercise may be included in the full
participation biennial exercise of the offsite EPP required by
paragraph 2.c. Paragraph 2.c requires the offsite EPP for each site to
be exercised biennially with full participation by each offsite
authority having a role under the plan. During such biennial full
participation exercises, the NRC evaluates onsite emergency
preparedness activities and the Federal Emergency Management Agency
(FEMA) evaluates offsite emergency preparedness activities. The licensee successfully conducted an NRC/FEMAevaluated full
participation exercise for SONGS on October 27, 28, and 29, 1999.
By letter dated September 18, 2001, the licensee requested an exemption from Sections IV.F.2.b and c of Appendix E regarding the conduct of a full participation onsite and offsite exercise originally scheduled for September 12, 2001. Specifically, the licensee requested a onetime exemption, in accordance with 10 CFR 50.12, ``Specific exemptions,'' from the requirements in 10 CFR Part 50, Appendix E, Items IV.F.2.b and c to perform a biennial exercise of the onsite and offsite EPPs with full participation of each offsite authority having a role under the plan (i.e., a full participation EPP exercise), for SONGS. A full participation onsite and offsite exercise had been scheduled for SONGS for September 12, 2001; however, as a result of the national security events occurring in the United States on September 11, 2001, this exercise was canceled. The licensee requested that the biennial exercise for 2001 not be conducted as required by Appendix E, and the next full participation exercise be conducted in 2003 and every two years thereafter.
The licensee has provided the Commission with copies of letters
from five local authorities that would participate in the full
participation EPP exercise at SONGS, requesting relief from FEMA to
cancel the 2001 SONGS full participation exercise. The letters were to
the Governor's Office of Emergency Services, State of California, which in its letter dated December 13,
[[Page 67560]]
2001, to FEMA, requested the cancellation from FEMA for the State and
the five local authorities. The State requested that the next biennial
full participation exercise to be held at SONGS with NRC/FEMA
participation be conducted in 2003. Although the requests from the
State and local authorities do not come under the responsibility and
authority of the Commission, the Commission realizes that the full
participation exercise required by Appendix E would require the
participation of the State and these local authorities. The State's
letter is addressed in the safety evaluation dated December 21, 2001.
Based on the safety evaluation dated December 21, 2001, the Commission concludes that the licensee's request for an exemption should be denied. However, because the scheduled 2001 full participation exercise to meet the regulations was canceled for good cause; there is insufficient time before January 1, 2002, when the licensee would be in violation of the regulations, to prepare and conduct the exercise; and the licensee has provided sufficient information for a oneyear schedular extension to the requirements in the regulations, the Commission concludes that such a schedular exemption to the biennial exercise requirements in Sections IV.F.b and c of Appendix E to 10 CFR Part 50 should be granted to SONGS.
The Commission, pursuant to 10 CFR 50.12(a)(1), may grant exemptions from the requirements of 10 CFR Part 50 that are authorized by law, will not present an undue risk to public health and safety, and are consistent with the common defense and security. The Commission, however, pursuant to 10 CFR 50.12(a)(2), will not consider granting an exemption unless special circumstances are present. Under 10 CFR 50.12(a)(2)(v), special circumstances are present whenever the exemption would provide only temporary relief from the applicable regulation and the licensee or applicant has made good faith efforts to comply with the regulation.
III
The revised exemption is a onetime postponement of the 2001 full participation exercise for SONGS. The full participation exercise may be conducted in 2002. It is requested that the exercise be conducted as soon as practical, but the challenges of rescheduling the exercise are recognized and the exemption is not predicated on the early conduct of the exercise. Subsequent full participation exercises for SONGS would be scheduled at no greater than 2year intervals in accordance with 10 CFR part 50, appendix E, Section IV.F.2.c. The calendar biennium for SONGS would not be affected by this schedular exemption and the next full participation exercise would be required to be performed in 2003. Accordingly, the exemption would provide only temporary relief from that regulation.
As indicated in the licensee's request for an exemption of September 18, 2001, the licensee had originally scheduled a full participation exercise for September 12, 2001. As further set forth in that letter, as a result of the national security events occurring in the United States on September 11, 2001, this exercise was canceled. Accordingly, the licensee made a good faith effort to comply with the schedular requirements of Appendix E for full participation exercises.
The NRC staff has completed its evaluation of the revised exemption. The NRC staff, having considered the schedule and resource issues resulting from this schedular exemption and the fact that the licensee successfully conducted the last full participation exercise for SONGS on October 27, 28, and 29, 1999, which was evaluated by the NRC and FEMA, and conducted a full participation ``dress rehearsal'' exercise on August 8, 2001, in preparation for the September 12, 2001, exercise that was canceled, finds the request for a schedular exemption for rescheduling the 2001 biennial full participation exercise acceptable. The inspection/evaluation by NRC and FEMA indicated that the performance demonstrated during the 1999 exercise was a satisfactory test of the EPP. In its letter, the licensee stated that it successfully conducted the ``dress rehearsal'' exercise on August 8, 2001, with the same emergency planning elements that were planned for the September 12, 2001, exercise. The NRC staff also recognizes that it was not appropriate to conduct an exercise during the period of disruption and heightened security directly after the national emergency of September 11, 2001. However, in this period of heightened security concerns regarding nuclear plant vulnerability, it is prudent to conduct the full participation exercise as soon as practical to demonstrate and maintain readiness.
IV
The Commission has determined that, pursuant to 10 CFR Part 50, Appendix E, this exemption is authorized by law, will not present an undue risk to the public health and safety, and is consistent with the common defense and security, and is otherwise in the public interest. Further, the Commission has determined, pursuant to 10 CFR 50.12(a), that special circumstances of 10 CFR 50.12(a)(v) are applicable in that the exemption would provide only temporary relief from the applicable regulation and the licensee has made good faith efforts to comply with the regulation. Therefore, the Commission hereby grants a one year schedular exemption from Sections IV.F.2.b and c of Appendix E to 10 CFR Part 50.
Pursuant to 10 CFR 51.32, the Commission has determined that the
granting of this exemption will have no significant impact on the quality of the human environment (66 FR 66000).
This exemption is effective upon issuance.
Dated at Rockville, Maryland, this 21st day of December 2001.
For the Nuclear Regulatory Commission
Ledyard B. Marsh,
Acting Director, Division of Licensing Project Management, Office of Nuclear Reactor Regulation.