DEPARTMENT OF TRANSPORTATION

Coast Guard

CFR Citation: 33 CFR Part 117

CGD ID: [CGD07-02-098]

NOTICE: RULES

ACTION: Drawbridge operations:

DOCUMENT ACTION: Notice of temporary deviation from regulations.

SUBJECT CATEGORY: Drawbridge Operation Regulations; Atlantic Intracoastal Waterway, mile 1055.0 at Pompano Beach, Broward County, FL

DATES: This deviation is effective from 12:01 a.m. on August 2, 2002 to 8 p.m. on August 14, 2002.

DOCUMENT SUMMARY: The Commander, Seventh Coast Guard District, has approved a temporary deviation from the regulations governing the operation of the NE. 14th Street (SR 844) bridge, mile 1055.0 at Pompano Beach, Florida, from August 2 to August 14, 2002. This deviation allows this bridge to only open a singleleaf of the bridge. Doubleleaf openings will be available with a onehour advance notice to the bridge tender. This temporary deviation is required to allow the bridge owner to safely complete repairs to the bridge.

SUMMARY: Florida,


SUPPLEMENTAL INFORMATION

The SR 844 (NE. 14th Street) bridge, mile 1055.0 at Pompano Beach, Broward County, Florida, has a vertical clearance of 15 feet at mean high water and a horizontal clearance of 45 feet between the down span and the fender system. The existing operating regulations in 33 CFR 117.261(cc) require the bridge to open on signal, except that, from 7 a.m. to 6 p.m., the draw need open only on the quarterhour and threequarterhour.

The Florida Department of Transportation notified the Coast Guard on July 24, 2002, that due to an equipment malfunction, they temporarily can only operate a singleleaf of the drawbridge. A double leaf opening will be available if a onehour's notice is provided to the bridge tender, allowing enough time to bring in a work crew to open the other leaf.

The District Commander has granted a temporary deviation from the operating requirements listed in 33 CFR 117.261(cc) to complete repairs to the drawbridge. Under this deviation, the SR 844 (NE. 14th Street) bridge, mile 1055.0 at Pompano Beach, need only open a singleleaf on signal; except that, from 7 a.m. to 6 p.m., the draw need open a singleleaf on the quarterhour and threequarterhour from 12:01 a.m. on August 2, 2002, to 8 p.m. on August 14, 2002. A doubleleaf opening will be available if onehour's advance notice is provided to the bridge tender from 12:01 a.m. on August 2, 2002, to 8 p.m. on August 14, 2002.

Dated: August 1, 2002.
Greg Shapley,
Chief, Bridge Administration Branch, Seventh Coast Guard District. [FR Doc. 0220247 Filed 8802; 8:45 am] BILLING CODE 491015P

FOR FURTHER INFORMATION CONTACT Mr. Michael Lieberum, Project Officer, Seventh Coast Guard District, Bridge Section at (305) 4156744.


©2004,2005,2006 theFederalRegister.com