Browse: Departments Dates Agencies
CGD ID: [CGD08-02-021]
SUBJECT CATEGORY: Drawbridge Operating Regulations; Ouachita River, LA
DOCUMENT SUMMARY: The Commander, Eighth Coast Guard District has issued a
temporary deviation from the regulation governing the operation of the
Union Pacific Railroad vertical lift drawbridge across the Ouachita
River, mile 114.3, near Riverton, Caldwell Parish, Louisiana. This
deviation allows the draw to remain closed to navigation from 8 a.m. on
Monday, September 23, 2002 until 5 p.m. on Thursday, September 26,
2002. The deviation is necessary to allow for the installation of new dieselpowered generators and
[[Page 57148]]
some modifications of the gears in the driveline.
SUMMARY: Louisiana,
The Union Pacific Railroad requested a temporary deviation for the operation of the drawbridge to accommodate the replacement of diesel powered generators and to modify the gears in the driveline. This work is essential for continued operation of the draw span of the bridge.
In accordance with 33 CFR 117.35(c), this work will be performed
with all due speed in order to return the bridge to normal operation as
soon as possible. This deviation from the operating regulations is authorized under 33 CFR 117.35.
Dated: August 29, 2002.
Roy J. Casto,
Rear Admiral, U.S. Coast Guard, Commander, Eighth Coast Guard District.
[FR Doc. 0222828 Filed 9602; 8:45 am]
BILLING CODE 491015P
FOR FURTHER INFORMATION CONTACT Mr. Philip Johnson, Bridge Administration Branch, at the address given above or telephone (504) 5892965.
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 50 CFR Part 679 26 CFR Part 1 40 CFR Part 180 47 CFR Part 73 50 CFR Part 17 33 CFR Part 117 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 33 CFR Part 100 40 CFR Part 63 50 CFR Part 622 26 CFR Part 301 39 CFR Part 111 40 CFR Part 300 50 CFR Part 660 44 CFR Part 65 40 CFR Parts 52 and 81 40 CFR Part 271 47 CFR Part 64 50 CFR Part 665 47 CFR Part 76 50 CFR Part 229 14 CFR Part 23 14 CFR Part 25 21 CFR Part 522