Browse: Departments   Dates   Agencies  

The Federal Register

DEPARTMENT OF TRANSPORTATION

Coast Guard

CFR Citation: 33 CFR Part 117

CGD ID: [CGD01-02-141]

NOTICE: RULES

ACTION: Drawbridge operations:

DOCUMENT ACTION: Notice of temporary deviation from regulations.

SUBJECT CATEGORY: Drawbridge Operation Regulations: Cape Cod Canal, MA

DATES: This deviation is effective from December 10, 2002 through December 19, 2002.

DOCUMENT SUMMARY: The Commander, First Coast Guard District, has issued a temporary deviation from the drawbridge operation regulations that govern the Conrail Railroad Bridge across Cape Cod Canal, mile 0.7, at Bourne, Massachusetts. This temporary deviation will allow the bridge to remain closed at 60 feet above mean high water from 8 a.m. through 5 p.m., on December 10, 11, 18, and 19, 2002. This temporary deviation is necessary to facilitate vital unscheduled mechanical repairs at the bridge.

SUMMARY: Massachusetts,


SUPPLEMENTAL INFORMATION

The vertical clearance under the Conrail Railroad Bridge in the open position is 135 feet at mean high water and 139 feet at mean low water. The draw is normally in the fully open position except for the passage of rail traffic. The existing regulations are listed at 33 CFR Sec. 117.589.

The owner of the bridge, the Army Corps of Engineers (ACOE), requested a temporary deviation from the Drawbridge Operation Regulations to facilitate vital unscheduled maintenance, the replacement of the counterweight guide shoes, at the bridge. This work must be performed without delay to ensure continued safe reliable operation of the bridge.

The bridge owner advised the mariners who normally use this waterway about the necessary emergency repairs at the bridge and the temporary closures that will be required in order to facilitate the necessary repairs. No objections were received.

Under this temporary deviation the Conrail Railroad Bridge, mile 0.7, across the Cape Cod Canal, may remain closed at 60 feet above mean high water from 8 a.m. through 5 p.m. on December 10, 11, 18, and 19, 2002.

Thirty days notice to the Coast Guard for approval of this bridge maintenance was not given by the bridge owner and was not required because this work involves vital, unscheduled maintenance that must be performed without undue delay.

This deviation from the operating regulations is authorized under 33 CFR Sec. 117.35, and will be performed with all due speed in order to return the bridge to normal operation as soon as possible.

Dated: December 3, 2002.
V.S. Crea,
Rear Admiral, U.S. Coast Guard, Commander, First Coast Guard District. [FR Doc. 0231220 Filed 121002; 8:45 am]
BILLING CODE 491015P

FOR FURTHER INFORMATION CONTACT Mr. John McDonald, Project Officer, First Coast Guard District Bridge Branch, (617) 2238364.

Your Ad Here
Your Ad Here

©2004,2005,2006 theFederalRegister.com