Browse: Departments Dates Agencies
CGD ID: [CGD01-02-141]
SUBJECT CATEGORY: Drawbridge Operation Regulations: Cape Cod Canal, MA
DOCUMENT SUMMARY: The Commander, First Coast Guard District, has issued a temporary deviation from the drawbridge operation regulations that govern the Conrail Railroad Bridge across Cape Cod Canal, mile 0.7, at Bourne, Massachusetts. This temporary deviation will allow the bridge to remain closed at 60 feet above mean high water from 8 a.m. through 5 p.m., on December 10, 11, 18, and 19, 2002. This temporary deviation is necessary to facilitate vital unscheduled mechanical repairs at the bridge.
SUMMARY: Massachusetts,
The owner of the bridge, the Army Corps of Engineers (ACOE), requested a temporary deviation from the Drawbridge Operation Regulations to facilitate vital unscheduled maintenance, the replacement of the counterweight guide shoes, at the bridge. This work must be performed without delay to ensure continued safe reliable operation of the bridge.
The bridge owner advised the mariners who normally use this waterway about the necessary emergency repairs at the bridge and the temporary closures that will be required in order to facilitate the necessary repairs. No objections were received.
Under this temporary deviation the Conrail Railroad Bridge, mile 0.7, across the Cape Cod Canal, may remain closed at 60 feet above mean high water from 8 a.m. through 5 p.m. on December 10, 11, 18, and 19, 2002.
Thirty days notice to the Coast Guard for approval of this bridge maintenance was not given by the bridge owner and was not required because this work involves vital, unscheduled maintenance that must be performed without undue delay.
This deviation from the operating regulations is authorized under 33 CFR Sec. 117.35, and will be performed with all due speed in order to return the bridge to normal operation as soon as possible.
Dated: December 3, 2002.
V.S. Crea,
Rear Admiral, U.S. Coast Guard, Commander, First Coast Guard District. [FR Doc. 0231220 Filed 121002; 8:45 am]
BILLING CODE 491015P
FOR FURTHER INFORMATION CONTACT Mr. John McDonald, Project Officer, First Coast Guard District Bridge Branch, (617) 2238364.
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 26 CFR Part 1 50 CFR Part 679 40 CFR Part 180 47 CFR Part 73 33 CFR Part 117 50 CFR Part 17 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 33 CFR Part 100 40 CFR Part 63 26 CFR Part 301 50 CFR Part 622 39 CFR Part 111 40 CFR Part 300 50 CFR Part 660 44 CFR Part 65 40 CFR Parts 52 and 81 40 CFR Part 271 47 CFR Part 64 14 CFR Part 23 14 CFR Part 25 21 CFR Part 522 50 CFR Part 665 47 CFR Part 76 27 CFR Part 9