Browse: Departments Dates Agencies
SUBJECT CATEGORY: Exira Station Project in Audubon County, Iowa
DOCUMENT SUMMARY: The Western Area Power Administration (Western) has been
approached by the Western Minnesota Municipal Power Agency (WMMPA) and Missouri River Energy Services (MRES) with a request for
interconnection of the Exira Station Project (Project) with Western's
electric transmission system. The Project, as proposed, would be a gas
fired (with fuel oil backup) electrical peaking plant with an estimated
yearly electrical output averaging less than 50 megawatts (MW). Project
construction would expand an existing 0.03acre pond to approximately
0.18 acres for stormwater and process water retention and develop a new
0.46acre pond for stormwater retention. This represents a wetland
action and Western will prepare a wetland assessment as part of its
Environmental Assessment.
SUMMARY: Audubon County, IA; Exira Station Project,
Western's CrestonDennison 161kV Transmission Line crosses the
northeast corner of the 76acre parcel. The electrical output of the
plant would be interconnected to this line by a new 2,000foot long,
161kV transmission line that would travel almost straight east from
the power plant along the northern border of the site. Onsite [[Page 40654]]
groundwater wells would supply the nonpotable water for plant
operation. Potable water would be brought to the site as bottled water.
There are two small ephemeral ponds on the site. One is on the west side of the site and is about 0.03 acres. The other pond on the north side of the property is about 0.01 acres in size. All ponds eventually drain to the East Nishnabotna River. Plant process water effluents and stormwater runoff would be discharged to the larger pond, which would need to be expanded. The existing 0.03acre pond would be excavated to provide a deeper basin and a larger surface area. The proposed action would raise the existing dike on the larger pond sufficient to increase the size of the pond to 0.18 acres. The result would be a 0.15acre increase of wetland habitat in the project area. The new 161kV transmission line would span the other pond which would not be impacted by the Project. Also, a new pond would be developed to capture stormwater runoff during construction and operation. The new pond would be constructed by excavating a low area just east of the proposed plant site and creating a berm near the northern property boundary. The resulting pond would be approximately 0.46 acres with a depth of 1 to 2 feet during and after storm events.
In accordance with the Department of Energy's Floodplain/Wetlands
Review Requirements (10 CFR part 1022), Western will prepare a wetland
assessment and will perform the proposed actions to avoid or minimize
potential harm to or within the wetland. The wetland assessment will
examine the use of the wetland as a stormwater and waste water
retention basin and evaluate avoidance, mitigation, or compensation to
minimize loss of wetland habitat. The wetland is located in Audubon
County, Iowa, in T. 78 N., R. 35 W., section 31. Maps and further information are available from the contacts listed above.
Dated: June 27, 2003.
Michael S. Hacskaylo,
Administrator.
[FR Doc. 0317198 Filed 7703; 8:45 am]
BILLING CODE 645001P
FOR FURTHER INFORMATION CONTACT Mr. Dirk Shulund, Environmental Protection Specialist, Upper Great Plains Customer Service Region, Western Area Power Administration, P.O. Box 35800, Billings, MT 59107 5800, fax (406) 2477408, email Shulund@wapa.gov.
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 50 CFR Part 679 47 CFR Part 73 26 CFR Part 1 40 CFR Part 180 33 CFR Part 117 50 CFR Part 17 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 33 CFR Part 100 40 CFR Part 63 50 CFR Part 622 44 CFR Part 65 50 CFR Part 660 26 CFR Part 301 39 CFR Part 111 40 CFR Part 300 6 CFR Part 5 40 CFR Part 271 47 CFR Part 64 40 CFR Parts 52 and 81 50 CFR Part 665 44 CFR Part 64 10 CFR Part 50 49 CFR Part 571 47 CFR Part 76