Federal Register: October 15, 2003 (Volume 68, Number 199)
DOCID: FR Doc 03-25988
NUCLEAR REGULATORY COMMISSION
Nuclear Regulatory Commission
Docket ID: [Docket No. 50-346; License No. NPF-3]
NOTICE: NOTICES
ACTION: Applications, hearings, determinations, etc.:
SUBJECT CATEGORY:
Firstenergy Nuclear Operating Company, Davis-Besse Nuclear Power Station, Unit 1; Receipt of Request for Action Under 10 CFR 2.206
DOCUMENT SUMMARY:
Notice is hereby given that by petition dated August 25, 2003, submitted by Greenpeace on behalf of the Nuclear Information & Resource Service and the Union of Concerned Scientists (collectively, the Petitioners), the U.S. Nuclear Regulatory Commission (NRC) has been requested to take enforcement actions against FirstEnergy Nuclear Operating Company (FirstEnergy), the licensee for DavisBesse Nuclear Power Station in Oak Harbor, Ohio, and the NRC has also been requested to suspend the DavisBesse license and prohibit plant restart until certain conditions have been met.
As bases for requesting the NRC to take enforcement actions against
the licensee, the Petitioners state that FirstEnergy has failed to
complete commitments related to the NRC's 50.54(f) design basis letter
(issued on October 9, 1996), and refer to numerous design basis violations dating back to
[[Page 59420]]
plant licensing. The petitioners request that the NRC suspend the
DavisBesse license and prohibit plant restart until all design basis
deficiencies identified in response to the NRC's 50.54(f) design basis
letter are adequately addressed, the plant probabilistic risk
assessment (PRA) is updated to reflect design flaws, and no systems are in a ``degraded but operable'' condition.
The request is being treated pursuant to 10 CFR 2.206 of the Commission's regulations. The request has been referred to the Director of the NRC's Office of Nuclear Reactor Regulation (NRR). As provided by Section 2.206, appropriate action will be taken on this petition within a reasonable time.
A copy of the petition is available in the Agencywide Documents
Access and Management System (ADAMS) for inspection at the Commission's
Public Document Room (PDR), located at One White Flint North, 11555
Rockville Pike (first floor), Rockville, Maryland, and from the ADAMS
Public Library component on the NRC's Web site, http://www.nrc.gov/readingrm/adams.html (the Public Electronic Reading Room), using
Accession No. ML032400435. Persons who do not have access to ADAMS or
who encounter problems in accessing the documents located in ADAMS
should contact the NRC's PDR reference staff by telephone at 18003974209 or 3014154737 or by email to pdr@nrc.gov.
Dated at Rockville, Maryland, this 7th day of October, 2003.
For the Nuclear Regulatory Commission.
J.E. Dyer,
Director, Office of Nuclear Reactor Regulation.
[FR Doc. 0325988 Filed 101403; 8:45 am]
BILLING CODE 759001P
SUMMARY:
FirstEnergy Nuclear Operating Co.,
DOCUMENT BODY 2:
Notice is hereby given that by petition dated August 25, 2003, submitted by Greenpeace on behalf of the Nuclear Information & Resource Service and the Union of Concerned Scientists (collectively, the Petitioners), the U.S. Nuclear Regulatory Commission (NRC) has been requested to take enforcement actions against FirstEnergy Nuclear Operating Company (FirstEnergy), the licensee for DavisBesse Nuclear Power Station in Oak Harbor, Ohio, and the NRC has also been requested to suspend the DavisBesse license and prohibit plant restart until certain conditions have been met.
As bases for requesting the NRC to take enforcement actions against
the licensee, the Petitioners state that FirstEnergy has failed to
complete commitments related to the NRC's 50.54(f) design basis letter
(issued on October 9, 1996), and refer to numerous design basis violations dating back to
[[Page 59420]]
plant licensing. The petitioners request that the NRC suspend the
DavisBesse license and prohibit plant restart until all design basis
deficiencies identified in response to the NRC's 50.54(f) design basis
letter are adequately addressed, the plant probabilistic risk
assessment (PRA) is updated to reflect design flaws, and no systems are in a ``degraded but operable'' condition.
The request is being treated pursuant to 10 CFR 2.206 of the Commission's regulations. The request has been referred to the Director of the NRC's Office of Nuclear Reactor Regulation (NRR). As provided by Section 2.206, appropriate action will be taken on this petition within a reasonable time.
A copy of the petition is available in the Agencywide Documents
Access and Management System (ADAMS) for inspection at the Commission's
Public Document Room (PDR), located at One White Flint North, 11555
Rockville Pike (first floor), Rockville, Maryland, and from the ADAMS
Public Library component on the NRC's Web site, http://www.nrc.gov/readingrm/adams.html (the Public Electronic Reading Room), using
Accession No. ML032400435. Persons who do not have access to ADAMS or
who encounter problems in accessing the documents located in ADAMS
should contact the NRC's PDR reference staff by telephone at 18003974209 or 3014154737 or by email to pdr@nrc.gov.
Dated at Rockville, Maryland, this 7th day of October, 2003.
For the Nuclear Regulatory Commission.
J.E. Dyer,
Director, Office of Nuclear Reactor Regulation.
[FR Doc. 0325988 Filed 101403; 8:45 am]