SUBJECT CATEGORY: Intent To Prepare a Draft Environmental Impact Statement/ Environmental Impact Report (EIS/EIR) for a Permit Application for the Berths 136-147 Terminal Improvement Project, Also Known as the TraPac Container Terminal in the Port of Los Angeles, Los Angeles County, CA
DOCUMENT SUMMARY: The U.S. Army Corps of Engineers (Corps) Los Angeles District in conjunction with the Los Angeles Harbor Department (Port) is examining the feasibility of waterside, terminal and transportation improvements at Berths 136147 in the Port of Los Angeles. The Corps is considering the Port's application for a Department of the Army permit under Clean Water Act section 404 and River and Harbor Act section 10 to conduct dredge and fill activities and construct one new wharf approximately 705 feet and seismically upgrade two wharves approximately 3,022 feet in length associated with the proposed project.
Major project elements to be covered in the Draft EIS/EIR include: Wharf construction and landside improvements. The landside developments will include expansion, redevelopment and construction of marine terminal facilities, and transportation infrastructure improvements including construction of grade separations, and potential realignment of road and railways.
The primary Federal involvement is the discharge of dredge and/or
fill materials within waters of the United States, work (e.g. dredging)
and structures in or affecting navigable waters of the United States,
and potential impacts on the human environment from such activities.
Therefore, in accordance with the National Environmental Policy Act (NEPA), the Corps is requiring the
[[Page 61192]]
preparation of an Environmental Impact Statement (EIS) prior to
rendering a final decision on the Port's permit application. The Corps
may ultimately make a determination to permit or deny the above project or permit or deny modified versions of the above project.
Pursuant to the California Environmental Quality Act (CEQA), the Port will serve as Lead Agency for the Preparation of an Environmental Impact Report (EIR). The Corps and the Port have agreed to jointly prepare a Draft EIS/EIR for the improvements at Berth 136147 in order to optimize efficiency and avoid duplication. The Draft EIS/EIR is intended to be sufficient in scope to address both the Federal and the state and local requirements and environmental issues concerning the proposed activities and permit approvals.
SUMMARY: Los Angeles County, CA—; Port of Los Angeles Berths 136-147 Terminal Improvement Project,
The project's overall goals are to upgrade the container cargo
handling efficiency at the Berths 136147 Terminal, increase its cargo
handling capacity, and to improve transportation infrastructure in
order to accommodate forecasted and planned increases in the volume of
containerized goods shipped through the Port. In order to meet these goals, the following objectives must be met:
[sbull] Establish needed container facilities that would maximize
the use of existing waterways and integrate into the Port's overall
utilization of available shoreline, while maintaining opportunities for the future integration with adjacent terminals;
[sbull] Construct sufficient container berthing and infrastructure
capacity to accommodate foreseeable increases in containerized cargo volumes entering the Port;
[sbull] Create sufficient backland area for optimal container
terminal operations including, storage, transport, and on/offloading of container ships in a safe and efficient manner;
[sbull] Provide access to rail and truck infrastructure locations
in order to minimize surface transportation congestion or delays and
promote transport to both local and distant cargo destinations; and
[sbull] Provide needed container terminal accessory buildings and
structures to support containerized cargo handling requirements.
2. Proposed Action. The first phase of construction would
consolidate most of this area into a single terminal and upgrade its
operations by increasing backland capacity, constructing approximately
705 feet of new wharf, upgrading wharves to handle modern container
terminal ships, adding an ondock rail yard to reduce container truck
traffic, constructing two grade separations to facilitate rail and
truck shipments, and constructing a noise barrier (with landscaping and
recreational facilities) along Harry Bridges Boulevard. The Harry
Bridges Boulevard realignment would move the existing roadway
approximately 580 feet north toward ``C'' Street. As a result of these
improvements, the gross terminal area would increase in size from 176
acres to 238 acres with a corresponding increase in throughput
capacity. The improvements would make the facility more efficient. The
proposed project elements for the Phase I construction period include: Phase I Berth 136147
[sbull] Construction Stage I (completed by 2005)
(1) Construction and operation of a new 705foot wharf (78,135
square feet) at Berths 145147. There would be no loss of waters of the U.S.
(2) Dredging of 265,000 cubic yards (cy) of material along the
waterfront at Berths 145147 to match approved53 MLLW channel depths,
with material to be placed at confined disposal site(s) (CDF) at either
the Port of Los Angeles or the Port of Long Beach or at an appropriate upland site.
(3) Construction of 179,500 cy of rock dike, placement of 24,000 cy
of fill behind the dike, and placement of 699 concrete piles at Berths 145147.
(4) Construction and development of 62 acres of additional backland area for container storage.
(5) Construct a 3,200foot long noise barrier between the realigned
Harry Bridges Boulevard and residences along ``C'' Street between Figueroa Street and Lagoon Avenue.
(6) Two existing 50gauge cranes would be removed and one new 100
gauge crane would be erected. The other four 100gauge cranes on Berths 142146 would remain.
(7) Construction of an ondock intermodal container terminal
facility (ICTF) rail yard within the former location of the Pier A rail yard.
(8) Construction and operation of two grade separations at Neptune
Avenue and Avalon Boulevard to eliminate potential traffic delays that would otherwise be caused by trains.
(9) Construction of additional terminal gate facilities and accessory buildings.
Proposed improvements in this area would expand backlands for
container terminal use and improve wharves to efficiently handle
increased cargo throughput and deep draft container ships. The backland
expansion would increase the terminal size from 238 acres to
approximately 250 acres. The proposed projects elements for the Phase II construction period include:
[sbull] Construction Stage II (20052010)
(1) Improvements and upgrades to approximately 2,000 feet of
wharves at Berths 136139 including dredging to handle the planned 53 foot channel depth.
(2) Redevelopment of the vacated area at the Westway and Water
Street sites into approximately 14 acres of additional backland.
(3) The existing seven 100gauge cranes on Berths 136139 would remain.
3. Issues. There are several potential environmental issues that
will be addressed in the EIS/EIR. Additional issues may be identified
during the scoping process. Issues initially identified as potentially significant include:
(a) Geological issues, including dredging and stabilization of fill areas in an area of known seismic activity;
(b) Impacts to hydrology;
(c) Impacts to air quality;
(d) Impacts to traffic, including marine navigation and ground transportation;
(e) Potential for noise impacts;
(f) Impacts to public utilities and services;
(g) Potential impacts to aesthetic resources, including light and glare;
(h) Potential impacts on public health and safety;
[[Page 61193]]
(i) Cumulative impacts; and
4. Alternatives. Alternatives initially being considered for the proposed improvement project include the following:
(a) Alternate location(s) for the Terminal Improvements (within the State or within the Ports of Los Angeles/Long Beach).
(b) Development of new landfills for a container terminal.
(c) Noncontainerized use of terminal (i.e., lumber, autos).
(d) Nonshipping use i.e., park, cruise terminal, commercial development, empty container storage, etc.
(e) No Federal action (No wharf construction or dredging
construction of only backlands developments for Phases I and II) with and without Harry Bridges being relocated.
(f) Larger facility (14acre fill for more storage area).
(g) Reduce Wharf (reduced fill'reduction in riprap, pilings, and dredging).
(h) Proposed project without Harry Bridges Boulevard being relocated.
5. Scoping Process. The Corps and the Port will conduct separate,
simultaneous English and Spanish language public scoping meeting on
November 5, 2003 at 6 p.m., to receive public comment and assess public
concerns regarding the appropriate scope and preparation of the Draft
EIS/EIR. The meeting will be held at the Wilmington Recreational Center
at 325 North Neptune Avenue. Parties interested in being added to the
Corps' electronic mail notification list for the Port of Los Angeles
can register at: http://www.spl.usace.army.mil/regulatory/register.html. This list will be used in the future to notify the
public about scheduled hearings and availability of future public
notices. Participation in the public meeting by federal, state and
local agencies and other interested organizations and persons are encouraged.
6. Availability of the Draft EIS/EIR. The joint lead agencies
expect the Draft EIS/EIR to be made available to the public in July
2004. A public hearing will be held during the public comment period for the Draft EIS/EIR.
Dated: October 9, 2003.
Richard G. Thompson,
Colonel, U.S. Army, District Engineer.
[FR Doc. 0326969 Filed 102403; 8:45 am]
BILLING CODE 371092P
FOR FURTHER INFORMATION CONTACT Questions about the proposed action and Draft EIS/EIR can be answered by Mr. Joshua Burnam, Corps Project Manager, at (213) 4523294. Comments shall be addressed to: U.S. Army Corps of Engineers, Los Angeles District, Regulatory Branch. ATTN: File Number 200301142JLB PO Box 532711, Los Angeles, CA 900532325, and Dr. Ralph Appy, Director of Environmental Management, Port of Los Angeles, 425 S. Palos Verdes St., San Pedro, CA 90731.
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 50 CFR Part 679 47 CFR Part 73 26 CFR Part 1 40 CFR Part 180 33 CFR Part 117 50 CFR Part 17 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 33 CFR Part 100 40 CFR Part 63 50 CFR Part 622 44 CFR Part 65 50 CFR Part 660 26 CFR Part 301 39 CFR Part 111 40 CFR Part 300 6 CFR Part 5 40 CFR Part 271 47 CFR Part 64 40 CFR Parts 52 and 81 50 CFR Part 665 44 CFR Part 64 10 CFR Part 50 49 CFR Part 571 47 CFR Part 76