SUBJECT CATEGORY: The Release of the Draft Environmental Impact Statement and the Announcement of a Public Hearing for the Relocation of Bogue Inlet Channel Between Emerald Isle and Hammocks Beach State Park, and the Placement of the Dredged Material onto Emerald Isle Beach, in Carteret County, NC
DOCUMENT SUMMARY: The U.S. Corps of Engineers (COE), Wilmington District, Wilmington Regulatory Field Office has received a request for Department of the Army authorization, pursuant to section 404 of the Clean Water Act and section 10 of the Rivers and Harbor Act, from the Town of Emerald Isle for the relocation of Bogue Inlet Channel to protect residential homes and town infrastructures, and to place the dredged material on approximately 5.0 miles of beach for nourishment. The project is being proposed to move the main ebb channel in Bogue Inlet to a more central location between the west end of Bogue Banks and the east end of Bear Island (Hammocks Beach State Park). The main ebb channel through Bogue Inlet presently occupies a position juxtaposed to the west end of the Town of Emerald Isle and is causing severe erosion that threatens development in the subdivision known as The Pointe.
The relocation of the main ebb channel to a central location would restore the channel to a position it occupied in the late 1970s and eliminate the erosive impact of tidal currents on the east shoulder of the inlet. A portion of the material removed to relocate the main ebb channel would be used to close the existing channel with the balance of the material used to nourish the shoreline on the west end of the Town of Emerald Isle.
The channel through Bogue Inlet has been maintained by the COE for commercial and recreational boating interest since 1981. The COE is authorized to maintain the channel to a depth of 8 feet mean low water (mlw) over a width of 150 feet. Any changes in the location of the ebb tide delta channel would be consistent with this maintenance criteria.
SUMMARY: Carteret County, NC; Bogue Inlet Channel relocation; public hearing,
Secondary features of the proposed project includes using a portion of the dredged material to close the existing ebb channel with the balance of the material used to nourish approximately 24,000 linear feet (5.0 miles) of beach along the west end of the Town of Emerald Isle. In this regard, the Town of Emerald Isle presently has permits to nourish 51,100 (9.68 miles) of ocean shoreline using offshore borrow areas. Approximately 5.8 miles of this shoreline was nourished between January and March 2003. The Emerald Isle beach nourishment project is part of an islandwide project sponsored by Carteret County. The County project covers approximately 16.8 miles of ocean shoreline and begins at the east town limits of the Town of Pine Knoll Shores and ends at a point 8,000 feet (1.5 miles) east of Bogue Inlet.
2. Proposed Action. The primary purpose of the channel relocation project is to create a stable channel that will divert tidal flow away from the Pointe area of Emerald Isle. Therefore, the design focus is on developing channel dimensions that will capture the majority of the ebb tidal flow through the inlet. An added feature of the overall design would be the closure of the existing channel by using approximately 200,000 cubic yards of material to construct a sand dike across the existing channel in the vicinity of the Pointe. The dimensions of the relocated channel are sized to capture the tidal prism of Bogue inlet and to divert flow away from the Point shoreline. The optimum channel has been determined to have a channel depth of 13.5 feet NGVD and a maximum width of 500 feet. The construction of the new channel would require the removal of approximately 1,009,500 cubic yards of feet.
The material to be removed has a mean diameter of 0.30 mm, compared to 0.22mm native beach material, and contains 1.25% silt and minimal shell content.
Apart from the channel dimensions, the new channel must be position so that it does not cause adverse impacts on the adjacent shorelines or result in unacceptable loss of estuarine habitat. The selection of a channel location was based on detailed geomorphic analysis of the inlet and adjacent shorelines, conducted by Dr. William J. Cleary, University of North Carolina at Wilmington. The geomorphic analysis will utilize an assortment of aerial photographs of the inlet covering the period from 1938 to 2001. However the primary emphasis will be on changes in the inlet and the adjacent shorelines between 1973 and 2001. The geomorphic analysis consists of an evaluation of the following: (a) Location of the channel midpoint relative to the Pointe, (b) the orientation of the inlet's ebb tide delta channel, (c) the configuration of the ebb tide delta i.e., the percent of the ebb tide delta east and west of the main ebb channel, (d) inlet shoulder changes (the Pointe shoreline and the west tip of Bear Island), (e) changes in the ocean shoreline on the west end of Bogue Banks and the east end of Bear Island (Hammocks Beach State Park), and (f) changes in the interior marsh islands (primarily Dudley Island and Island 2). The measured changes the adjacent shorelines, inlet shoulders, and the interior marshes will be related to changes in the physical makeup of the inlet including the position and orientation of the ebb tide delta channel and the configuration of the ebb tide delta.
Geomorphic analysis indicates that the cumulative shoreline changes on each island were averaged over 3,500 feet of shoreline immediately adjacent to the inlet. When the percent of the ebb tide delta on the Bogue Banks side is small, as is was between 1984 and 2001, the bar channel was located close to Bogue Banks and the portion of the delta on the Bogue Banks side was providing some degree of wave sheltering for the west end of the island. This particular ebb tide delta configuration resulted in a considerable amount of accretion along the 3,500foot shoreline immediately east of the inlet while Bear Island experienced an almost mirror image response on its ocean shoreline, i.e. erosion. Even though the present ebb tide delta configuration is favorable for the extreme west end of Emerald Isle, the eastward migration of the inlet channel that led to the existing inlet configuration also caused the inlet shoreline of Bogue Banks (the Pointe shoreline) to erode. Not only has the Bogue Banks inlet shoreline eroded in response to the eastward movement of the channel, so has the Bear Island ocean and inlet shorelines. Based on these and numerous other comparisons, the preliminary results of the geomorphic analysis indicates that a centrally located channel, approximating the position and orientation of the channel in 1978, may be beneficial to the inlet shoreline on Bogue Banks (the Pointe shoreline) and the east end of Bear Island.
3. Alternatives. Several alternatives have been identified and evaluated through the scoping process, and further detailed description of all alternatives is disclosed in Section or Chapter 3 of the Draft EIS.
The applicant's preferred alternative is to relocate the channel to a central location and to utilize the dredged material to nourish approximately 5.0 miles of beach.
4. Scoping Process. A public scoping meeting was held on October
29, 2002 and a Project Delivery Team (PDT) was developed to provide
input in the preparation of the EIS. The PDT is comprised of local, state, and federal
[[Page 64323]]
government officials, local residents, nonprofit organizations, local fisherman, and a university professor.
The COE has initiated consultation with the U.S. Fish and Wildlife
Service under the Endangered Species Act and the Fish and Wildlife
Coordination Act, and with the National Marine Fisheries Service under
the MagnusonStevens Act and Endangered Species Act. Additionally, the
EIS has assessed the potential water quality impacts pursuant to
Section 401 of the Clean Water Act, and is coordinating with the North
Carolina Division of Coastal Management (DCM) to determine the projects
consistency with the Coastal Zone Management Act. The COE is
coordinating closely with DCM in the development of the EIS to ensure
the process complies with State Environmental Policy Act (SEPA)
requirements, as well as the NEPA requirements. The Draft EIS has been
designed to consolidate both NEPA and SEPA processes to eliminate duplications.
Dated: November 4, 2003.
George T. Burch,
Chief of Staff.
FOR FURTHER INFORMATION CONTACT Questions about the proposed action and DEIS can be directed to Mr. Mickey Sugg, Wilmington Regulatory Field Office, telephone: (910) 2514811.
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 50 CFR Part 679 47 CFR Part 73 26 CFR Part 1 40 CFR Part 180 33 CFR Part 117 50 CFR Part 17 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 33 CFR Part 100 40 CFR Part 63 50 CFR Part 622 44 CFR Part 65 50 CFR Part 660 26 CFR Part 301 39 CFR Part 111 40 CFR Part 300 6 CFR Part 5 40 CFR Part 271 47 CFR Part 64 40 CFR Parts 52 and 81 50 CFR Part 665 44 CFR Part 64 10 CFR Part 50 49 CFR Part 571 47 CFR Part 76