SUBJECT CATEGORY: Intent To Prepare a Draft Programmatic Environmental Impact Statement for Coastal Erosion Protection and Community Relocation, Shishmaref, AK
DOCUMENT SUMMARY: The U.S. Army Engineer District, Alaska, intends to prepare a Draft Programmatic Environmental Impact Statement (DEIS) to evaluate the feasibility of constructing erosion protection alternatives and community relocation alternatives at Shishmaref, Alaska. Shishmaref, population 562, is on a barrier island on the Chukchi Sea on the northwestern coast of Alaska. The shoreline at the community is being rapidly eroded by storm waves possibly because the ice pack has been forming later in the autumn than in the past, allowing more of the force of late season storm energy to reach the shore. The programmatic DEIS will determine whether Federal action is warranted, and if so, and community relocation is selected, site alternatives will be addressed in more detail in a second tier of the EIS process.
SUMMARY: Shishmaref, AK; coastal erosion protection and community relocation,
The programmatic DEIS will consider alternatives including the
continuation of erosion protection structures to prevent land and
property losses. The community has obtained funding for efforts to
protect a stretch of the beach to the west of the school property where
a Bureau of Indian Affairs road is at risk. The Corps of Engineers
currently is conducting an emergency bank protection study to protect the school. Longer term protection for the
[[Page 65452]]
community would require that erosion protection be extended past the
school property and to adjacent roads along the shoreline. The
feasibility of further and more extensive bank protection would be
analyzed and compared with relocation alternatives. Relocation would
mean the abandonment of the Shishmaref community on the island.
Relocation alternatives include moving the people of Shishmaref to a
larger hub community such as Nome or Kotzebue where they would be
incorporated into the fabric of that community; moving the population
to a smaller, closer community such as Wales or Deering, which would
involve developing additional infrastructure in those locations, and
constructing a new town site on the mainland. The last alternative
would be based on engineering criteria, historical tribal area boundaries, and corridors to subsistence sites.
Issues: The programmatic DEIS will consider the need of Shishmaref to preserve its community identity and the potential impacts of the alternatives on the cultural resources and infrastructure of the community. In addition, the programmatic DEIS will address the importance of maintaining the community's traditional subsistence lifestyles, while providing modern infrastructure and housing. Issues associated with relocation to an existing community include property and business losses, impacts of social/cultural changes, and impacts on the infrastructure capacity of the receiving location. Issues associated with relocation and construction of a new town site includes engineering constructability criteria and environmental suitability. Constructability criteria include geologic stability, availability of fill material, and potable water sources. Environmental issues include effects to endangered species and wildlife habitat, and justifiable and practicable mitigation measures. Other resources and concerns will be identified through scoping, public involvement, and interagency coordination.
Scoping: A copy of this notice and additional public information
will be sent to interested parties to initiate scoping. All parties are
invited to participate in the scoping process by identifying any
additional concerns, issues, studies, and alternatives that should be
considered. A scoping meeting will be held in Shishmaref, Alaska, in
early 2004 at a place and time to be announced. The programmatic DEIS is scheduled for release in 2005 or 2006.
Guy R. McConnell,
Chief, Environmental Resources Section.
FOR FURTHER INFORMATION CONTACT Lizette Boyer (907) 753-2637, Alaska District, U.S. Army Corps of Engineers, Environmental Resources Section (CEPOAENCWER), P.O. Box 6898, Elmendorf AFB, AK 995066898. Email: Lizette.P.Boyer@poa02.usace.army.mil.
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 50 CFR Part 679 47 CFR Part 73 26 CFR Part 1 40 CFR Part 180 33 CFR Part 117 50 CFR Part 17 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 33 CFR Part 100 40 CFR Part 63 50 CFR Part 622 44 CFR Part 65 50 CFR Part 660 26 CFR Part 301 39 CFR Part 111 40 CFR Part 300 6 CFR Part 5 40 CFR Part 271 47 CFR Part 64 40 CFR Parts 52 and 81 50 CFR Part 665 44 CFR Part 64 10 CFR Part 50 49 CFR Part 571 47 CFR Part 76