Browse: Departments Dates Agencies
Docket ID: [Docket No. PRM-50-74]
SUBJECT CATEGORY: Nuclear Energy Institute; Denial of Petition for Rulemaking
DOCUMENT SUMMARY: The Nuclear Regulatory Commission (NRC) is denying a petition for rulemaking (PRM5074) submitted by the Nuclear Energy Institute (NEI or petitioner). The petitioner requested that the NRC amend its regulations regarding emergency core cooling systems to allow licensees the optional use of the 1994 American Nuclear Society (ANS) decay heat standard and to allow the use of any future NRCapproved revisions of the standard without additional rulemaking. The NRC is denying the petition primarily because an option to use bestestimate evaluation models is already available to its licensees, which would allow additional operational flexibility. Also, the requested rulemaking would reduce conservatism in an individual portion of NRC regulations without consideration of other potential overall nonconservatism within that portion of the regulations.
SUMMARY: Nuclear Energy Institute; denied,
Section 50.46 specifies the performance criteria against which the emergency core cooling system (ECCS) must be evaluated. The criteria include the maximum peak cladding temperature, the maximum cladding oxidation thickness, the maximum total hydrogen generation, and requirements to assure a coolable core geometry and abundant longterm cooling. This regulation also states that the calculated ECCS cooling performance following postulated lossofcoolant accidents (LOCAs) must be calculated in accordance with either a realistic (also called best estimate) evaluation model that accounts for uncertainty or an evaluation model that conforms with the required conservative features of Appendix K evaluation models. The use of the 1971 ANS standard on decay heat calculation is one of the features required in the Appendix K ECCS evaluation models.
On September 6, 2001, the Nuclear Energy Institute (NEI) submitted a petition for rulemaking (PRM), designated PRM5074. NEI proposed a rulemaking to amend Appendix K to 10 CFR part 50 to allow licensees the optional use of the 1994 ANS decay heat standard and to allow the use of any future NRCapproved revisions of the standard without additional rulemaking.
In PRM5074, the petitioner stated that the 1994 ANS decay heat standard incorporates more precise results and uses a statistical approach to address uncertainty. The petitioner proposed a rulemaking to amend Appendix K to 10 CFR part 50 to allow licensees the optional use of this most current consensus decay heat standard. The petitioner indicated that the amendment would (1) allow licensees to gain operating margin for ECCS equipment based on the more realistic decay heat assumptions in the 1994 ANS standard; (2) result in more effective utilization of resources in operating and maintaining the ECCS equipment; and (3) result in the potential for higher extended power uprates.
The notice of receipt of the petition and request for public comment was published in the Federal Register (FR) on October 11, 2001 (66 FR 51884). The public comment period ended on December 26, 2001. Five letters of public comment were received in response to PRM5074. Four letters from industry (the Progress Energy Company, the Tennessee Valley Authority, Strategic Teaming and Resource Sharing, and the Nuclear Management Company) were in favor of the proposal, and one letter from an individual (Mr. Bob Leyse) was opposed. Mr. Leyse stated that ``the entire body of ECCS evaluation models should be reviewed by the NRC rather than a piecemeal approach of selecting only those aspects that may be unduly restrictive.''
The NRC is denying PRM5074 primarily because Sec. 50.46 already includes provisions for the use of bestestimate evaluation models by NRC licensees. In addition, the request would reduce conservatism in an individual portion of NRC regulations without consideration of other potential overall nonconservatism within that portion of the regulations.
The provisions of Sec. 50.46 allow licensees use of ``best estimate'' evaluation models to perform analysis of ECCS cooling performance during LOCAs. This approach provides licensees with a more accurate determination of their plants' response to a LOCA, while allowing additional operational flexibility. The bestestimate evaluation represents improved and modern techniques in analyzing LOCA behavior. Thus, the NRC prefers the use of bestestimate models, rather than the piecemeal approach to updating the Appendix K evaluation models.
A concomitant factor that influenced the NRC's position is the NRC's awareness of a number of phenomena that are known to contribute nonconservatism to the Appendix K evaluation models. These phenomena include boiling in the downcomer annulus during reflood, downcomer entrainment and inventory reduction due to steam bypass, and fuel relocation following cladding swelling during the temperature transient. The NRC believes that if changes are made in the decay heat standard, then changes would also have to be considered in other models to ensure that an appropriate level of overall conservatism is retained in the ECCS evaluation model package.
In addition, the NRC has evaluated the advantages and disadvantages of the rulemaking requested by the petitioner with respect to the four NRC Strategic Performance Goals as follows:
1. Maintaining Safety: The NRC believes that the requested rulemaking would not make a significant contribution to maintaining safety because the overall conservatism provided by the Appendix K evaluation models may not be appropriately accounted for if the conservatism of using the 1971 ANS decay heat standard is individually removed.
2. Enhancing Public Confidence: The proposed rulemaking would not enhance public confidence without an overall assessment of ECCS evaluation model conservatism. The NRC believes that if changes are made in the decay heat standard, then changes would also have to be considered in other models to ensure that an appropriate level of overall conservatism is retained in the ECCS evaluation model package.
3. Improving Efficiency and Effectiveness: The NRC staff believes that it would not be efficient and effective to modify the Appendix K evaluation model using a piecemeal approach when the ``bestestimate'' evaluation model is already available for licensees use.
4. Reducing Unnecessary Regulatory Burden: The NRC agrees that the proposed rule would reduce licensees' regulatory burden. However, the NRC does not agree that the associated burden is ``unnecessary'' in the absence of a demonstration that overall conservatism retained in the Appendix K evaluation models would remain adequate. For reasons cited in this document, the NRC denies the petition.
Dated at Rockville, Maryland, this 26th day of November, 2003.
For the Nuclear Regulatory Commission.
J. Samuel Walker,
Acting Secretary of the Commission.
[FR Doc. 0330148 Filed 12303; 8:45 am]
BILLING CODE 759001P
FOR FURTHER INFORMATION CONTACT Peter C. Wen, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 205550001, telephone (301) 4152832, email pxw@nrc.gov.
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 50 CFR Part 679 47 CFR Part 73 26 CFR Part 1 40 CFR Part 180 33 CFR Part 117 50 CFR Part 17 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 33 CFR Part 100 40 CFR Part 63 50 CFR Part 622 44 CFR Part 65 50 CFR Part 660 26 CFR Part 301 39 CFR Part 111 40 CFR Part 300 6 CFR Part 5 40 CFR Part 271 47 CFR Part 64 40 CFR Parts 52 and 81 50 CFR Part 665 44 CFR Part 64 10 CFR Part 50 49 CFR Part 571 47 CFR Part 76