Docket ID: [Docket No. FEMA-B-7447]
SUBJECT CATEGORY: Proposed Flood Elevation Determinations
DOCUMENT SUMMARY: Technical information or comments are requested on the proposed Base (1% annualchance) Flood Elevations (BFEs) and proposed BFE modifications for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that the community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP).
SUMMARY: Various States,
These proposed BFEs and modified BFEs, together with the floodplain management criteria required by 44 CFR 60.3, are the minimum that are required. They should not be construed to mean that the community must change any existing ordinances that are more stringent in their floodplain management requirements. The community may at any time enact stricter requirements of its own, or pursuant to policies established by other Federal, State, or regional entities. These proposed elevations are used to meet the floodplain management requirements of the NFIP and are also used to calculate the appropriate flood insurance premium rates for new buildings built after these elevations are made final, and for the contents in these buildings.
National Environmental Policy Act. This proposed rule is categorically excluded from the requirements of 44 CFR Part 10, Environmental Consideration. No environmental impact assessment has been prepared.
Regulatory Flexibility Act. The Mitigation Division Director of the Emergency Preparedness and Response Directorate certifies that this proposed rule is exempt from the requirements of the Regulatory Flexibility Act because proposed or modified BFEs are required by the Flood Disaster Protection Act of 1973, 42 U.S.C. 4104, and are required to establish and maintain community eligibility in the NFIP. No regulatory flexibility analysis has been prepared.
Regulatory Classification. This proposed rule is not a significant [[Page 44633]]
regulatory action under the criteria of Section 3(f) of Executive Order
12866 of September 30, 1993, Regulatory Planning and Review, 58 FR 51735.
Executive Order 12612, Federalism. This proposed rule involves no policies that have federalism implications under Executive Order 12612, Federalism, dated October 26, 1987.
Executive Order 12778, Civil Justice Reform. This proposed rule meets the applicable standards of Section 2(b)(2) of Executive Order 12778.
Administrative practice and procedure, Flood insurance, Reporting and recordkeeping requirements.
Accordingly, 44 CFR Part 67 is proposed to be amended as follows: PART 67[AMENDED]
1. The authority citation for Part 67 continues to read as follows:
Authority: 42 U.S.C. 4001 et seq.; Reorganization Plan No. 3 of 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR, 1979 Comp., p. 376.
2. The tables published under the authority of Sec. 67.4 are proposed to be amended as follows:
Maps are available for inspection at the Plumas County Planning Department, 520 Main Street, Room 21, Quincy, California 95971.
Send comments to The Honorable Kenneth Nelson, Chairman, Plumas County Board of Supervisors, 520 Main Street, Room 121, Quincy, California 95971.
Oregon............................... Durham (City),.......... Fanno Creek.............................. At confluence with the Tualatin River..................... *126 *125
Washington County....... At Burlington Northern Railroad........................... *126 *125
Tualatin River........................... At Interstate Highway 5................................... *123 *123
At Burlington Northern Railroad (Just upstream of *126 *125
confluence with Fanno Creek). [[Page 44634]]
*Elevation in feet
Maps are available for inspection at City Hall, 17160 Southwest Upper Boones Ferry Road, Durham, Oregon 97281.
Send comments to The Honorable Gerry Schirado, Mayor, City of Durham, P.O. Box 23483, Durham, Oregon 97281.
Oregon............................... Tigard (City),.......... Ash Creek................................ Confluence with Fanno Creek............................... *160 *160
Just upstream of Oak Street............................... *169 *170
Washington County....... Fanno Creek.............................. At Burlington Northern Railroad........................... *126 *126
At Southwest Scholls Ferry Road........................... *162 *164
Summer Creek............................. At confluence with Fanno Creek............................ *157 *158
Just upstream of 135th Avenue............................. *175 *176
Tualatin River........................... At confluence with Fanno Creek............................ *126 *125
Approximately 1.6 miles upstream of confluence with Fanno *127 *127
Creek. *Elevation in feet
Maps are available for inspection at the Engineering Department, City Hall, 13125 Southwest Hall Boulevard, Tigard, Oregon 97223.
Send comments to The Honorable James Griffith, Mayor, City of Tigard, 13125 Southwest Hall Boulevard, Tigard, Oregon 97223.
Oregon............................... Beaverton (City),....... Fanno Creek.............................. Just upstream of Southwest Scholls Ferry Road............. *163 *165
Washington County....... Approximately 850 feet upstream of Southwest Scholls Ferry *196 *198
Road. *Elevation in feet
Maps are available for inspection at the Community Development Department, City Hall, 4755 Southwest Griffith Drive, Beaverton, Oregon 97076.
Send comments to The Honorable Rob Drake, Mayor, City of Beaverton, P.O. Box 4755, Beaverton, Oregon 97076.
Oregon............................... Washington County....... Ash Creek................................ Just upstream of Southwest Hall Boulevard................. *170 *171
Just upstream of Hemlock Street........................... *181 *181
Fanno Creek.............................. Just upstream of Scholls Ferry Road....................... *193 *197
Approximately 200 feet upstream of BeavertonHillsdale *244 *243
Highway. *Elevation in feet
Maps are available for inspection at the Department of Land Use and Transportation, 155 North First Avenue, Suite 350, MS 12, Hillsboro, Oregon 97124.
Send comments to The Honorable Tom Brian, Chairman, Washington County Board of Commissioners, 155 North First Avenue, Suite 300, Hillsboro, Oregon 97124.
(Catalog of Federal Domestic Assistance No. 83.100, ``Flood Insurance.'')
Dated: July 20, 2004.
David I. Maurstad,
Acting Director, Mitigation Division, Emergency Preparedness and Response Directorate.
[FR Doc. 0417033 Filed 72604; 8:45 am]
BILLING CODE 911012P
FOR FURTHER INFORMATION CONTACT Doug Bellomo, P.E. Hazard Identification Section, Emergency Preparedness and Response Directorate, Federal Emergency Management Agency, 500 C Street, SW., Washington, DC 20472, (202) 6462903.
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 50 CFR Part 679 26 CFR Part 1 40 CFR Part 180 47 CFR Part 73 50 CFR Part 17 33 CFR Part 117 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 33 CFR Part 100 40 CFR Part 63 50 CFR Part 622 26 CFR Part 301 39 CFR Part 111 40 CFR Part 300 50 CFR Part 660 44 CFR Part 65 40 CFR Parts 52 and 81 40 CFR Part 271 47 CFR Part 64 50 CFR Part 665 47 CFR Part 76 50 CFR Part 229 14 CFR Part 23 14 CFR Part 25 21 CFR Part 522