Federal Register: November 19, 2004 (Volume 69, Number 223)
DOCID: FR Doc 04-25711
ENVIRONMENTAL PROTECTION AGENCY
Environmental Protection Agency
ER ID: [ER-FRL-6657-7]
NOTICE: NOTICES
ACTION: Environmental statements; availability, etc.:
SUBJECT CATEGORY:
Environmental Impact Statements; Notice of Availability
DOCUMENT SUMMARY:
Responsible Agency: Office of Federal Activities, General
Information (202) 5647167 or http://www.epa.gov/compliance/nepa. Weekly receipt of Environmental Impact Statements
Filed November 8, 2004, Through November 12, 2004
Pursuant to 40 CFR 1506.9.
EIS No. 040445, FINAL EIS, AFS, WY, ID, High Mountains HeliSkiing
(HMH) Project, Issuance of a New 5Year Special Use Permit (SUP) to
Continue Operating Guided Helicopter Skiing in Portions of the Bridger
Teton National Forest and CaribouTarghee National Forest (CTNF), Teton
and Lincoln Counties, WY and Teton and Bonneville Counties, ID, Wait
Period Ends: December 20, 2004, Contact: Ray Spencer (307) 7395400.
Revision of FR Notice Published on 09/24/2004: CEQ Wait Period
Ending 10/25/2004 has been Reestablished to 12/20/2004. Due to
Incomplete Distribution of the FEIS at the time of Filing with USEPA under Section 1506.9 of the CEQ Regulations.
EIS No. 040527, DRAFT EIS, AFS, IN, German Ridge Restoration Project,
To Restore Native Hardwood Communities, Implementation, Hoosier
National Forest, Tell City Ranger District, Perry County, IN, Comment
Period Ends: January 3, 2005, Contact: Ron Ellis (812) 2755987.
EIS No. 040528, DRAFT EIS, FHW, OH, Eastern Corridor MultiModal (Tier
1) Project, To Implement a MultiModal Transportation Program between
the City of Cincinnati and Eastern Suburbs in Hamilton and Clermont
Counties, OH, Comment Period Ends: January 3, 2005, Contact: Mark VonderEmbse (614) 2806854.
EIS No. 040529, DRAFT EIS, COE, MA, Cape Wind Energy Project, Construct
and Operate 30 Wind Turbine Generators on Horseshoe Shoal in Nantucket
Sound, MA, Comment Period Ends: January 18, 2005, Contact: Karen Adams (978) 3188338.
EIS No. 040530, FINAL EIS, FRC, LA, Sabine Pass Liquefied Natural Gas
(LNG) and Pipeline Project, Construction and Operation LNG Import
Terminal and Natural Gas Pipeline Facilities, Several Permits, [[Page 67730]]
Cameron Parish, LA, Wait Period Ends: December 20, 2004, Contact: Thomas Russo (866) 2083372.
EIS No. 040531, FINAL EIS, AFS, MO, East Fredericktown Project, To
Restore Shortleaf Pine, Improve Forest Health, Treat Affected Stands
and Recover Valuable Timber Products, Mark Twain National Forest,
Potosi/Fredericktown Ranger District, Bollinger, Madison, St. Francois
and Ste. Genevieve Counties, MO, Wait Period Ends: December 20, 2004, Contact: Ronnie Raum (573) 3644621.
EIS No. 040532, FINAL EIS, FHW, IN, IN25 Transportation Corridor
Improvements from I65 Interchange to U.S. 24, Funding, Rightof Way
and U.S. Army COE Section 404 Permit Issuance, Hoosier Heartland
Highway, Tippecanoe, Carroll and Cass Counties, IN, Wait Period Ends: December 20, 2004, Contact: Matt Fuller (317) 2265234.
EIS No. 040533, FINAL EIS, FHW, WA, WA104/Edmonds Crossing Project,
Connecting Ferries, Bus and Rail, Funding, NPDES Permit and COE Section
10 and 404 Permit, City of Edmonds, Snohomish County, WA, Wait Period Ends: December 20, 2004, Contact: Peter Eun (360) 753955 .
EIS No. 040534, FINAL EIS, COE, FL, Picayune Strand Restoration
(formerly Southern Golden Gate Estates Ecosystem Restoration),
Comprehensive Everglades Restoration Plan, Implementation, Collier
County, FL, Wait Period Ends: December 20, 2004, Contact: Bradley A. Foster (904) 2322110.
EIS No. 040535, DRAFT EIS, AFS, UT, Duck Creek Fuels Treatment
Analysis, To Reduce Fuels, Enhance FireTolerant Vegetation and Provide
Fuel Breaks, Dixie National Forest, Cedard City Ranger District, Kane
County, UT, Comment Period Ends: January 3, 2005, Contact: David Swank (435) 8653700.
Dated: November 16, 2004.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities. [FR Doc. 0425711 Filed 111804; 8:45 am]
BILLING CODE 656050P
SUMMARY:
Weekly receipts,
DOCUMENT BODY 2:
Responsible Agency: Office of Federal Activities, General
Information (202) 5647167 or http://www.epa.gov/compliance/nepa. Weekly receipt of Environmental Impact Statements
Filed November 8, 2004, Through November 12, 2004
Pursuant to 40 CFR 1506.9.
EIS No. 040445, FINAL EIS, AFS, WY, ID, High Mountains HeliSkiing
(HMH) Project, Issuance of a New 5Year Special Use Permit (SUP) to
Continue Operating Guided Helicopter Skiing in Portions of the Bridger
Teton National Forest and CaribouTarghee National Forest (CTNF), Teton
and Lincoln Counties, WY and Teton and Bonneville Counties, ID, Wait
Period Ends: December 20, 2004, Contact: Ray Spencer (307) 7395400.
Revision of FR Notice Published on 09/24/2004: CEQ Wait Period
Ending 10/25/2004 has been Reestablished to 12/20/2004. Due to
Incomplete Distribution of the FEIS at the time of Filing with USEPA under Section 1506.9 of the CEQ Regulations.
EIS No. 040527, DRAFT EIS, AFS, IN, German Ridge Restoration Project,
To Restore Native Hardwood Communities, Implementation, Hoosier
National Forest, Tell City Ranger District, Perry County, IN, Comment
Period Ends: January 3, 2005, Contact: Ron Ellis (812) 2755987.
EIS No. 040528, DRAFT EIS, FHW, OH, Eastern Corridor MultiModal (Tier
1) Project, To Implement a MultiModal Transportation Program between
the City of Cincinnati and Eastern Suburbs in Hamilton and Clermont
Counties, OH, Comment Period Ends: January 3, 2005, Contact: Mark VonderEmbse (614) 2806854.
EIS No. 040529, DRAFT EIS, COE, MA, Cape Wind Energy Project, Construct
and Operate 30 Wind Turbine Generators on Horseshoe Shoal in Nantucket
Sound, MA, Comment Period Ends: January 18, 2005, Contact: Karen Adams (978) 3188338.
EIS No. 040530, FINAL EIS, FRC, LA, Sabine Pass Liquefied Natural Gas
(LNG) and Pipeline Project, Construction and Operation LNG Import
Terminal and Natural Gas Pipeline Facilities, Several Permits, [[Page 67730]]
Cameron Parish, LA, Wait Period Ends: December 20, 2004, Contact: Thomas Russo (866) 2083372.
EIS No. 040531, FINAL EIS, AFS, MO, East Fredericktown Project, To
Restore Shortleaf Pine, Improve Forest Health, Treat Affected Stands
and Recover Valuable Timber Products, Mark Twain National Forest,
Potosi/Fredericktown Ranger District, Bollinger, Madison, St. Francois
and Ste. Genevieve Counties, MO, Wait Period Ends: December 20, 2004, Contact: Ronnie Raum (573) 3644621.
EIS No. 040532, FINAL EIS, FHW, IN, IN25 Transportation Corridor
Improvements from I65 Interchange to U.S. 24, Funding, Rightof Way
and U.S. Army COE Section 404 Permit Issuance, Hoosier Heartland
Highway, Tippecanoe, Carroll and Cass Counties, IN, Wait Period Ends: December 20, 2004, Contact: Matt Fuller (317) 2265234.
EIS No. 040533, FINAL EIS, FHW, WA, WA104/Edmonds Crossing Project,
Connecting Ferries, Bus and Rail, Funding, NPDES Permit and COE Section
10 and 404 Permit, City of Edmonds, Snohomish County, WA, Wait Period Ends: December 20, 2004, Contact: Peter Eun (360) 753955 .
EIS No. 040534, FINAL EIS, COE, FL, Picayune Strand Restoration
(formerly Southern Golden Gate Estates Ecosystem Restoration),
Comprehensive Everglades Restoration Plan, Implementation, Collier
County, FL, Wait Period Ends: December 20, 2004, Contact: Bradley A. Foster (904) 2322110.
EIS No. 040535, DRAFT EIS, AFS, UT, Duck Creek Fuels Treatment
Analysis, To Reduce Fuels, Enhance FireTolerant Vegetation and Provide
Fuel Breaks, Dixie National Forest, Cedard City Ranger District, Kane
County, UT, Comment Period Ends: January 3, 2005, Contact: David Swank (435) 8653700.
Dated: November 16, 2004.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities. [FR Doc. 0425711 Filed 111804; 8:45 am]
BILLING CODE 656050P