DOCUMENT SUMMARY: This document contains the proposed implementation plan of Section 1502 of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEALU) for the Highways for LIFE (HfL) Pilot Program to offer the opportunity for comment into the development of the final implementation document. LIFE is an acronym for ``Longlasting, Innovative, Fast construction of Efficient and safe pavements and bridges.'' The purpose of the HfL Pilot Program is to accelerate the rate of adoption of innovations and technologies, thereby improving safety and highway quality while reducing congestion caused by construction. This will be accomplished through technology transfer, technology partnerships, information dissemination, incentive funding of up to 20 percent, but not more than $5 million on Federalaid highway projects (eligible for assistance under Chapter 1 of title 23, United States Code) and HfL program accountability.
SUMMARY: Highways for LIFE Pilot Program,
DOCUMENT BODY 2:
Implementation of the Highways for LIFE Pilot Program
You may submit or retrieve online through the Document Management system (DMS) at: http://dmses.dot.gov/submit. The DMS is available 24 hours each day, 365 days each year. Electronic submission and retrieval help and guidelines are available under the help section of the Web site.
An electronic copy of this document may be downloaded by using the Internet to reach the Office of the Federal Register's Home page at http://www.access.gpo.gov/nara. HfL Pilot Program
This notice presents the proposed implementation plan for the HfL Pilot
[[Page 77447]]
Program, as outlined in Sections 1101 and 1502 of the Safe,
Accountable, Flexible, Efficient Transportation Equity Act: A Legacy
for Users (SAFETEALU) (Pub. L. 10959, August 10, 2005), and it
provides an opportunity for comment into the development of the final implementation document.
Reflecting on the condition of existing highways and the traditional processes used for building new ones, the American public has expressed, through national and local surveys, public meetings, and other means, a need for an improved driving experience. Elements such as reducing congestion in construction work zones, reducing construction time, a need for improved levels of safety and quality, and more cost effective approaches have become the subject of much concern.
Congress intended the HfL pilot program to incentivize the use of innovative technologies and practices with the expectation that safe, efficient highways and bridges can be built faster, and with greater durability. The legislation reflects an understanding that the best approach to improving the quality of the highway system is made by working through the individuals and organizations charged with designing, building, and operating it. HfL intends to create an atmosphere that encourages and enables the rapid adoption of innovations in the design, construction and operation of highways.
The HfL program has six program elements, which are discussed in detail below. These program elements are as follows: Technology transfer, technology partnerships, information dissemination, projects, funding, and accountability.
The key approach for improving the quality of the highway system is the application of existing but underutilized, high payoff highway innovations, such as, equipment, techniques, processes, materials and management processes. The key to using these innovations is a knowledgeable workforce that is aware of the benefits and committed to improving the driving experience of all Americans.
The purpose of the technology transfer initiative is to train, inform, motivate, enable and equip the highway community workforce to more efficiently deliver projects that meet the HfL Pilot Program performance goals using the above mentioned innovations. Components of the technology transfer program may include technology training for public and private sector personnel, a knowledge exchange Web site where practitioners can log on and share ideas, technology workshops, and HfL project showcases demonstrating the actual use of the technology. The phrase, ``technology transfer'' has long been used to describe the process for taking such infrequently used innovations and making them standard approaches that a transportation agency is comfortable using on a daytoday basis. Unfortunately, it has traditionally taken years or even decades to bring about such adoptions. This delay is not merely a factor of limited resources, workload, lack of awareness, and conservatism on the part of agency staffs, but also a lack of a standard concentrated approach for rolling out innovations. As part of the HfL program, a major effort will be undertaken to develop an improved technology transfer process to significantly speed the adoption of innovations. This improved technology transfer process will be piloted focusing on a few innovations.
Specifically, FHWA is proposing an innovation in each of the areas
of safety, congestion and quality. These innovations need to be
national in scope and have the potential for adding significant
benefits to the highway community and highway users. The FHWA has
already proposed three innovations that meet the HfL criteria:
Prefabricated Bridge Systems and Elements; \1\ Road Safety Audits; \2\
and ``Making Work Zones Work Better.'' \3\ Focusing on these three
innovations does not mean that they are requirements for any proposed
HfLfunded project. On the contrary, as outlined later in this
document, any innovation that addresses the HfL performance goals may be used in an HfLfunded project.
\1\ For more information on Prefabricated Bridge Elements and
systems go to: http://. safety.fhwa.dot.gov/index.htm.
\3\ For more information on ``Making Work Zones Work Better'' go
to: http://www.ops.fhwa.dot.gov/wz/index.asp.
Additional technology transfer efforts would be provided by the HfL
program through an innovations workshop for each HfLfunded project.
The workshop may be similar in scope and structure to the Accelerated
Construction Technology Transfer \4\ workshops sponsored by the
American Association of State Highway and Transportation Officials (AASHTO) and FHWA.
\4\ For more information on ACTT go to: http://www.fhwa.dot.gov/construction/accelerated .
Within the HfL Pilot Program, Technology Partnerships are intended to foster the development, improvement and creation of innovative technologies and facilities, including the use of proprietary products, technologies or methodologies. Due to limited resources, the FHWA intends to focus this element of the HfL program on refining and improving existing innovations for application on highway construction. The FHWA would enter into either a grant or cooperative agreement with public or private organizations to jointly fund or otherwise participate in adapting and/or making marketready innovations to support the HfL Pilot Program. These agreements may be with traditional partners in the highway construction business or other organizations outside of the highway industry, which have promising innovations that can be made ready for timely implementation.
The HfL Technology Partnerships have a twofold purpose: First, they are intended to foster the implementation of underutilized innovations that will improve the safety, speed of highway construction, quality, cost effectiveness, and durability of pavements and bridges. Second, they provide an opportunity for those not involved in construction of the HfL projects aspect of the program to participate in, contribute to, and benefit from the program.
The HfL Technology Partnerships would provide financial impetus needed to move some of the many proven but underutilized innovations and methods into routine practice in the highway industry. Innovations brought forward through the technology partnerships may be used in the HfL Projects and promoted through HfL technology transfer and information dissemination.
To be considered for participation, the innovation must have been used successfully in highway, transportation, or in some related venue which has a clear potential for successful use in the United States highway industry.
A detailed approach to technology partnerships has not yet been
developed because this is an area where stakeholder and industry input
is needed. Due to the desire to obtain input, as well as the lower
level of funding in the first year of the HfL program, it is proposed
that funding for Technology Partnerships would begin in fiscal year
2007. However some deviations may be necessary, since the HfL
technology partnerships effort focuses on proven technologies, rather
than research. The FHWA is interested in feedback on approaches to technology partnerships.
[[Page 77448]]
An essential component of transferring technology is information dissemination, including the communication of the HfL goals, concepts and services. Communicating the HfL story is critical for several reasons: First, without a high level of communication, there would be no ``technology transfer;'' innovative approaches would remain with those people who initially employed them. Secondly, recounting others' successes tends to instill within organizations a higher level of competition and peerpressure to keep up with the rest of the community.
Although Information Dissemination is a major element of Technology Transfer, the importance of this communication element within the overall HfL Pilot Program is sufficient to create a separate category of activities. One key reason is that others, outside the primary audience of individuals and organizations who design, build, and operate the nation's highways, need to be informed as well about safer, less congested and improved quality highways and bridges. The driving public, for example, needs to be a key recipient because they are the ultimate beneficiaries of the overall effort. Providing the information starts the dialog to ensure that activities undertaken within the program really are pertinent to improving the public's driving experience. Finally, the public needs to be informed because public opinion can be a major motivator to getting individuals and organizations who are slow to adopt innovations to move faster. Telling the public about the highway community's push for better roads and the HfL projects builds goodwill and shows an appropriate level of responsiveness to the public's need. It demonstrates that the highway community is being a good steward of the public trust. It also has the potential to show highway builders the benefits of using HfL approaches on more of their projects.
A key tool for information dissemination would be the publicizing HfL success stories, showing how innovation can improve safety, reduce constructionrelated congestion, and improve quality, and why it is beneficial to pursue nontraditional approaches and innovations.
Communication tools such as publications, videos, special events, media relations, the Internet, and a webbased Community of Practice can be employed in getting information on the various elements of the HfL program to different audiences. Specifically, those audiences may include the highway community, academia, associated industries and private sector groups, schools, elected officials, media, and the public in general.
Another facet of information dissemination will be publicizing the success of each of the HfL demonstration projects. This will be accomplished at the local, regional and national levels and will be done during and after construction. The focus in publicizing the HfL project success stories will be on the innovations, the resulting benefits and the people in the State DOT, Industry and Division Office that made it happen. One technique may be the establishment of an annual awards program and celebration for the HfL projects. Another technique would be a ribbon cutting ceremony for the HfL project. Additionally, HfL can work with other organizations such as the national Partnership on Highway Quality, industry associations, American Automobile Association, American Trucking Associations, State DOT Public Affairs offices in publicizing HfL projects and the people involved in constructing the projects. Positive information dissemination coupled with recognition will be used as a means to perpetuate the behavior and outcomes achieved on the HfL projects. Projects
While training such as that outlined previously in the technology transfer section is important, the challenge is to get the transportation professional to put that training to use on an actual project. Such onthejob experience will be provided through the Projects activity of the HfL program. State transportation agencies will be asked to submit applications to the FHWA Division Offices for HfL incentives for specific projects where it intends to employ innovations that it was not used or rarely used in its State.
Funding construction projects within the HfL program will allow for detailed documentation of the potential improvements in safety, constructionrelated congestion and quality that can be achieved through the application of innovations on actual projects. It may also serve as a new business model for how a State manages its highway project delivery process. The demonstration will involve showing the highway community and the public how the HfL projects are designed, built, and perform. Widespread demonstration of successes will, in turn, provide the impetus for more widespread application of the performance goals and innovations in the future.
Paragraphs (a)(3) and (b)(4)(A) of Section 1502 of SAFETEALU makes reference to ``performance standards.'' In the HfL program, the term ``performance standards'' are also synonymous with ``performance goals,'' which define the desired end result to be achieved on the projects. The FHWA has selected performance goals to put the emphasis on the highway motorist's needs, to foster the acceptance and adoption of innovations, and to reinforce the need to address all goalssafety, congestion, user satisfaction, and qualityin every project. The individual HfL performance goals would be set at levels representing the best the highway community has and is able to produce.
In proposing performance goals for HfL projects, the FHWA considered whether a candidate goal has a highway community accepted definition, metric, measure, method, procedure, process and/or equipment. Candidate goals were evaluated with these considerations since it is expected that the State and its contractor(s) will be monitoring the goals for the design and/or construction of HfL projects.
It is FHWA's intention that the approved HfL projects would include
the Performance Goals in each of the goal areas. The performance goals
being considered for the first year of HfL projects include: Safety
The FHWA is interested in feedback concerning the following specific aspects of application of the HfL performance goals:
An annual solicitation for HfL projects is planned for the Spring of 2006. The FHWA intends to publish a notice in the Federal Register requesting submittal of project applications. It is anticipated that a project solicitation will also be done in 2007, 2008 and 2009. Additionally, the announcement would be publicized through various other means, including posting on the World Wide Web, providing facilitation by the FHWA Division Offices, and through other outreach to the States. The State DOT would submit applications electronically to their FHWA Division Office. The application, along with FHWA Division recommendation would then be forwarded to FHWA headquarters. Eligibility Criteria
Section 1502(b)(2) of SAFETEALU establishes the eligibility
criteria for a project's participation in the HfL pilot program. The eligibility criteria includes:
Section 1502(b)(1) of SAFETEA requires States to submit an
application to the Secretary in order for a project to participate in
the HfL pilot program. This application must contain the following information:
Section 1502(b)(4) of SAFETEALU establishes the selection criteria for approving projects for participation in the HfL pilot program. This criteria requires the Secretary to give priority to projects that:
In addition, the Secretary will also give priority to projects where the State demonstrates a willingness to participate in subsequent technology transfer and information dissemination activities associated with the project(s).
HfL project applications will be evaluated and recommendations for selection made to the Secretary of Transportation. The evaluation committee will be composed of FHWA staff who will evaluate project applications based on the priorities noted above.
Section 1502 establishes a maximum of 15 projects per year that may receive HfL funding. In considering such factors as the purpose and scope of the program available funding and the various associated costs and activities needed for each HfL construction project to contribute to the desired outcome, it is proposed that the total number of HfL projects be kept at 15 per year, with the understanding that FHWA may consider adding projects to take advantage of unique opportunities. Funding
SAFETEALU, Section 1101(a)(20) established total program funding
at $75,000,000 through 2009, including $15,000,000 for fiscal year
2006, and $20,000,000 for each of fiscal years 2007 through 2009. This
funding includes incentive grants of up to 20 percent, but not more
than $5 million of the total cost of qualifying demonstration projects.
A maximum of 15 projects may receive incentive funds in any fiscal
year. Up to 100 percent Federal share is also allowed on HfL
demonstration projects. There is a goal of providing funds for at least one project in each
[[Page 77450]]
State by 2009. A State may also use up to 10 percent of its National
Highway System, Surface Transportation Program, Congestion Mitigation
and Air Quality Improvement or Interstate Maintenance funds for HfL
eligible projects as matching funds up to 100 percent in any fiscal
year. Based on the level of incentive funding provided in SAFETEALU,
it is anticipated that individual project funding levels will be in the $500,000 to $1,000,000 range per project.
The majority of the 2006 HfL funding, in the order of 60 percent, will be used for projects; a significant portion of the funds, approximately 30 percent, will be used for technology transfer and the remainder of the funds would be expended on technology partnerships, information dissemination and stakeholder input and involvement. This approximate distribution of funds includes the costs for monitoring and evaluation for each element. The HfL spending plan will be evaluated yearly and adjusted accordingly.
As a means of ensuring appropriate stewardship of public funds, the HfL program will include several monitoring and evaluation efforts to measure the effectiveness of the program and projects, as well as stakeholder input and involvement procedures. Although the individual activities within the HfL program will require extensive effort and funding, there will need to be measurements beyond the basic levels of success or failure of those activities taken individually. The higher level of evaluation should reflect the primary objective of the program as a whole: to improve the highway system as indicated by measurement of safety, construction congestion, quality and user satisfaction on HfL projects.
The FHWA has the lead for monitoring and evaluation of HfL projects, and would be responsible for data collection, data storage and access, analysis, and reporting. FHWA personnel and private contractors will be used for this function. The owners of HfLfunded projects would supply or provide access to data and information. Costs associated with these activities are an eligible project expense. The FHWA Division Offices would serve as points of contact and coordination between the FHWA's contractor(s) and the State.
The monitoring and evaluation effort will be used to fully describe and quantify the outputs, results, and outcomes in the goal areas and to provide an assessment of the benefits derived from the overall investment. A cost effective economic analysis on HfL projects will be conducted by the FHWA HfL using economic techniques for measuring and valuing user cost; this might include but not be limited to EventOnly Analysis, Life Cycle Cost Analysis or BenefitCost Analysis. The resulting information would serve as a resource to highway program decision makers on the value of the innovations demonstrated in the HfL projects, help maintain the momentum needed to achieve the HfL goals, demonstrate the value of the entire pilot program, and provide the basis for projecting the benefits gained from expanding such an approach in the future.
The monitoring and evaluation element would encompass the entire HfL program. For the HfL projects, information collected prior to, during, and immediately after construction would include a full array of highway condition, financing, design, contracting, construction, operations, and safety data, as well as user statistics and opinions. The costs, outcomes, impacts, and benefits of the technology partnerships would also be fully documented. To the extent possible, information collected for the technology transfer and information dissemination aspects would include objective measures of the effectiveness and impact of the individual activities that are undertaken, in addition to information on the costs of those activities. The information gathered on the HfL projects, technology transfer and technology partnerships will also be used in research and development for the next generation of technologies and innovations and future technology transfer initiatives.
The HfL stakeholders include highway owners, builders, suppliers,
consultants, academicians, users (commercial motor carriers, motorists,
bicyclist, and pedestrians), and those impacted secondarily by highways
(neighbors and adjacent landowners, receivers of goods shipped over
highways). Through stakeholder input and involvement, the FHWA desires
to refine the approach and implementation of the HfL program as well as
to build ownership for the program. Stakeholder input and involvement
will be an ongoing element of the HfL program in order to evaluate the
progress of the program, consider appropriate redirection in light of
progress, and assess of the overall program results. Stakeholders would
have opportunities to provide input on both the HfL Implementation plan, and the conduct of the program itself, including:
The FHWA is considering several stakeholder input and involvement
approaches for the HfL program. Providing information and soliciting
feedback would happen routinely through notices published in the
Federal Register, presentations at highway town hall meetings or
regional forums, and the establishment of a webbased communications
interchange site, or ``Community of Practice'' on the HfL Internet Web
site http://www.fhwa.dot.gov/hfl/.
(Authority: Public Law 10959 Section 1502, 23 U.S.C. 502 and 23 U.S.C. 315)
Issued on December 23, 2005.
J. Richard Capka,
Acting Federal Highway Administrator.
[FR Doc. E58107 Filed 122905; 8:45 am]
BILLING CODE 491022P
FOR FURTHER INFORMATION CONTACT Ms. Kathleen Bergeron, Office of
Infrastructure, HIHL1, (202) 3665508; Mr. Michael Harkins, Office of the Chief Counsel, HCC30, (202) 3664928; Federal Highway
Administration, 400 Seventh Street, SW., Washington, DC 205900001.
Office hours are from 7:45 a.m. to 4:15 p.m., e.t., Monday through
Friday, except Federal holidays.
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 50 CFR Part 679 47 CFR Part 73 26 CFR Part 1 40 CFR Part 180 33 CFR Part 117 50 CFR Part 17 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 33 CFR Part 100 40 CFR Part 63 50 CFR Part 622 44 CFR Part 65 50 CFR Part 660 26 CFR Part 301 39 CFR Part 111 40 CFR Part 300 6 CFR Part 5 40 CFR Part 271 47 CFR Part 64 40 CFR Parts 52 and 81 50 CFR Part 665 44 CFR Part 64 10 CFR Part 50 49 CFR Part 571 47 CFR Part 76