Browse: Departments Dates Agencies
CGD ID: [CGD01-06-078]
SUBJECT CATEGORY: Drawbridge Operation Regulations; Long Island, New York Inland Waterway From East Rockaway Inlet to Shinnecock Canal, Jones Beach, NY
DOCUMENT SUMMARY: The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Loop Parkway Bridge, across Long Creek at mile 0.7, at Jones Beach, New York. This deviation will test a change to the drawbridge operation schedule to determine whether a permanent change to the schedule is needed. This deviation will allow the bridge to open on signal for all marine traffic, Monday through Friday twice an hour at twenty and fifty minutes after the hour, from 6:20 a.m. to 7:20 p.m., except that, between 9:50 a.m. and 3:20 p.m., the bridge shall open on signal for all commercial vessels. On Saturday, Sunday, and Federal Holidays, the bridge shall open on signal once an hour, at twenty minutes after the hour, between 7:20 a.m. and 8:20 p.m., except that, the bridge shall open on signal for all commercial vessels. At all other times the bridge shall open on signal for all vessel traffic.
SUMMARY: New York,
We encourage you to participate in evaluating this test schedule by submitting comments or related material. If you do so, please include your name and address, identify the docket number for this deviation (CGD0106078), indicate the specific section of this document to which each comment applies, and give the reason for each comment. Please submit all comments and related material in an unbound format, no larger than 8\1/2\ by 11 inches, suitable for copying. If you would like to know if they reached us, please enclose a stamped, self addressed postcard or envelope. We will consider all comments and material received during the comment period. Comments must be received by November 3, 2006.
The Loop Parkway Bridge has a vertical clearance in the closed position of 21 feet at mean high water and 25 feet at mean low water. The existing drawbridge operation regulations are listed at 33 CFR 117.799(f).
The bridge owner, New York State Department of Transportation, requested a temporary deviation from the drawbridge operation regulations to test an alternate drawbridge operation schedule to help better balance the needs between vehicular land traffic and marine vessel traffic.
Under this temporary deviation, in effect from June 30, 2006 through September 4, 2006, the Loop Parkway Bridge at mile 0.7, across Long Creek, shall operate as follows:
The bridge shall open on signal for all marine traffic, Monday through Friday twice an hour, at twenty and fifty minutes after the hour, from 6:20 a.m. to 7:20 p.m., except that, between 9:50 a.m. and 3:20 p.m., the bridge shall open on signal for all commercial vessels. On Saturday, Sunday, and Federal Holidays, the bridge shall open on signal once an hour, at twenty minutes after the hour, between 7:20 a.m. and 8:20 p.m., except that, the bridge shall open on signal for all commercial vessels. At all other times the bridge shall open on signal for all vessel traffic.
This deviation from the operating regulations is authorized under 33 CFR 117.43.
Dated: June 26, 2006.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. E610758 Filed 71006; 8:45 am]
BILLING CODE 491015P
FOR FURTHER INFORMATION CONTACT Judy Leung-Yee, Project Officer, First Coast Guard District, at (212) 6687195.
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 50 CFR Part 679 47 CFR Part 73 26 CFR Part 1 40 CFR Part 180 33 CFR Part 117 50 CFR Part 17 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 40 CFR Part 63 33 CFR Part 100 50 CFR Part 622 50 CFR Part 660 26 CFR Part 301 44 CFR Part 65 39 CFR Part 111 40 CFR Part 300 6 CFR Part 5 40 CFR Part 271 47 CFR Part 64 40 CFR Parts 52 and 81 50 CFR Part 665 10 CFR Part 50 44 CFR Part 64 49 CFR Part 571 39 CFR Part 3020