DEPARTMENT OF HOMELAND SECURITY

Coast Guard

CFR Citation: 33 CFR Part 117

CGD ID: [CGD01-06-078]

NOTICE: RULES

ACTION: Drawbridge operations:

DOCUMENT ACTION: Notice of temporary deviation from regulations; request for comments.

SUBJECT CATEGORY: Drawbridge Operation Regulations; Long Island, New York Inland Waterway From East Rockaway Inlet to Shinnecock Canal, Jones Beach, NY

DATES: This deviation is effective from June 30, 2006 through September 4, 2006. Comments must reach the Coast Guard on or before November 3, 2006.

DOCUMENT SUMMARY: The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Loop Parkway Bridge, across Long Creek at mile 0.7, at Jones Beach, New York. This deviation will test a change to the drawbridge operation schedule to determine whether a permanent change to the schedule is needed. This deviation will allow the bridge to open on signal for all marine traffic, Monday through Friday twice an hour at twenty and fifty minutes after the hour, from 6:20 a.m. to 7:20 p.m., except that, between 9:50 a.m. and 3:20 p.m., the bridge shall open on signal for all commercial vessels. On Saturday, Sunday, and Federal Holidays, the bridge shall open on signal once an hour, at twenty minutes after the hour, between 7:20 a.m. and 8:20 p.m., except that, the bridge shall open on signal for all commercial vessels. At all other times the bridge shall open on signal for all vessel traffic.

SUMMARY: New York,


SUPPLEMENTAL INFORMATION

Request for Comments

We encourage you to participate in evaluating this test schedule by submitting comments or related material. If you do so, please include your name and address, identify the docket number for this deviation (CGD0106078), indicate the specific section of this document to which each comment applies, and give the reason for each comment. Please submit all comments and related material in an unbound format, no larger than 8\1/2\ by 11 inches, suitable for copying. If you would like to know if they reached us, please enclose a stamped, self addressed postcard or envelope. We will consider all comments and material received during the comment period. Comments must be received by November 3, 2006.

Background and Purpose

The Loop Parkway Bridge has a vertical clearance in the closed position of 21 feet at mean high water and 25 feet at mean low water. The existing drawbridge operation regulations are listed at 33 CFR 117.799(f).

The bridge owner, New York State Department of Transportation, requested a temporary deviation from the drawbridge operation regulations to test an alternate drawbridge operation schedule to help better balance the needs between vehicular land traffic and marine vessel traffic.

Under this temporary deviation, in effect from June 30, 2006 through September 4, 2006, the Loop Parkway Bridge at mile 0.7, across Long Creek, shall operate as follows:

The bridge shall open on signal for all marine traffic, Monday through Friday twice an hour, at twenty and fifty minutes after the hour, from 6:20 a.m. to 7:20 p.m., except that, between 9:50 a.m. and 3:20 p.m., the bridge shall open on signal for all commercial vessels. On Saturday, Sunday, and Federal Holidays, the bridge shall open on signal once an hour, at twenty minutes after the hour, between 7:20 a.m. and 8:20 p.m., except that, the bridge shall open on signal for all commercial vessels. At all other times the bridge shall open on signal for all vessel traffic.

This deviation from the operating regulations is authorized under 33 CFR 117.43.

Dated: June 26, 2006.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. E610758 Filed 71006; 8:45 am]
BILLING CODE 491015P

FOR FURTHER INFORMATION CONTACT Judy Leung-Yee, Project Officer, First Coast Guard District, at (212) 6687195.