ENVIRONMENTAL PROTECTION AGENCY

Environmental Protection Agency

CFR Citation: 40 CFR Part 52

DE ID: [DE102-1100; FRL-8291-7]

NOTICE: RULES

ACTION: Air quality implementation plans; approval and promulgation; various States:

DOCUMENT ACTION: Final rule; notice of administrative change.

SUBJECT CATEGORY: Approval and Promulgation of Air Quality Implementation Plans; Delaware; Update to Materials Incorporated by Reference

EFFECTIVE DATES: This action is effective April 3, 2007.

DOCUMENT SUMMARY: EPA is updating the materials submitted by Delaware that are incorporated by reference (IBR) into the State implementation plan (SIP). The regulations affected by this update have been previously submitted by the Delaware Department of Natural Resources and Environmental Control (DNREC) and approved by EPA. This update affects the SIP materials that are available for public inspection at the National Archives and Records Administration (NARA), the Air and Radiation Docket and Information Center located at EPA Headquarters in Washington, D.C., and the Regional Office.

SUMMARY: Delaware,


SUPPLEMENTAL INFORMATION

The SIP is a living document which the State revises as necessary to address the unique air pollution problems. Therefore, EPA from time to time must take action on SIP revisions containing new and/or revised regulations to make them part of the SIP. On May 22, 1997 (62 FR 27968), EPA revised the procedures for incorporating by reference Federallyapproved SIPs, as a result of consultations between EPA and the Office of the Federal Register (OFR). The description of the revised SIP document, IBR procedures and ``Identification of plan'' format are discussed in further detail in the May 22, 1997 Federal Register document. On December 7, 1998 (63 FR 67407), EPA published a document in the Federal Register beginning the new IBR procedure for Delaware. On June 21, 2004 (69 FR 34285), EPA published an update to the IBR material for Delaware. In this document, EPA is doing the following:

1. Announcing the update to the IBR material as of February 15, 2007.

2. Making corrections to the following entries listed in the paragraph 52.420(c) chart, as described below:

a. Revising the title of Regulation 1102 (formerly Regulation 2) so that it restores the text of the revised title as published in the December 7, 2006 Federal Register (71 FR 70883 at 70885).

b. Adding an entry for Regulation 1102, Appendix A with a State effective date of June 1, 1997. EPA had approved the addition of this appendix as a SIP revision on January 13, 2000 (65 FR 2005), but had inadvertently omitted a corresponding entry as an addition to 40 CFR 52.420(c) at the time of EPA's approval action.

c. For the entries Regulation 1102, Sections 1, 6, 11, and 12, adding text in the ``Additional explanation'' column to indicate the SIP effective date.

d. For the entry Regulation 24, Section 10, removing the text from the ``Additional explanation'' column.

e. For the entry Regulation 31, Appendix 6(a)(9), correcting a typographical error in the ``Title/subject'' column.

3. Making corrections to the following entries listed in the paragraph 52.420(d) chart, as described below:

a. Renaming the title of the second column from ``Title/subject'' to ``Permit number.''

b. Entry for Phoenix Steel Co.Electric Arc Furnaces Charging & Tapping 2Correcting a typographical error in the ``Permit number'' column.

EPA has determined that today's rule falls under the ``good cause'' exemption in section 553(b)(3)(B) of the Administrative Procedures Act (APA), which, upon finding ``good cause,'' authorizes agencies to dispense with public participation, and section 553(d)(3), which allows an agency to make a rule effective immediately (thereby avoiding the 30day delayed effective date otherwise provided for in the APA). Today's rule simply codifies provisions which are already in effect as a matter of law in Federal and approved State programs. Under section 553 of the APA, an agency may find good cause where procedures are ``impractical, unnecessary, or contrary to the public interest.'' Public comment is ``unnecessary'' and contrary to the ``public interest'' since the codification only reflects existing law. Immediate notice in the CFR benefits the public by removing outdated citations and incorrect chart entries.
Statutory and Executive Order Reviews

A. General Requirements

Under Executive Order 12866 (58 FR 51735, October 4, 1993), this action is not a ``significant regulatory action'' and therefore is not subject to review by the Office of Management and Budget. For this reason, this action is also not subject to Executive Order 13211, ``Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use'' (66 FR 28355, May 22, 2001). This action merely approves state law as meeting Federal requirements and imposes no additional requirements beyond those imposed by state law. Accordingly, the Administrator certifies that this rule will not have a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.). Because this rule approves preexisting requirements under state law and does not impose any additional enforceable duty beyond that required by State law, it does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 1044). This rule also does not have tribal implications because it will not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes, as specified by Executive Order 13175 (65 FR 67249, November 9, 2000). This action also does not have Federalism implications because it does not have substantial direct effects on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various
[[Page 15840]]
levels of government, as specified in Executive Order 13132 (64 FR 43255, August 10, 1999). This action merely approves a state rule implementing a Federal standard, and does not alter the relationship or the distribution of power and responsibilities established in the Clean Air Act. This rule also is not subject to Executive Order 13045 ``Protection of Children from Environmental Health Risks and Safety Risks'' (62 FR 19885, April 23, 1997), because it approves a state rule implementing a Federal standard. In reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the Clean Air Act. In this context, in the absence of a prior existing requirement for the State to use voluntary consensus standards (VCS), EPA has no authority to disapprove a SIP submission for failure to use VCS. It would thus be inconsistent with applicable law for EPA, when it reviews a SIP submission, to use VCS in place of a SIP submission that otherwise satisfies the provisions of the Clean Air Act. Thus, the requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) do not apply. This rule does not impose an information collection burden under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).

B. Submission to Congress and the Comptroller General

The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this rule and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. This rule is not a ``major rule'' as defined by 5 U.S.C. 804(2).

C. Petitions for Judicial Review

EPA has also determined that the provisions of section 307(b)(1) of the Clean Air Act pertaining to petitions for judicial review are not applicable to this action. Prior EPA rulemaking actions for each individual component of the Delaware SIP compilations had previously afforded interested parties the opportunity to file a petition for judicial review in the United States Court of Appeals for the appropriate circuit within 60 days of such rulemaking action. Thus, EPA sees no need in this action to reopen the 60day period for filing such petitions for judicial review for this ``Identification of plan'' reorganization update action for Delaware.

List of Subjects in 40 CFR Part 52

Environmental protection, Air pollution control, Carbon monoxide, Incorporation by reference, Intergovernmental relations, Lead, Nitrogen dioxide, Ozone, Particulate matter, Reporting and record keeping requirements, Sulfur oxides, Volatile organic compounds.

Dated: March 9, 2007.
William T. Wisniewski,
Acting Regional Administrator, Region III.
40 CFR part 52 is amended as follows:
PART 52[AMENDED]
1. The authority for citation for part 52 continues to read as follows:

Authority: 42.U.S.C. 7401 et seq.
Subpart IDelaware
2. Section 52.420 is amended by revising paragraphs (b), (c), and (d) to read as follows:
52.420 Identification of plan.
* * * * *
(b) Incorporation by reference.
(1) Material listed as incorporated by reference in paragraphs (c) and (d) was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates on or after February 15, 2007 will be incorporated by reference in the next update to the SIP compilation.
(2) EPA Region III certifies that the rules/regulations provided by EPA at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State implementation plan as of February 15, 2007.
(3) Copies of the materials incorporated by reference may be inspected at the EPA Region III Office at 1650 Arch Street, Philadelphia, PA 19103; the EPA, Air and Radiation Docket and Information Center, Room Number 3334, EPA West Building, 1301 Constitution Avenue, NW., Washington, DC 20460; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 2027416030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html .
(c) EPA approved regulations.
EPAApproved Regulations in the Delaware SIP State State citation Title/subject effective EPA approval date Additional explanation date Regulation 1 Definitions and Administrative Principles Section 1............... General Provisions..... 5/28/74 03/23/76, 41 FR 12010.. Section 2............... Definitions............ 10/11/98 3/11/99, 64 FR 12085... Section 2............... Definitions............ 2/8/95 9/9/99, 64 FR 48961.... New Definitions: (Effective date: 1/7/ 77). Capacity factor. Continuous monitoring system. Emission standard. Equipment shutdown. Excess Emissions. (Effective Date: 9/26/ 78). Sulfuric Acid Plant. [[Page 15841]]
Revised Definitions: (Effective date: 1/7/ 77). Existing Installation, Equipment, Source, or Operation. New Installation, Equipment, Source, or Operation. Section 2............... Definitions............ 2/11/03 11/1/05, 70 FR 65847... Added definition of PM2.5 Section 3............... Administrative 1/7/72 05/31/72, 37 FR 10842.. Principles.
Section 4............... Abbreviations.......... 2/1/81 3/15/82, 48 FR 11013... Abbreviation of ``ACAA'' only. Regulation 1102 Permits (Formerly ``Regulation 2Permits'') Section 1............... General Provisions..... 6/15/06 12/7/06, 71 FR 70883... SIP effective date is 2/ 5/07. Section 2............... Applicability.......... 6/1/97 1/13/00, 65 FR 2048.... Section 3............... Applications Prepared 6/1/97 1/13/00, 65 FR 2048.... by Interested Parties.
Section 4............... Cancellation of 6/1/97 1/13/00, 65 FR 2048.... Construction Permits.
Section 5............... Action on Applications. 6/1/97 1/13/00, 65 FR 2048.... Section 6............... Denial, Suspension or 6/15/06 12/7/06, 71 FR 70883... SIP effective date is 2/ Revocation of 5/07. Operating Permits.
Section 7............... Transfer of Permit/ 6/1/97 1/13/00, 65 FR 2048.... Registration
Prohibited.
Section 8............... Availability of Permit/ 6/1/97 1/13/00, 65 FR 2048.... Registration.
Section 9............... Registration Submittal. 6/1/97 1/13/00, 65 FR 2048.... Section 10.............. Source Category Permit 6/1/97 1/13/00, 65 FR 2048.... Application.
Section 11.............. Permit Application..... 6/15/06 12/7/06, 71 FR 70883... SIP effective date is 2/ 5/07. Section 12.............. Public Participation... 6/15/06 12/7/06, 71 FR 70883... SIP effective date is 2/ 5/07. Section 13.............. Department Records..... 6/1/97 1/13/00, 65 FR 2048.... Appendix A.............. [List of Permit 6/1/97 1/13/00, 65 FR 2048.... Exemptions].
Regulation 3 Ambient Air Quality Standards Section 1............... General Provisions..... 2/11/03 11/1/05, 70 FR 65847.. Addition of section 1.6.j. Section 2............... General Restrictions... 3/11/80 10/30/81, 46 FR 53663.. Section 3............... Suspended Particulates. 3/11/80 10/30/81, 46 FR 53663.. Section 4............... Sulfur Dioxide......... 3/11/80 10/30/81, 46 FR 53663.. Section 5............... Carbon Monoxide........ 3/11/80 10/30/81, 46 FR 53663.. Section 6............... Ozone.................. 2/11/03 11/1/05, 70 FR 65847... Addition to section 6.1``This standard shall be applicable to New Castle and Kent Counties.''; Addition of section 6.2. Section 8............... Nitrogen Dioxide....... 3/11/80 10/30/81, 46 FR 53663.. Section 10.............. Lead................... 3/11/80 3/11/82, 48 FR 10535... Section 11.............. PM10 and PM2.5 2/11/03 11/1/05, 70 FR 65847... Section title added Particulates. ``and PM2.5''; Addition of sections 11.2.a. and 11.2.b. Regulation 4 Particulate Emissions From Fuel Burning Equipment Section 1............... General Provisions..... 5/28/74 3/23/76, 41 FR 12010... Section 2............... Emission Limits........ 5/28/74 3/23/76, 41 FR 12010... Regulation 5 Particulate Emissions From Industrial Process Operations Section 1............... General Provisions..... 5/28/74 3/23/76, 41 FR 12010... Section 2............... General Restrictions... 5/28/74 3/23/76, 41 FR 12010... Section 3............... Restrictions on Hot Mix 5/28/74 3/23/76, 41 FR 12010... Asphalt Batching
Operations.
Section 4............... Restrictions on 12/2/77 07/30/79, 44 FR 44497.. Secondary Metal
Operations.
Section 5............... Restrictions on 9/26/78 9/9/99, 64 FR 48961.... Petroleum Refining
Operations.
Section 6............... Restrictions on Prill 9/26/78 08/01/80, 45 FR 51198.. Tower Operations.
Section 7............... Control of Potentially 1/7/72 5/31/72, 37 FR 10842... Hazardous Particulate
Matter.
Regulation 6 Particulate Emissions From Construction and Materials Handling Section 1............... General Provisions..... 1/7/72 05/31/72, 37 FR 10842.. Section 2............... Demolition............. 5/28/74 03/23/76, 41 FR 12010.. [[Page 15842]]
Section 3............... Grading, Land Clearing, 5/28/74 03/23/76, 41 FR 12010.. Excavation and Use of
NonPaved Roads.
Section 4............... Material Movement...... 5/28/74 03/23/76, 41 FR 12010.. Section 5............... Sandblasting........... 5/28/74 03/23/76, 41 FR 12010.. Section 6............... Material Storage....... 5/28/74 03/23/76, 41 FR 12010.. Regulation 7 Particulate Emissions From Incineration Section 1............... General Provisions..... 05/28/74 03/23/76, 41 FR 12010.. Section 2............... Restrictions........... 12/8/83 10/3/84 49, FR 39061... Provisions were revised 10/13/89 by State, but not submitted to EPA as SIP revisions. Regulation 8 Sulfur Dioxide Emissions From Fuel Burning Equipment Section 1............... General Provisions..... 12/8/83 10/3/84, 49 FR 39061... Section 2............... Limit on Sulfur Content 5/9/85 12/08/86, 51 FR 44068.. of Fuel.
Section 3............... Emissions Control in 5/9/85 12/08/86, 51 FR 44068.. Lieu of Sulfur Content
Limits of Section 2.
Regulation 9 Emissions of Sulfur Compounds From Industrial Operations Section 1............... General Provisions..... 5/9/85 12/08/86, 51 FR 44068.. Section 2............... Restrictions on 9/26/78 9/9/99, 64 FR 48961.... 1. On 3/11/1982 (47 FR Sulfuric Acid 10535), EPA approved Manufacturing revisions to Section 2 Operations. with a State effective date of 12/29/1980. 2. Section 2.2 (State effective date: 9/26/ 1980) is federally enforceable as a Section 111(d) plan and codified at 40 CFR 62.1875. Section 3............... Restriction on Sulfur 5/28/74 03/23/76, 41 FR 12010.. Recovery Operations.
Section 4............... Stack Height 4/18/83 09/21/83, 48 FR 42979.. Requirements.
Regulation 10 Control of Sulfur Dioxide EmissionsKent and Sussex Counties Section 1............... Requirements for 1/7/72 05/31/72, 37 FR 10842.. Existing Sources of
Sulfur Dioxide.
Section 2............... Requirements for New 5/28/74 03/23/76, 41 FR 12010.. Sources of Sulfur
Dioxide.
Regulation 11 Carbon Monoxide Emissions From Industrial Process OperationsNew Castle County Section 1............... General Provisions..... 5/28/74 03/23/76, 41 FR 12010.. Section 2............... Restrictions on 1/7/72 05/31/72, 37 FR 10842.. Citation revised 3/23/ Petroleum Refining 76 41 FR 12010. Operations.
Regulation 12 Control of Nitrogen Oxide Emissions Section 1............... Applicability.......... 11/24/93 6/14/01, 66 FR 32234... Section 2............... Definitions............ 11/24/93 6/14/01, 66 FR 32234... Section 3............... Standards.............. 11/24/93 6/14/01, 66 FR 32234... Section 4............... Exemptions............. 11/24/93 6/14/01, 66 FR 32234... Section 5............... Alternative and 11/24/93 6/14/01, 66 FR 32234... Equivalent RACT
Determination.
Section 6............... RACT Proposals......... 11/24/93 6/14/01, 66 FR 32234... Section 7............... Compliance, 11/24/93 6/14/01, 66 FR 32234... Certification,
Recordkeeping, and
Reporting Requirements.
Regulation 13 Open Burning Section 1............... ProhibitionsAll 2/8/95 03/12/97, 62 FR 11329.. EPA effective date is 5/ Counties. 1/98. Section 2............... ProhibitionsSpecific 2/8/95 03/12/97, 62 FR 11329.. EPA effective date is 5/ Counties. 1/98. Section 3............... General Restrictions 2/8/95 03/12/97, 62 FR 11329.. EPA effective date is 5/ All Counties. 1/98. Section 4............... ExemptionsAll 2/8/95 03/12/97, 62 FR 11329.. EPA effective date is 5/ Counties. 1/98. Regulation 14 Visible Emissions Section 1............... General Provisions..... 7/17/84 07/02/85, 50 FR 27244.. Section 2............... Requirements........... 7/17/84 07/02/85, 50 FR 27244.. [[Page 15843]]
Section 3............... Alternate Opacity 7/17/84 07/02/85, 50 FR 27244.. Requirements.
Section 4............... Compliance with Opacity 7/17/84 07/02/85, 50 FR 27244.. Standards.
Regulation 15 Air Pollution Alert and Emergency Plan Section 1............... General Provisions..... 1/7/72 05/31/72, 37 FR 10842.. Section 2............... Stages and Criteria.... 3/29/88 04/06/94, 59 FR 16140.. Section 3............... Required Actions....... 1/7/72 05/31/72, 37 FR 10842.. Delaware removed the word ``standby'' from Table III, section 3B effective 5/28/74, but did not submit as a SIP revision. Section 4............... Standby Plans.......... 1/7/72 05/31/72, 37 FR 10842.. Regulation 16 Sources Having an Interstate Air Pollution Potential Section 1............... General Provisions..... 1/7/72 05/31/72, 37 FR 10842.. Delaware revised provision effective 5/ 28/74, but did not submit as a SIP revision. Section 2............... Limitations............ 1/7/72 05/31/72, 37 FR 10842.. Section 3............... Requirements........... 1/7/72 05/31/72, 37 FR 10842.. Regulation 17 Source Monitoring, Recordkeeping and Reporting Section 1............... Definitions and 1/11/93 02/28/96, 61 FR 7453... Administrative
Principles.
Section 2............... Sampling and Monitoring 7/17/84, 07/02/85, 50 FR 27244.. Former SIP Sections 1 through 5 respectively; citation revised 2/28/96, 62 FR 7453. Section 3............... Minimum Emission 1/10/77 8/25/81, 46 FR 43150... Monitoring
Requirements for
Existing Sources.
Section 4............... Performance 1/11/93 9/9/99, 64 FR 48961.... Specifications.
Section 5............... Minimum Data 1/10/77 8/25/81, 46 FR 43150... Requirements.
Section 6............... Data Reduction......... 1/11/93 9/9/99, 64 FR 48961.... Section 7............... Emission Statement..... 1/11/93 02/28/96, 61 FR 7453... Regulation 23 Standards of Performance for Steel Plants: Electric Arc Furnaces Section 1............... Applicability.......... 12/2/77 07/30/79, 44 FR 44497.. Correction published 8/ 20/80, 45 FR 55422. Section 2............... Definitions............ 04/18/83 09/21/83, 49 FR 39061.. Section 3............... Standard for 04/18/83 09/21/83, 49 FR 39061.. Particulate Matter.
Section 4............... Monitoring of 12/2/77 07/30/79, 44 FR 44497.. Correction published 8/ Operations. 20/80, 45 FR 55422. Section 5............... Test Methods and 12/2/77 07/30/79, 44 FR 44497.. Correction published 8/ Procedures. 20/80, 45 FR 55422. Regulation 24 Control of Volatile Organic Compound Emissions Section 1............... General Provisions..... 1/11/93 5/3/95, 60 FR 21707.... Section 2............... Definitions............ 1/11/02 11/14/03, 68 FR 64540.. Section 3............... Applicability.......... 1/11/93 5/3/95, 60 FR 21707.... Section 4............... Compliance 1/29/94 01/26/96, 61 FR 2419... Certification,
Recordkeeping, and
Reporting Requirements
for Coating Sources.
Section 5............... Compliance 1/11/93 5/3/95, 60 FR 21707.... Certification,
Recordkeeping, and
Reporting Requirements
for NonCoating
Sources.
Section 7............... Circumvention.......... 1/11/93 5/3/95, 60 FR 21707.... Section 8............... Handling, Storage, and 11/29/94 01/26/96, 61 FR 2419... Disposal of Volatile
Organic Compounds
(VOCs).
Section 9............... Compliance, Permits, 1/11/93 5/3/95, 60 FR 21707.... Enforceability.
Section 10.............. Aerospace Coatings..... 2/11/03 3/24/04, 69 FR 13737... Section 11.............. Mobile Equipment Repair 11/11/01 11/22/02, 67 FR 70315.. and Refinishing.
Section 12.............. Surface Coating of 11/29/94 01/26/96, 61 FR 2419... Plastic Parts.
Section 13.............. Automobile and Light 1/11/93 5/3/95, 60 FR 21707.... Duty Truck Coating
Operations.
Section 14.............. Can Coating............ 1/11/93 5/3/95, 60 FR 21707.... Section 15.............. Coil Coating........... 1/11/93 5/3/95, 60 FR 21707.... Section 16.............. Paper Coating.......... 1/11/93 5/3/95, 60 FR 21707.... Section 17.............. Fabric Coating......... 1/11/93 5/3/95, 60 FR 21707.... [[Page 15844]]
Section 18.............. Vinyl Coating.......... 1/11/93 5/3/95, 60 FR 21707.... Section 19.............. Coating of Metal 1/11/93 5/3/95, 60 FR 21707.... Furniture.
Section 20.............. Coating of Large 1/11/93 5/3/95, 60 FR 21707.... Appliances.
Section 21.............. Coating of Magnet Wire. 11/29/94 01/26/96, 61 FR 2419... Section 22.............. Coating of 1/11/93 5/3/95, 60 FR 21707.... Miscellaneous Metal
Parts.
Section 23.............. Coating of Flat Wood 1/11/93 5/3/95, 60 FR 21707.... Panelling.
Section 24.............. Bulk Gasoline Plants... 1/11/93 5/3/95, 60 FR 21707.... Section 25.............. Bulk Gasoline Terminals 11/29/94 01/26/96, 61 FR 2419... Section 26.............. Gasoline Dispensing 1/11/02 11/14/03 68 FR 64540... FacilityStage I
Vapor Recovery.
Section 27.............. Gasoline Tank Trucks... 1/11/93 5/3/95, 60 FR 21707.... Section 28.............. Petroleum Refinery 1/11/93 5/3/95, 60 FR 21707.... Sources.
Section 29.............. Leaks from Petroleum 11/29/94 01/26/96, 61 FR 2419... Refinery Equipment.
Section 30.............. Petroleum Liquid 11/29/94 01/26/96, 61 FR 2419... Storage in External
Floating Roof Tanks.
Section 31.............. Petroleum Liquid 11/29/94 01/26/96, 61 FR 2419... Storage in Fixed Roof
Tanks.
Section 32.............. Leaks from Natural Gas/ 11/29/94 01/26/96, 61 FR 2419... Gasoline Processing
Equipment.
Section 33.............. Solvent Metal Cleaning 11/11/01 11/22/02 67 FR 70315... and Drying.
Section 34.............. Cutback and Emulsified 1/11/93 5/3/95, 60 FR 21707.... Asphalt.
Section 35.............. Manufacture of 11/29/94 01/26/96, 61 FR 2419... Synthesized
Pharmaceutical
Products.
Section 36.............. Stage II Vapor Recovery 1/11/93 6/10/94, 59 FR 29956... Section 37.............. Graphic Arts Systems... 11/29/94 01/26/96, 61 FR 2419... Section 38.............. Petroleum Solvent Dry 1/11/93 5/3/95, 60 FR 21707.... Cleaners.
Section 39.............. Perchloroethylene Dry 1/11/93 5/3/95, 60 FR 21707.... Cleaning.
Section 40.............. Leaks from Synthetic 1/11/93 5/3/95, 60 FR 21707.... Organic Chemical,
Polymer, and Resin
Manufacturing
Equipment.
Section 41.............. Manufacture of High 1/11/93 5/3/95, 60 FR 21707.... Density Polyethylene,
Polypropylene and
Polystyrene Resins.
Section 42.............. Air Oxidation Processes 1/11/93 5/3/95, 60 FR 21707.... in the Synthetic
Organic Chemical
Manufacturing Industry.
Section 43.............. Bulk Gasoline Marine 11/29/94 01/26/96, 61 FR 2419... Tank Vessel Loading
Facilities.
Section 44.............. Batch Processing 11/29/94 01/26/96, 61 FR 2419... Operations.
Section 45.............. Industrial Cleaning 11/29/94 01/26/96, 61 FR 2419... Solvents.
Section 47.............. Offset Lithographic 11/29/94 05/14/97, 62 FR 26399.. Printing.
Section 48.............. Reactor Processes and 11/29/94 01/26/96, 61 FR 2419... Distillation
Operations in the
Synthetic Organic
Chemical Manufacturing
Industry.
Section 49.............. Control of Volatile 11/29/94 01/26/96, 61 FR 2419... Organic Compound
Emissions from
Volatile Organic
Liquid Storage Vessels.
Section 50.............. Other Facilities that 11/29/94 03/12/97, 62 FR 11329.. EPA effective date for Emit Volatile Organic Sections 50(a)(5) and Compounds (VOCs). 50(b)(3) is 5/1/98. Appendix ``A''.......... Test Methods and 11/29/94 01/26/96, 61 FR 2419... Compliance Procedures:
General Provisions.
Appendix ``B''.......... Test Methods and 1/11/93 5/3/95, 60 FR 21707.... Compliance Procedures:
Determining the
Volatile Organic
Compound (VOC) Content
of Coatings and Inks.
Appendix ``C''.......... Test Methods and 1/11/93 5/3/95, 60 FR 21707.... Compliance Procedures:
Alternative Compliance
Methods for Surface
Coating.
Appendix ``D''.......... Test Methods and 11/29/94 01/26/96, 61 FR 2419... Compliance Procedures:
Emission Capture and
Destruction or Removal
Efficiency and
Monitoring
Requirements.
Appendix ``E''.......... Test Methods and 1/11/93 5/3/95, 60 FR 21707.... Compliance Procedures:
Determining the
Destruction or Removal
Efficiency of a
Control Device.
[[Page 15845]]
Appendix ``F''.......... Test Methods and 1/11/93 5/3/95, 60 FR 21707.... Compliance Procedures:
Leak Detection Methods
for Volatile Organic
Compounds (VOCs).
Appendix ``G''.......... Performance 1/11/93 5/3/95, 60 FR 21707.... Specifications for
Continuous Emissions
Monitoring of Total
Hydrocarbons.
Appendix ``H''.......... Quality Control 1/11/93 5/3/95, 60 FR 21707.... Procedures for
Continuous Emission
Monitoring Systems
(CEMS).
Appendix ``I''.......... Method to Determine 11/29/94 01/26/96, 61 FR 2419... Length of Rolling
Period for Liquid
Liquid Material
Balance Method.
Appendix ``J''.......... Procedures for 1/11/93 6/10/94, 59 FR 29956... Implementation of
Regulations Covering
Stage II Vapor
Recovery Systems for
Gasoline Dispensing
Facilities.
Appendix ``J1''......... Certified Stage II 1/11/93 6/10/94, 59 FR 29956... Vapor Recovery Systems.
Appendix ``J2''......... Pressure Decay/Leak 1/11/93 6/10/94, 59 FR 29956... Test Procedure for
Verification of Proper
Functioning of Stage I
& Stage II Vapor
Recovery Equipment.
Appendix ``J3''......... Dynamic Backpressure 01/11/93 6/10/94, 59 FR 29956... (Dry) Test and Liquid
Blockage (Wet) Test
Procedure for
Verification of Proper
Functioning of Stage
II Vapor Balance
Recovery Systems.
Appendix ``K''.......... Emission Estimation 11/29/94 01/26/96, 61 FR 2419... Methodologies.
Appendix ``L''.......... Method to Determine 11/29/94 01/26/96, 61 FR 2419... Total Organic Carbon
for Offset
Lithographic Solutions.
Appendix ``M''.......... Test Method for 11/29/94 01/26/96, 61 FR 2419... Determining the
Performance of
Alternative Cleaning
Fluids.
Regulation 25 Requirements for Preconstruction Review Section 1............... General Provisions..... 1/1/93 2/7/01, 66 FR 9211..... Excluding Sec. Sec. (As Revised 1.2, 1.6, 1.9(L), 5/1/99) 1.9(M), 1.9(N), 1.9(O), which relate to Prevention of Significant Deterioration. Section 2............... Emission Offset 1/1/93 2/7/01, 66 FR 9211..... Provisions (EOP). (As Revised 5/1/99) Section 3............... Prevention of 5/15/90 01/27/93, 58 FR 26689.. Significant
Deterioration of Air
Quality.
Regulation 26 Motor Vehicle Emissions Inspection Program Section 1............... Applicability and 2/12/01 11/27/03, 68 FR 66343.. Regulation 26 Definitions. provisions apply to Sussex County only, effective November 1, 1999. Section 2............... General Provisions..... 2/12/01 11/27/03, 68 FR 66343.. Section 3............... Registration 5/9/85 12/08/86, 51 FR 44068.. Requirement.
Section 4............... Exemptions............. 2/12/01 11/27/03, 68 FR 66343.. Section 5............... Enforcement............ 7/6/82 10/17/83, 48 FR 46986.. Section 6............... Compliance, Waivers, 2/12/01 11/27/03, 68 FR 66343.. Extensions of Time.
Section 7............... Inspection Facility 7/6/82 10/17/83, 48 FR 46986.. Requirements.
Section 8............... Certification of Motor 7/6/82 10/17/83, 48 FR 46986.. Vehicle Officers.
Section 9............... Calibration and Test 2/12/01 11/27/03, 68 FR 66343.. Procedures and
Approved Equipment.
Technical Memorandum 1.. Delaware Division of 2/12/01 11/27/03, 68 FR 66343.. Motor Vehicles Vehicle
Exhaust Emissions Test.
[[Page 15846]]
Regulation 27 Stack Heights Section 1............... General Provisions..... 4/18/83 09/21/83, 48 FR 42979.. Section 2............... Definitions Specific to 12/7/88 06/29/90, 55 FR 26689.. this Regulation.
Section 3............... Requirements for 2/18/87 06/29/90, 55 FR 26689.. Existing and New
Sources.
Section 4............... Public Notification.... 2/18/87 06/29/90, 55 FR 26689.. Regulation 31 Low Enhanced Inspection and Maintenance Program Section 1............... Applicability.......... 10/11/01 11/27/03, 68 FR 66343.. Section 2............... Low Enhanced I/M 10/11/01 1/27/03, 68 FR 66343... Performance Standard.
Section 3............... Network Type and 10/11/01 11/27/03, 68 FR 66343.. Program Evaluation.
Section 4............... Test Frequency and 6/11/99 9/30/99, 64 FR 52657... Convenience.
Section 5............... Vehicle Coverage....... 10/11/01 11/27/03, 68 FR 66343.. Section 6............... Test Procedures and 10/11/01 11/27/03, 68 FR 66343.. Standards.
Section 7............... Waivers and Compliance 10/11/01 11/27/03, 68 FR 66343.. via Diagnostic
Inspection.
Section 8............... Motorist Compliance 10/11/01 11/27/03, 68 FR 66343.. Enforcement.
Section 9............... Enforcement Against 10/11/01 11/27/03, 68 FR 66343.. Operators and Motor
Vehicle Technicians.
Section 10.............. Improving Repair 8/13/98 9/30/99, 64 FR 52657... Effectiveness.
Section 11.............. Compliance with Recall 8/13/98 9/30/99, 64 FR 52657... Notices.
Section 12.............. OnRoad Testing........ 8/13/98 9/30/99, 64 FR 52657... Section 13.............. Implementation 10/11/01 11/27/03, 68 FR 66343.. Deadlines.
Appendix 1(d)........... Commitment to Extend 8/13/98 9/30/99, 64 FR 52657... the I/M Program to the
Attainment Date From
Secretary Tulou to EPA
Administrator W.
Michael McCabe.
Appendix 3(a)(7)........ Exhaust Emission Limits 8/13/98 9/30/99, 64 FR 52657... According to Model
Year.
Appendix 3(c)(2)........ VMASTM Test Procedure.. 6/11/99 9/30/99, 64 FR 52657... Appendix 4(a)........... Sections from Delaware 8/13/98 9/30/99, 64 FR 52657... Criminal and Traffic
Law Manual.
Appendix 5(a)........... Division of Motor 8/13/98 9/30/99, 64 FR 52657... Vehicles Policy on Out
of State Renewals.
Appendix 5(f)........... New Model Year Clean 10/11/01 11/27/03, 68 FR 66343.. Screen.
Appendix 6(a)........... Idle Test Procedure.... 10/11/01 11/27/03, 68 FR 66343.. Appendix 6(a)(5)........ Vehicle Emission Repair 8/13/98 9/30/99, 64 FR 52657... Report Form.
Appendix 6(a)(8)........ Evaporative System 10/11/01 11/27/03, 68 FR 66343.. Integrity (Pressure)
Test.
Appendix 6(a)(9)........ Onboard Diagnostic 10/11/01 11/27/03, 68 FR 66343.. Test Procedure OBD II
Test Procedure.
Appendix 7(a)........... Emission Repair 8/13/98 9/30/99, 64 FR 52657... Technician
Certification Process.
Appendix 8(a)........... Registration Denial 8/13/98 9/30/99, 64 FR 52657... System Requirements
Definition.
Appendix 9(a)........... Enforcement Against 10/11/01 11/27/03, 68 FR 66343.. Operators and
Inspectors.
Regulation 35 Conformity of General Federal Actions to the State Implementation Plans Section 1............... Purpose................ 8/14/96 7/15/97, 62 FR 37722... Section 2............... Definitions............ 8/14/96 07/15/97, 62 FR 37722.. Section 3............... Applicability.......... 8/14/96 07/15/97, 62 FR 37722.. Section 4............... Conformity Analysis.... 8/14/96 07/15/97, 62 FR 37722.. Section 5............... Reporting Requirements. 8/14/96 07/15/97, 62 FR 37722.. Section 6............... Public Participation 8/14/96 07/15/97, 62 FR 37722.. and Consultation.
Section 7............... Frequency of Conformity 8/14/96 07/15/97, 62 FR 37722.. Determinations.
Section 8............... Criteria for 8/14/96 07/15/97, 62 FR 37722.. Determining Conformity
of General Federal
Actions.
Section 9............... Procedures for 8/14/96 07/15/97, 62 FR 37722.. Conformity
Determinations of
General Federal
Actions.
[[Page 15847]]
Section 10.............. Mitigation of Air 8/14/96 07/15/97, 62 FR 37722.. Quality Impacts.
Section 11.............. Savings Provision...... 8/14/96 07/15/97, 62 FR 37722.. Regulation 37 NOX Budget Program Section 1............... General Provisions..... 12/11/99 3/9/00, 65 FR 12481.... Section 2............... Applicability.......... 12/11/99 3/9/00, 65 FR 12481.... Section 3............... Definitions............ 12/11/99 3/9/00, 65 FR 12481.... Section 4............... Allowance Allocation... 12/11/99 3/9/00, 65 FR 12481.... Section 5............... Permits................ 12/11/99 3/9/00, 65 FR 12481.... Section 6............... Establishment of 12/11/99 3/9/00, 65 FR 12481.... Compliance Accounts.
Section 7............... Establishment of 12/11/99 3/9/00, 65 FR 12481.... General Accounts.
Section 8............... Opt In Provisions...... 12/11/99 3/9/00, 65 FR 12481.... Section 9............... New Budget Source 12/11/99 3/9/00, 65 FR 12481.... Provisions.
Section 10.............. NOX Allowance Tracking 12/11/99 3/9/00, 65 FR 12481.... System (NATS).
Section 11.............. Allowance Transfer..... 12/11/99 3/9/00, 65 FR 12481.... Section 12.............. Allowance Banking...... 12/11/99 3/9/00, 65 FR 12481.... Section 13.............. Emission Monitoring.... 12/11/99 3/9/00, 65 FR 12481.... Section 14.............. Recordkeeping.......... 12/11/99 3/9/00, 65 FR 12481.... Section 15.............. Emissions Reporting.... 12/11/99 3/9/00, 65 FR 12481.... Section 16.............. Endof Season 12/11/99 3/9/00, 65 FR 12481.... Reconciliation.
Section 17.............. Compliance 12/11/99 3/9/00, 65 FR 12481.... Certification.
Section 18.............. Failure to Meet 12/11/99 3/9/00, 65 FR 12481.... Compliance
Requirements.
Section 19.............. Program Audit.......... 12/11/99 3/9/00, 65 FR 12481.... Section 20.............. Program Fees........... 12/11/99 3/9/00, 65 FR 12481.... Appendix ``A''.......... NOX Budget Program..... 12/11/99 3/9/00, 65 FR 12481.... Regulation 39 Nitrogen Oxides (NOX) Budget Trading Program Section 1............... Purpose................ 12/11/00 5/17/01, 66 FR 27459... Section 2............... Emission Limitation.... 12/11/00 5/17/01, 66 FR 27459... Section 3............... Applicability.......... 12/11/00 5/17/01, 66 FR 27459... Section 4............... Definitions............ 12/11/00 5/17/01, 66 FR 27459... Section 5............... General Provisions..... 12/11/00 5/17/01, 66 FR 27459... Section 6............... NOX Authorized Account 12/11/00 5/17/01, 66 FR 27459... Representative for NOX
Budget Sources.
Section 7............... Permits................ 12/11/00 5/17/01, 66 FR 27459... Section 8............... Monitoring and 12/11/00 5/17/01, 66 FR 27459... Reporting.
Section 9............... NATS................... 12/11/00 5/17/01, 66 FR 27459... Section 10.............. NOX Allowance Transfers 12/11/00 5/17/01, 66 FR 27459... Section 11.............. Compliance 12/11/00 5/17/01, 66 FR 27459... Certification.
Section 12.............. EndofSeason 12/11/00 5/17/01, 66 FR 27459... Reconciliation.
Section 13.............. Failure to Meet 12/11/00 5/17/01, 66 FR 27459... Compliance
Requirements.
Section 14.............. Individual Unit OptIns 12/11/00 5/17/01, 66 FR 27459... Section 15.............. General Accounts....... 12/11/00 5/17/01, 66 FR 27459... Appendix A.............. Allowance Allocations 12/11/00 5/17/01, 66 FR 27459... to NOX Budget Units
Under Section
3(a)(1)(i) and
3(a)(1)(ii) of
Regulation No. 39.
Appendix B.............. Regulation No. 37 12/11/00 5/17/01, 66 FR 27459... Regulation No. 39
Program Transition.
Regulation 40 Delaware's National Low Emission Vehicle (NLEV) Regulation Section 1............... Applicability.......... 10/11/99 12/28/99, 64 FR 72564.. Issued on September 1, 1999 by Secretary's Order No. 99A0046. Section 2............... Definitions............ 10/11/99 12/28/99, 64 FR 72564.. Section 3............... Program Participation.. 10/11/99 12/28/99, 64 FR 72564.. Regulation 41 Limiting Emissions of Volatile Organic Compounds From Consumer and Commercial Products Section 1............... Architectural and 03/11/02 11/22/02, 67 FR 70315.. Industrial Maintenance
Coatings.
Section 2............... Commercial Products.... 01/11/02 11/22/02, 67 FR 70315.. Section 3............... Portable Fuel 11/11/01 11/22/02, 67 FR 70315.. Containers.
[[Page 15848]]
Regulation 42 Specific Emission Control Requirements Section 1............... Control of NOX 12/11/01 11/22/02, 67 FR 70315.. Emissions from
Industrial Boilers.
(d) EPA approved State sourcespecific requirements.
EPAApproved Delaware SourceSpecific Requirements State Name of source Permit No. effective EPA approval date Additional date explanation Getty Oil Co..................... 75A4.............. 8/5/75 3/7/79, 44 FR 12423. 52.420(c)(11). Phoenix Steel Co.Electric...... 77A8.............. 12/2/77 7/30/79............. 52.420(c)(12). Arc Furnaces Charging & Tapping .................... ........... 44 FR 25223......... 2.
Delmarva Power & LightIndian 89A7/APC 89/197... 2/15/89 1/22/90, 55 FR 2067. 52.420(c)(38). River.
SPI Polyols, Inc................. Secretary's Order 7/11/00 6/14/01, 66 FR 32231 Polyhydrate No. 2000A0033. Alcohol's Catalyst Regenerative ProcessApproved NOX RACT Determination. Citisteel........................ Secretary's Order 7/11/00 6/14/01, 66 FR 32231 Electric Arc No. 2000A0033. FurnaceApproved NOX RACT Determination. General Chemical Corp............ Secretary's Order 7/11/00 6/14/01, 66 FR 32231 (1) Sulfuric Acid No. 2000A0033. Process & Interstage Absorption System. (2) Metallic Nitrite ProcessApproved NOX RACT Determinations. * * * * *
[FR Doc. 071648 Filed 4207; 8:45 am]
BILLING CODE 656050P

FOR FURTHER INFORMATION CONTACT Harold A. Frankford, (215) 814-2108 or by email at frankford.harold@epa.gov.