Federal Register: November 1, 2007 (Volume 72, Number 211)
DOCID: fr01no07-46 FR Doc 07-5446
DEFENSE NUCLEAR FACILITIES SAFETY BOARD
Defense Nuclear Facilities Safety Board
NOTICE: NOTICES
DOCID: fr01no07-46
SUBJECT CATEGORY:
Sunshine Act Meeting
DOCUMENT SUMMARY:
Pursuant to the provisions of the ``Government in the Sunshine
Act'' (5 U.S.C. 552b), notice is hereby given of the Defense Nuclear
Facilities Safety Board's (Board) public hearing and meeting described
below. The Board will conduct a public hearing and meeting pursuant to
42 U.S.C. 2286b and invites any interested persons or groups to present
any comments, technical information, or data concerning safety issues related to the matters to be considered.
Time and Date of Meeting: 6 p.m., December 5, 2007.
Place: Duane W. Smith Auditorium, 1400 Diamond Drive, Los Alamos, New
Mexico 87544. Additionally, as part of the Board's EGovernment
initiative, the hearing and meeting will be video recorded. A link to
the video recording will be available on the Board's Web site (http://www.dnfsb.gov ) following the hearing and meeting.
Status: Open. While the Government in the Sunshine Act does not require
that the scheduled discussion be conducted in a meeting, the Board has
determined that an open meeting in this specific case furthers the
public interests underlying both the Sunshine Act and the Board's enabling legislation.
Matters to be Considered: In this public hearing and meeting, the Board
will assess the safety posture at Los Alamos National Laboratory
(LANL), including actions taken in response to the Board's letter,
dated February 1, 2007, to the Acting Administrator of the National
Nuclear Security Administration (NNSA). In that letter, the Board
suggested actions that would substantially improve the safety posture
of the laboratory. These actions include strengthening federal safety
oversight, improving safety bases and ensuring the efficacy of safety
systems, developing effective institutional safety programs,
eliminating known hazards, and increasing federal management of new
projects. The Board anticipates testimony from the laboratory's
management and operation contractor, Los Alamos National Security
(LANS), and senior management officials from NNSA regarding actions,
both taken and planned, to improve the health and safety of workers at
defense nuclear facilities at the laboratory and the public. Under the
Atomic Energy Act of 1954, as amended, the Board is required, among
other things, to review and evaluate the content and implementation of
standards relating to the design, construction, operation, and
decommissioning of Department of Energy (DOE) defense nuclear
facilities, including all applicable DOE orders, regulations, and
requirements pertaining to such facilities. The Board is also
responsible for investigating any event or practice at DOE defense
nuclear facilities which the Board determines has adversely affected,
or may adversely affect, the health and safety of the workers and the
public. In this December 5, 2007, hearing and meeting, the Board will
examine how NNSA and LANS will ensure adequate protection of the public
health and safety, including that of the workers, and safety
performance at laboratory defense nuclear facilities. The Board will
collect information needed to understand and address any health or
safety concerns that may require Board action with respect to
operations at defense nuclear facilities at LANL. This information will
include, but is not limited to, presentations from NNSA and LANS senior
management officials and NNSA Los Alamos Site Office personnel. The
public hearing portion of this proceeding is authorized by 42 U.S.C. 2286b.
Contact Person for More Information: Brian Grosner, General Manager,
Defense Nuclear Facilities Safety Board, 625 Indiana Avenue, NW., Suite
700, Washington, DC 200042901, (800) 7884016. This is a tollfree
number.
SUMMARY:
Meetings; Sunshine Act,
SUPPLEMENTAL INFORMATION
Requests to speak at the hearing and meeting may be submitted in writing or by telephone. The Board asks that commentators describe the nature and scope of their oral presentation. Those who contact the Board prior to 4 p.m. EST on December 4, 2007, will be scheduled for time slots. While the hearing and meeting will start at 6 p.m., time slots for speakers from the public will begin at approximately 8 p.m. The Board will post a schedule for speakers at the entrance to the Duane W. Smith Auditorium at the start of the hearing and meeting.
Anyone who wishes to comment or provide technical information or data may do so in writing, either in lieu of, or in addition to, making an oral presentation. The Board Members may question presenters to the extent deemed appropriate by the Members. Documents will be accepted at the hearing and meeting or may be sent to the Defense Nuclear Facilities Safety Board's Washington, DC office. The Board will hold the record open until January 5, 2008, for the receipt of additional materials. A transcript of the hearing and meeting will be made available by the Board for inspection by the public at the Defense Nuclear Facilities Safety Board's Washington office and at DOE's public reading room at the DOE Federal Building, 1000 Independence Avenue, SW., Washington, DC 20585.
The Board specifically reserves its right to further schedule and
otherwise regulate the course of the hearing and meeting, to recess,
reconvene, postpone, or adjourn the hearing and meeting, conduct
further reviews, and otherwise exercise its powers under the Atomic Energy Act of 1954, as amended.
A.J. Eggenberger,
Chairman.
[FR Doc. 075446 Filed 103007; 9:30 am]
BILLING CODE 367001P