Browse: Departments Dates Agencies
CGD ID: [CGD08-07-032]
SUBJECT CATEGORY: Drawbridge Operation Regulations; Liberty Bayou, Slidell, LA
DOCUMENT SUMMARY: The Commander, Eighth Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the State Route 433 (S433) bridge across Liberty Bayou, mile 2.0, at Slidell, St. Tammany Parish, Louisiana. This deviation will test a change to the drawbridge operation schedule to determine whether a permanent change to the schedule is needed.
SUMMARY: Louisiana,
We encourage you to participate in evaluating this test schedule by submitting comments and related material. If you do so, please include your name and address, identify the docket number for this deviation CGD0807032, indicate the specific section of this document to which each comment applies, and give the reason for each comment. Please submit all comments and related material in an unbound format, no larger than 8[frac1s2] by 11 inches, suitable for copying. If you would like to know they reached us, please enclose a stamped, selfaddressed postcard or envelope. We will consider all comments and material received during the comment period. Comments must be received by January 14, 2008.
The Louisiana Department of Transportation and Development has requested that the operating regulation of the S433 pontoon span bridge, located on Liberty Bayou at mile 2.0 in Slidell, St. Tammany Parish, Louisiana, be changed in order to make more efficient use of operating resources. Currently, the draw of the S433 Bridge opens on signal, except that from 9 p.m. to 5 a.m. the draw opens on signal if at least 12 hours notice is given, as required by 33 CFR 117.469. The Coast Guard previously published a notice of proposed rulemaking [CGD080610] on May 4, 2006 (86 FR 26290). The proposed rule would have changed the regulation governing the operation of the (S433) pontoon span bridge across Liberty Bayou, mile 2.0, at Slidell, St. Tammany Parish, Louisiana. The rule, as previously proposed, would have changed the notice required for an opening from 12 hours to 4 hours. A final rule for that proposed change was not published. Subsequently, the bridge owner has requested that the notice for an opening be changed so that the bridge will open on signal, except that from 7 p.m. to 7 a.m., the bridge will open on signal if at least 2 hours notice is given.
A Supplemental Notice of Proposed Rulemaking [CGD0806010], is being issued in conjunction with this Temporary Deviation to obtain public comments. The Coast Guard will evaluate public comments from this Test Deviation and the above referenced Supplemental Notice of Proposed Rulemaking to determine if a permanent special drawbridge operating regulation is warranted.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is authorized under 33 CFR 117.35.
Dated: November 6, 2007.
David M. Frank,
Bridge Administrator.
[FR Doc. E722364 Filed 111407; 8:45 am]
BILLING CODE 491015P
FOR FURTHER INFORMATION CONTACT Phil Johnson, Bridge Administration Branch, telephone (504) 6712128.
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 26 CFR Part 1 50 CFR Part 679 40 CFR Part 180 47 CFR Part 73 33 CFR Part 117 50 CFR Part 17 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 33 CFR Part 100 40 CFR Part 63 26 CFR Part 301 50 CFR Part 622 39 CFR Part 111 50 CFR Part 660 44 CFR Part 65 40 CFR Parts 52 and 81 40 CFR Part 271 47 CFR Part 64 40 CFR Part 300 14 CFR Part 23 14 CFR Part 25 21 CFR Part 522 50 CFR Part 665 47 CFR Part 76 27 CFR Part 9