Browse: Departments Dates Agencies
Docket ID: [Docket No. PR08-5-000]
SUBJECT CATEGORY: Consumers Energy Company; Notice of Petition for Rate Approval
DOCUMENT SUMMARY: November 28, 2007.
Take notice that on November 20, 2007, Consumers Energy Company (Consumers) filed a petition for approval of rates for interruptible transportation services, pursuant to section 284.123(b)(2) of the Commission's regulations. Consumers requests that the Commission approve an interruptible transportation rate of $0.2623 per Dth plus up to 1.10% for fuel and lost and unaccounted for gas. Consumers states that the current interruptible transportation rate is $0.1429 per Dth plus up to 2.29% for fuel and lost and unaccounted for gas. The Commission's April 21, 2005 letter order required Consumers to make an informational filing of cost and throughput data on or before November 24, 2007 or file a petition for rate approval pursuant to section 284.123(b)(2).
Any person desiring to participate in this rate proceeding must
file a motion to intervene or to protest this filing must file in
accordance with Rules 211 and 214 of the Commission's Rules of Practice
and Procedure (18 CFR 385.211 and 385.214). Protests will be considered
by the Commission in determining the appropriate action to be taken,
but will not serve to make protestants parties to the proceeding. Any
person wishing to become a party must file a notice of intervention or
motion to intervene, as appropriate. Such notices, motions, or protests
must be filed on or before the date as indicated below. Anyone filing
an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest
[[Page 68872]]
on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
This filing is accessible online at http://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 2083676 (toll free). For TTY, call (202) 5028659.
Comment Date: 5 p.m. Eastern Time December 10, 2007. Kimberly D. Bose,
Secretary.
[FR Doc. E723624 Filed 12507; 8:45 am]
BILLING CODE 671701P
SUMMARY: Consumers Energy Co.,
DOCUMENT BODY 2: November 28, 2007.
Take notice that on November 20, 2007, Consumers Energy Company (Consumers) filed a petition for approval of rates for interruptible transportation services, pursuant to section 284.123(b)(2) of the Commission's regulations. Consumers requests that the Commission approve an interruptible transportation rate of $0.2623 per Dth plus up to 1.10% for fuel and lost and unaccounted for gas. Consumers states that the current interruptible transportation rate is $0.1429 per Dth plus up to 2.29% for fuel and lost and unaccounted for gas. The Commission's April 21, 2005 letter order required Consumers to make an informational filing of cost and throughput data on or before November 24, 2007 or file a petition for rate approval pursuant to section 284.123(b)(2).
Any person desiring to participate in this rate proceeding must
file a motion to intervene or to protest this filing must file in
accordance with Rules 211 and 214 of the Commission's Rules of Practice
and Procedure (18 CFR 385.211 and 385.214). Protests will be considered
by the Commission in determining the appropriate action to be taken,
but will not serve to make protestants parties to the proceeding. Any
person wishing to become a party must file a notice of intervention or
motion to intervene, as appropriate. Such notices, motions, or protests
must be filed on or before the date as indicated below. Anyone filing
an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest
[[Page 68872]]
on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
This filing is accessible online at http://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 2083676 (toll free). For TTY, call (202) 5028659.
Comment Date: 5 p.m. Eastern Time December 10, 2007. Kimberly D. Bose,
Secretary.
[FR Doc. E723624 Filed 12507; 8:45 am]
BILLING CODE 671701P
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 50 CFR Part 679 47 CFR Part 73 26 CFR Part 1 40 CFR Part 180 33 CFR Part 117 50 CFR Part 17 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 40 CFR Part 63 33 CFR Part 100 50 CFR Part 622 50 CFR Part 660 26 CFR Part 301 44 CFR Part 65 39 CFR Part 111 40 CFR Part 300 6 CFR Part 5 40 CFR Part 271 47 CFR Part 64 40 CFR Parts 52 and 81 50 CFR Part 665 10 CFR Part 50 44 CFR Part 64 49 CFR Part 571 39 CFR Part 3020