Browse: Departments   Dates   Agencies  

The Federal Register

DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT

Housing and Urban Development Department

Docket ID: [Docket No. FR-5162-N-02]

NOTICE: NOTICES

ACTION: Environmental statements; availability, etc.:

DOCUMENT ACTION: Notice.

SUBJECT CATEGORY: Conformity Determination for the East River Waterfront Esplanade and Piers Project City of New York, New York County, NY

DOCUMENT SUMMARY: In accordance with the federal Clean Air Act General Conformity rule, the Lower Manhattan Development Corporation (LMDC) has prepared a general conformity determination (Conformity Determination) for the East River Waterfront Esplanade and Piers Project (the Selected Project) pursuant to the October 2007 National Environmental Policy Act Record of Decision and Lead Agency Findings Statement (ROD). LMDC is a subsidiary of the Empire State Development Corporation (a political subdivision and public benefit corporation of the State of New York) and is responsible, pursuant to federal statute 42 U.S.C. 5304(g) as the recipient of U.S. Department of Housing and Urban Development (HUD) Community Development Block Grant program funds, for conducting reviews of projects receiving HUD funds in accordance with 24 CFR part 58, as well as other laws and regulations. These responsibilities include compliance with the National Environmental Policy Act and the Clean Air Act, 42 U.S.C. 7401 et seq. (particularly sections 7506(c) and (d)), in accordance with 24 CFR 58.4 and 58.5.

The Selected Project will improve a two mile portion of the East River waterfront in Manhattan and create a Cityowned public open space. The area of the Selected Project will generally encompass the waterfront, the upland area adjacent to and under the elevated FDR Drive and South Street extending from the Whitehall Ferry Terminal and Peter Minuit Plaza on the South to East River Park on the North, as well as Pier 15, the New Market Building pier, Pier 35, Pier 36, and Pier 42. The Selected Project is fully described in the Final Environmental Impact Statement for the East River Waterfront Esplanade and Piers Project.

The Selected Project is located in Manhattan, New York County, which has been designated by the United States Environmental Protection Agency (EPA) as a moderate nonattainment area for particulate matter less than 10 micrometers in aerodynamic diameter (PM10), a nonattainment area for particulate matter less than 2.5 micrometers in aerodynamic diameter (PM2.5), and a moderate nonattainment area for the 8hour ozone standard. New York County was previously designated by the EPA as a severe nonattainment area for the 1hour ozone standard. The area is in attainment for all other criteria pollutants: Nitrogen dioxide (NO2), lead, sulfur dioxide (SO2), and carbon monoxide (CO). MDC's review has been conducted consistent with the requirements of 40 CFR Part 93, Subpart

SUMMARY: New York, NY; East River Waterfront Esplanade and Piers Project; conformity determination,


SUPPLEMENTAL INFORMATION

A. Background

The Clean Air Act (CAA), as amended in 1990, defines a non attainment area (NAA) as a geographic region that has been designated as not meeting one or more of the National Ambient Air Quality Standards (NAAQS). The Selected Project is located in New York County, which has been designated by the EPA as a moderate NAAQS NAA for PM10, a NAA for PM2.5, and a moderate NAA for ozone. The area is in attainment for all other criteria pollutants: Nitrogen dioxide (NO2), lead, sulfur dioxide
(SO2), and carbon monoxide (CO). EPA had redesignated New York City as in attainment for CO on April 19, 2002 (67 FR 19337); the CAA requires that a maintenance plan ensure continued compliance with the CO NAAQS for former NAAs.

A State Implementation Plan (SIP) is a state's plan on how it will meet the NAAQS under the deadlines established by the CAA. In November 1998, New York State submitted its Phase II Alternative Attainment Demonstration for Ozone, which addressed attainment of the 1hour ozone NAAQS by 2007 (New York submitted subsequent filings to EPA in subsequent years). On February 4, 2002, EPA approved New York's 1hour ozone SIP (67 FR 5170).

The general conformity requirements in 40 CFR part 93, subpart B, apply to those federal actions that are located in a nonattainment or maintenance area, and that are not subject to transportation conformity requirements at 40 CFR part 51, subpart T, or part 93, subpart A, [[Page 69701]]
where the action's direct and indirect emissions have the potential to emit one or more of the criteria pollutants or precursors, in the case of ozone and PM2.5, at emission rates equal to or exceeding the prescribed rates at 40 CFR 93.153(b), or where the action encompasses 10 percent or more of a NAA or maintenance area's total emissions inventory for that pollutant. In the case of New York County, the prescribed annual rates are 50 tons of VOCs and 100 tons of NOX (ozone precursors in moderate 8hour ozone NAA and PM2.5 precursors in PM2.5 NAA), 100 tons of CO (CO maintenance area), 100 tons of PM10 (moderate PM10 NAA), 100 tons of PM2.5 (PM2.5 NAA), and 100 tons of SO2 (PM2.5 precursor in PM2.5 NAA).

LMDC has determined that the total annual direct and indirect emissions of all such criteria pollutants from the Selected Project are less than the de minimis rates prescribed in 40 CFR 93.153(b), as currently in effect, that would trigger the requirement to conduct a general conformity determination. Therefore, a general conformity determination is not necessarily required by current federal regulations. Nonetheless, temporarily, during construction, annual NOX emissions are predicted to exceed the threshold of 25 tons per year that would apply to a severe ozone nonattainment area under the former 1hour ozone NAAQS. Accordingly, LMDC prepared a Conformity Determination to demonstrate the Selected Project's conformity with the ozone SIP.

B. Requirements of the Conformity Determination

The purpose of the conformity analysis is to establish that the Selected Project will conform to the New York ozone SIP, thereby demonstrating that total direct and indirect emissions of the ozone precursors, in this case NOX, from the Selected Project, will not:

  • Cause or contribute to any new violation of any standard in the area,
  • Interfere with provisions in the applicable SIP for maintenance of any standard,
  • Increase the frequency or severity of any existing violation of any standard in any area, or
  • Delay timely attainment of any standard or any required interim emission reductions or other milestones in the SIP for purposes of

    1. A demonstration of reasonably further progress (RFP),

    2. A demonstration of attainment, or

    3. A maintenance plan.

    For the purposes of a general conformity determination, direct and indirect emissions are defined as follows (40 CFR 93.152):

  • Direct Emissions: Those emissions of a criteria pollutant or its precursors that are caused or initiated by the Federal action and occur at the same time and place as the action;
  • Indirect Emissions: Those emissions of a criteria pollutant or its precursors that

    1. Are caused by the federal action, but may occur later in time and/or may be further removed in distance from the action itself but are still reasonably foreseeable; and

    2. The federal agency can practicably control and will maintain control over due to a continuing program responsibility of the federal agency.

    LMDC has determined that the predicted emissions due to the Selected Project during construction that should be subject to its general conformity review include direct emissions from (1) nonroad engines operating onsite during construction, (2) marine vessels carrying materials to and from the site and conducting other work along the waterfront, and (3) emissions from constructionrelated vehicles traveling to and from the site.

    C. Presumption of Conformity

    The Selected Project will be located in an area previously designated as a severe ozone nonattainment area under the 1hour ozone NAAQS. The NOX emissions during two years of construction were predicted to potentially exceed the prescribed level for severe ozone nonattainment areas (25 tons per year). Therefore, LMDC has determined the following:

  • The methods for estimating direct and indirect emissions from the Selected Project meet the requirements of 40 CFR 93.159.
  • The Selected Project was predicted to result in the emission of up to 70.5 tons and 31.2 tons of NOX per year in 2008 and 2009, respectively.
  • All constructionrelated NOX emissions, including those from the Selected Project, are included in the emissions budget specified in the New York State Implementation Plan for OzonePhase II Alternative Attainment Demonstration.
  • The Selected Project does not cause or contribute to any new violation, or increase the frequency or severity of any existing violation, of the standards for the pollutants addressed in 40 CFR 93.158.
  • The Selected Project does not violate any requirements or milestones in the ozone SIP.

    Based on these determinations, the Selected Project is presumed to conform to the ozone SIP for the project area. The activities that are presumed to conform include all constructionrelated activities that will receive federal funding for the East River Waterfront Esplanade and Piers Project.

    Dated: November 30, 2007.
    Nelson R. Breg[oacute]n,
    General Deputy Assistant Secretary for Community Planning and Development.
    [FR Doc. E723832 Filed 12707; 8:45 am]
    BILLING CODE 421067P

    FOR FURTHER INFORMATION CONTACT Christina Hynes, Lower Manhattan Development Corporation, One Liberty Plaza, 20th Floor, New York, NY 10006; Telephone: (212) 9622300; Fax: (212) 9622431.


  • ©2004,2005,2006 theFederalRegister.com