Browse: Departments Dates Agencies
ER ID: [ER-FRL-6694-1]
SUBJECT CATEGORY: Environmental Impact Statements and Regulations; Availability of EPA Comments
DOCUMENT SUMMARY:
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 2025647167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published in FR dated April 6, 2007 (72 FR 17156).
Draft EISs
EIS No. 20070386, ERP No. DNRCE06024GA, Vogtle Electric Generating
Plant Site, Issuance of an Early Site Permit (ESP) for Construction and
Operation of a New Nuclear Power Generating Facility, NUREG1872, Burke County, GA.
Summary: EPA expressed environmental concern about impacts to
surface water under level 4 drought conditions and impacts to drinking
water sources. EPA also requested radiological monitoring of all plant
effluents, appropriate storage and disposition of radioactive waste and compliance with the NPDES Permit. Rating EC1.
EIS No. 20070400, ERP No. DFRCK05065CA, Upper American River
Hydroelectric FERC NO. 2101084, El Dorado and Sacramento Counties, CA [[Page 71137]]
and Chili Bar Hydroelectric FERC No. 2155024, El Dorado County, CA,
Issuance of a New License for the Existing and Proposed Hydropower Projects.
Summary: EPA has no objections to the proposed project. Rating LO.
EIS No. 20070412, ERP No. DTVAE08022TN, RuthfordWilliamsonDavidson
Power Supply Improvement Project, Proposes to Construct and Operate a
New 500kilovolt (kV) Ruthford Substation, a New 27mile 500kV
Transmission Line and Two New 9 and 15mile 161kV Transmission Lines, Ruthford, Williamson Counties, TN.
Summary: EPA expressed concern about impacts to water quality,
wetlands, forested wetlands, and riparian vegetation. Rating EC2.
EIS No. 20070425, ERP No. DCOEE3907100, Wolf Dam/Lake Cumberland
Project, Emergency Measures in Response to Seepage, Mississippi River, South Central Kentucky and Central Tennessee.
Summary: EPA expressed environmental concerns about impacts related
to water quantity and water quality in the reservoir and project dam
releases, and recommends that specific mitigation measures and monitoring efforts be implemented. Rating EC1.
EIS No. 20070431, ERP No. DNOAE9102000, Snapper Grouper Fishery
Amendment 15A, Proposes Management Reference Points and Rebuilding
Plans for Snowy Grouper, Black Sea Bass and Red Porgy, South Atlantic Region.
Summary: While EPA has no objections to the proposed action, we
suggested that shorter recovery schedules are considered. Rating LO. Final EISs
EIS No. 20070395, ERP No. FUSAD15001MD, Fort George G. Meade Base
Realignment and Closure 2005 and Enhanced Use Lease (EUL) Actions,
Implementation, Anne Arundel, Howard, Montgomery, Prince George's Counties, MD.
Summary: EPA continues to express concern about natural resource
impacts, and recommends additional avoidance, minimization, and mitigation measures be implemented.
EIS No. 20070397, ERP No. FAFSL65537WA, Tripod Fire Salvage Project,
Proposal to Salvage Harvest Dead Trees and FireInjured Trees Expected
to Die Within One Year, Methow Valley and Tonasket Ranger Districts,
Okanogan and Wenatchee National Forests, Okanogan County, WA.
Summary: EPA has no objections to the action as proposed. EIS No. 20070434, ERP No. FUSNK13000GU, Kilo Wharf Extension (MILCON P52), To Provide Adequate Berthing Facilities for MultiPurpose Dry Cargo/Ammunition Ship (the TAKE), Apra Harbor Naval Complex, Mariana Island, GU
Summary: EPA has continuing concerns regarding sufficiency of
mitigation for impacts to coral reefs. EPA recommends the Navy commit
to the preferred mitigation watershed restoration project agreed upon
by the Navy and resource agencies and avoid selecting the contingency
mitigation plan, which does not sufficiently replace lost ecosystem functions.
EIS No. 20070444, ERP No. FUSAE15000GA, Fort Benning U.S. Army
Infantry Center, Base Realignment and Closure (BRAC) 2005 and
Transformation Actions, Implementation, Chattahoochee and Muscogee Counties, GA.
Summary: EPA continues to have environmental concern about air quality impacts and requested additional work toward the development of a comprehensive alternative transportation program to assist the Columbus area in meeting air quality standards in the future. EIS No. 20070460, ERP No. FFRCF03010WI, Guardian Expansion and Extension Project, Construction and Operation Natural Gas Pipeline Facilities, Jefferson, Dodge, Fond du Lac, Calument, Brown, Walworth, Outagamie Counties, WI.
Summary: EPA continues to have environmental concerns about mitigation for wetland, upland forest, and wildlife habitat impacts. EIS No. 20070461, ERP No. FIBRK3910600, Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead, Implementation, Colorado River, CO and CA.
Summary: EPA does not object to the proposed project. EIS No. 20070462, ERP No. FMMSE0201100, Eastern Planning Area Outer Continental Shelf (OCS) Oil and Gas Lease Sale 224, Gulf of Mexico Offshore Marine Environment and Coastal Parishes/Counties of LA, MS, AL, and North Western Florida.
Summary: EPA continues to have environmental concerns about
drilling fluid impacts, and requested additional field investigations
on the effects of syntheticbased drilling fluids in the deep water environment.
EIS No. 20070479, ERP No. FGSAD11037DC, Armed Forces Retirement Home
(AFRHW), Proposed Master Plan for Campus Located at 3700 North Capitol Street, NW., AFRH Trust Fund, Washington, DC.
Summary: EPA continues to have environmental concerns about Impacts to historic properties and developmental impacts.
EIS No. 20070438, ERP No. FSNOAB9101700, Atlantic Sea Scallop
Fishery Management Plan (FMP), Amendment 11, Implementation to Control
Capacity and Mortality in the General Category Scallop Fishery, Gulf of Maine, Georges Bank, NC.
Summary: EPA's previous issues have been resolved; therefore, EPA has no objection to the proposed action.
Dated: December 11, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E724228 Filed 121307; 8:45 am]
BILLING CODE 656050P
SUMMARY: Agency comment availability,
DOCUMENT BODY 2:
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 2025647167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published in FR dated April 6, 2007 (72 FR 17156).
Draft EISs
EIS No. 20070386, ERP No. DNRCE06024GA, Vogtle Electric Generating
Plant Site, Issuance of an Early Site Permit (ESP) for Construction and
Operation of a New Nuclear Power Generating Facility, NUREG1872, Burke County, GA.
Summary: EPA expressed environmental concern about impacts to
surface water under level 4 drought conditions and impacts to drinking
water sources. EPA also requested radiological monitoring of all plant
effluents, appropriate storage and disposition of radioactive waste and compliance with the NPDES Permit. Rating EC1.
EIS No. 20070400, ERP No. DFRCK05065CA, Upper American River
Hydroelectric FERC NO. 2101084, El Dorado and Sacramento Counties, CA [[Page 71137]]
and Chili Bar Hydroelectric FERC No. 2155024, El Dorado County, CA,
Issuance of a New License for the Existing and Proposed Hydropower Projects.
Summary: EPA has no objections to the proposed project. Rating LO.
EIS No. 20070412, ERP No. DTVAE08022TN, RuthfordWilliamsonDavidson
Power Supply Improvement Project, Proposes to Construct and Operate a
New 500kilovolt (kV) Ruthford Substation, a New 27mile 500kV
Transmission Line and Two New 9 and 15mile 161kV Transmission Lines, Ruthford, Williamson Counties, TN.
Summary: EPA expressed concern about impacts to water quality,
wetlands, forested wetlands, and riparian vegetation. Rating EC2.
EIS No. 20070425, ERP No. DCOEE3907100, Wolf Dam/Lake Cumberland
Project, Emergency Measures in Response to Seepage, Mississippi River, South Central Kentucky and Central Tennessee.
Summary: EPA expressed environmental concerns about impacts related
to water quantity and water quality in the reservoir and project dam
releases, and recommends that specific mitigation measures and monitoring efforts be implemented. Rating EC1.
EIS No. 20070431, ERP No. DNOAE9102000, Snapper Grouper Fishery
Amendment 15A, Proposes Management Reference Points and Rebuilding
Plans for Snowy Grouper, Black Sea Bass and Red Porgy, South Atlantic Region.
Summary: While EPA has no objections to the proposed action, we
suggested that shorter recovery schedules are considered. Rating LO. Final EISs
EIS No. 20070395, ERP No. FUSAD15001MD, Fort George G. Meade Base
Realignment and Closure 2005 and Enhanced Use Lease (EUL) Actions,
Implementation, Anne Arundel, Howard, Montgomery, Prince George's Counties, MD.
Summary: EPA continues to express concern about natural resource
impacts, and recommends additional avoidance, minimization, and mitigation measures be implemented.
EIS No. 20070397, ERP No. FAFSL65537WA, Tripod Fire Salvage Project,
Proposal to Salvage Harvest Dead Trees and FireInjured Trees Expected
to Die Within One Year, Methow Valley and Tonasket Ranger Districts,
Okanogan and Wenatchee National Forests, Okanogan County, WA.
Summary: EPA has no objections to the action as proposed. EIS No. 20070434, ERP No. FUSNK13000GU, Kilo Wharf Extension (MILCON P52), To Provide Adequate Berthing Facilities for MultiPurpose Dry Cargo/Ammunition Ship (the TAKE), Apra Harbor Naval Complex, Mariana Island, GU
Summary: EPA has continuing concerns regarding sufficiency of
mitigation for impacts to coral reefs. EPA recommends the Navy commit
to the preferred mitigation watershed restoration project agreed upon
by the Navy and resource agencies and avoid selecting the contingency
mitigation plan, which does not sufficiently replace lost ecosystem functions.
EIS No. 20070444, ERP No. FUSAE15000GA, Fort Benning U.S. Army
Infantry Center, Base Realignment and Closure (BRAC) 2005 and
Transformation Actions, Implementation, Chattahoochee and Muscogee Counties, GA.
Summary: EPA continues to have environmental concern about air quality impacts and requested additional work toward the development of a comprehensive alternative transportation program to assist the Columbus area in meeting air quality standards in the future. EIS No. 20070460, ERP No. FFRCF03010WI, Guardian Expansion and Extension Project, Construction and Operation Natural Gas Pipeline Facilities, Jefferson, Dodge, Fond du Lac, Calument, Brown, Walworth, Outagamie Counties, WI.
Summary: EPA continues to have environmental concerns about mitigation for wetland, upland forest, and wildlife habitat impacts. EIS No. 20070461, ERP No. FIBRK3910600, Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead, Implementation, Colorado River, CO and CA.
Summary: EPA does not object to the proposed project. EIS No. 20070462, ERP No. FMMSE0201100, Eastern Planning Area Outer Continental Shelf (OCS) Oil and Gas Lease Sale 224, Gulf of Mexico Offshore Marine Environment and Coastal Parishes/Counties of LA, MS, AL, and North Western Florida.
Summary: EPA continues to have environmental concerns about
drilling fluid impacts, and requested additional field investigations
on the effects of syntheticbased drilling fluids in the deep water environment.
EIS No. 20070479, ERP No. FGSAD11037DC, Armed Forces Retirement Home
(AFRHW), Proposed Master Plan for Campus Located at 3700 North Capitol Street, NW., AFRH Trust Fund, Washington, DC.
Summary: EPA continues to have environmental concerns about Impacts to historic properties and developmental impacts.
EIS No. 20070438, ERP No. FSNOAB9101700, Atlantic Sea Scallop
Fishery Management Plan (FMP), Amendment 11, Implementation to Control
Capacity and Mortality in the General Category Scallop Fishery, Gulf of Maine, Georges Bank, NC.
Summary: EPA's previous issues have been resolved; therefore, EPA has no objection to the proposed action.
Dated: December 11, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E724228 Filed 121307; 8:45 am]
BILLING CODE 656050P
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 50 CFR Part 679 47 CFR Part 73 26 CFR Part 1 40 CFR Part 180 33 CFR Part 117 50 CFR Part 17 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 40 CFR Part 63 33 CFR Part 100 50 CFR Part 622 50 CFR Part 660 26 CFR Part 301 44 CFR Part 65 39 CFR Part 111 40 CFR Part 300 6 CFR Part 5 40 CFR Part 271 47 CFR Part 64 40 CFR Parts 52 and 81 50 CFR Part 665 10 CFR Part 50 44 CFR Part 64 49 CFR Part 571 39 CFR Part 3020