SUBJECT CATEGORY: Pine Barren Creek Watershed, Escambia County, AL
DOCUMENT SUMMARY: The Pine Barren Creek Watershed is a federally assisted action authorized for planning under Public Law 83566, the Watershed Protection and Flood Prevention Act. An environmental assessment was undertaken in conjunction with the development of a watershed plan that outlines alternatives for flood reduction within the City of Atmore, Alabama.
SUMMARY: Pine Barren Creek Watershed, Escambia County, AL,
Dated: February 19, 2008.
Gary Kobylski,
State Conservationist.
Finding of No Significant Impact for Pine Barren Creek Watershed, Escambia County, Alabama, January 2008
The Pine Barren Creek Watershed is a federally assisted action
authorized for planning under Public Law 83566, the Watershed
Protection and Flood Prevention Act. An environmental assessment was
undertaken in conjunction with the development of the supplemental
watershed plan. This assessment was conducted in consultation with
local, State, and Federal agencies as well as with interested
organizations and individuals. The Supplemental Watershed Plan and
Environmental Assessment are available for public review at the following locations:
U.S. Department of Agriculture, Natural Altmore Public Library, 700
Resources Conservation Service, 175 Ag E. Church Street, Atmore, Science Drive, Suite A, Brewton, Alabama. Alabama
U.S. Department of Agriculture, Natural City Hall, City of Atmore,
Resources Conservation Service, 3381 201 East Louisville Ave.,
Skyway Drive, Auburn, Alabama. Atmore, Alabama. Brewton Public Library, 206 West Jackson
Street, Brewton, Alabama.
The Supplemental Watershed Plan describes a plan for reduction of flooding in Atmore, Alabama. The plan will be implemented by providing financial and technical assistance through a local sponsor.
The principal project measures are to:
1. Deepen an existing channel located in the headwaters of Pine Barren Creek.
2. Install a grade stabilization structure.
3. Modify an existing weir structure.
4. Install reinforced concrete pipe laterals within the residential area of Atmore.
The project measures will reduce the potential for flooding within
the watershed and will also reduce the potential risk to human health
and safety. The modified weir structure will be designed to release no more water than that which was released prior to project
implementation. Thus, the creation of additional flow downstream during storm events will be avoided.
Wildlife habitat will not be disturbed during installation of the structural work of this project. No wetlands, wildlife habitat, fisheries, prime farmland, or cultural resources will be destroyed or threatened by this project. The value of woodland habitat will not decline. Fishery habitats will also be maintained.
No endangered or threatened plant or animal species will be adversely affected by the project.
There are no wilderness areas in the watershed.
Five alternative plans were considered in project planning. No significant adverse environmental impacts are anticipated from installation of the selected alternative. Also, the planned action is the most practical and cost effective means of reducing flooding in the watershed.
Flooding and water quality concerns in the Pine Barren Creek Watershed were expressed by local citizens, City of Atmore officials, Escambia County Soil and Water Conservation District, and other regional residents. NRCS personnel in partnership with the City of Atmore, explored alternatives to relieve flooding problems, while maintaining water quality in Pine Barren Creek. Two interagency meetings were held to gather input from local, state, and federal government agencies. In addition, two public meetings were held in Atmore to gather public input and concerns.
At the initiation of the planning process, meetings were held between NRCS and the City of Atmore to discuss problem identification and PL566 requirements. A public meeting was held in June 26, 2003 to scope the problems and concerns and to explain impacts of the PL566 programinitiatives relative to a watershed project and discuss possible solutions.
In order to further publicize this planning effort, a public announcement
[[Page 12947]]
was made to State and Federal agencies by letter and to local
landowners through local newspapers to announce the change in project purpose.
Evaluations and alternative solutions were developed with the Sponsor and other officials. The Recommended Plan was agreed upon.
Another public meeting was on May 31, 2007. The results of surveys, studies, field investigations and the Alternatives Plans were presented to the public. The Selected Plan was shared with those in attendance.
Based on Field Inspections to determine the quality and quantity of resources that would be impacted by selected practices and to consider possible mitigation measures, it has been determined that an Environmental Impact Statement (EIS) is not needed for this project. Based on the type of practices and systems that are planned, installation on previously disturbed land, an Environmental Assessment (EA) was prepared.
Upon review of the Pine Barren Creek Watershed PlanEA, this Finding of No Significant Impact (FONSI) was prepared. These documents are being distributed to all concerned agencies, groups, and interested individuals. A Notice of Availability of the FONSI is being published in the Federal Register. Agency consolations and public participation to date has shown no conflicts with the implementation of the selected plan.
The Environmental Assessment summarized above indicates that this
Federal action will not cause significant adverse local, regional, or
national impacts on the environment. Therefore, based on the above
findings, I have determined that an environmental impact statement for
the recommended Pine Barren Creek Supplemental Watershed Plan is not required.
Dated: February 19, 2008.
Gary Kobylski,
State Conservationist.
[FR Doc. 08993 Filed 31008; 8:45 am]
BILLING CODE 341016M
FOR FURTHER INFORMATION CONTACT Shannon Weaver, Assistant State Conservationist for Natural Resources. (334) 8874533 or email: shannon.weaver@al.usda.gov.
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 50 CFR Part 679 47 CFR Part 73 26 CFR Part 1 40 CFR Part 180 33 CFR Part 117 50 CFR Part 17 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 40 CFR Part 63 33 CFR Part 100 50 CFR Part 622 50 CFR Part 660 26 CFR Part 301 44 CFR Part 65 39 CFR Part 111 40 CFR Part 300 6 CFR Part 5 40 CFR Part 271 47 CFR Part 64 40 CFR Parts 52 and 81 50 CFR Part 665 10 CFR Part 50 44 CFR Part 64 49 CFR Part 571 39 CFR Part 3020