Browse: Departments Dates Agencies
USC ID: [USCG-2008-0116]
SUBJECT CATEGORY: Drawbridge Operation Regulations; Atlantic Intracoastal Waterway (AIWW), at Scotts Hill, NC
DOCUMENT SUMMARY: The Commander, Fifth Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Figure Eight Swing Bridge, at AIWW mile 278.1, at Scotts Hill, NC. From February 29, 2008 at 6 p.m. until March 11, 2008 at 5:30 p.m., this deviation is necessary to complete sandblasting and painting operations along with mechanical repairs. The drawbridge will remain closedto navigation each day from 6 p.m. to 9:30 a.m., from 10 a.m. to 1:30 p.m., and from 2 p.m. to 5:30 p.m.
SUMMARY: Atlantic Intracoastal Waterway at Scotts Hill, NC,
On December 27, 2007, we published a notice of temporary deviation from regulations entitled ``Drawbridge Operation Regulations; Atlantic Intracoastal Waterway (AIWW), at Scotts Hill, NC'' in the Federal Register (72 FR 56013).
Contractors, on behalf of the Figure Eight Homeowners Association (the bridge owner), requested an additional temporary deviation from the current operating regulations set out in 33 CFR 117.821(a)(3) to close the drawbridge to navigation in order to complete sandblasting, cleaning and painting of the bridge superstructure along with mechanical repairs.
To complete this operation, the Figure Eight Swing Bridge will be further maintained in the closedtonavigation position each day from February 29, 2008, until March 11, 2008, from 6 p.m. to 9:30 a.m., from 10 a.m. to 1:30 p.m., and from 2 p.m. to 5:30 p.m. Commercial vessel openings will be provided from the 6 p.m. to 9:30 a.m. workblock if at least three hours notice is given by calling (910) 6860635 or via marine radio on Channel 13. At all other times, the drawbridge will operate in accordance with 33 CFR 117.821(a)(3).
The Coast Guard will inform the users of the waterway through our Local and Broadcast Notices to Mariners of the closure period for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35.
We analyzed this temporary deviation under Commandant Instruction M16475.lD and Department of Homeland Security Management Directive 5100.1, which guide the Coast Guard in complying with the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 43214370f).
The environmental impact of this temporary deviation will be
minimal because closing the drawbridge to vessels in order to perform
routine repair and maintenance will not result in a change in
functional use, or an impact on a historically significant element or setting.
Dated: February 25, 2008.
Waverly W. Gregory, Jr.,
Chief, Bridge Administration Branch, Fifth Coast Guard District. [FR Doc. E84812 Filed 31008; 8:45 am]
BILLING CODE 491015P
FOR FURTHER INFORMATION CONTACT Gary S. Heyer, Bridge Management Specialist, Fifth Coast Guard District, at (757) 3986629.
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 26 CFR Part 1 50 CFR Part 679 33 CFR Part 117 40 CFR Part 180 44 CFR Part 67 50 CFR Part 17 47 CFR Part 73 50 CFR Part 648 14 CFR Part 97 33 CFR Part 100 40 CFR Part 63 50 CFR Part 622 26 CFR Part 301 39 CFR Part 111 44 CFR Part 65 40 CFR Parts 52 and 81 40 CFR Part 271 14 CFR Part 23 47 CFR Part 76 40 CFR Part 300 21 CFR Part 522 50 CFR Part 660 50 CFR Part 229 47 CFR Part 64 7 CFR Part 301 14 CFR Part 25