Browse: Departments Dates Agencies
SUBJECT CATEGORY: Intent To Prepare a Draft Environmental Impact Statement (DEIS) for a Proposed Special Area Management Plan for the Otay River Watershed, San Diego County, CA
DOCUMENT SUMMARY: The U.S. Army Corps of Engineers (Corps of Engineers) is announcing its intent to prepare a Draft Environmental Impact Statement (DEIS) for a Special Area Management Plan (SAMP). The SAMP is being developed to address potential effects of anticipated development, infrastructure, and maintenance projects on aquatic resources in the Otay River Watershed (SAMP study area). The DEIS will assess the impacts of various land development and aquatic resource protection alternatives as set forth below and further identified during the preparation of the SAMP. It is anticipated that the DEIS will be utilized by the local agencies in lieu of an Environmental Impact Report (EIR) pursuant to the California Environmental Quality Act (CEQA).
The SAMP will provide a comprehensive plan for protecting and enhancing aquatic resources while providing for the permitting of reasonable economic development and public infrastructure, consistent with the goals and objectives of local land use plans and with the regional Multiple Species Conservation Plan (MSCP) for southwestern San Diego County developed by local governments in collaboration with the U.S. Fish and Wildlife Service and California Department of Fish and Game. The SAMP will provide a framework for a longterm programlevel permitting process for projects in the watershed subject to the Corps of Engineers' permit authority under Section 404 of the Clean Water Act (CWA). Section 404 of the CWA regulates the discharge of dredged or fill material into waters of the United States, including wetlands. The SAMP may also be utilized by other agencies in the administration of their regulatory programs, including the California Department of Fish and Game (i.e., Section 1600 et seq. of the Fish and Game Code) and the Regional Water Quality Control Board (i.e., Section 401 of the CWA).
In addition, the SAMP will include a comprehensive program involving conservation, restoration, and management of aquatic resources within the study area.
SUMMARY: Otay River Watershed, San Diego County, CA,
The SAMP will describe an approach and a set of actions to
preserve, enhance, and restore aquatic resources, while allowing
reasonable economic development and construction and maintenance of
public infrastructure facilities within the study area. Key objectives
of the SAMP for the Otay River Watershed are to: (1) Evaluate the
extent and condition of existing aquatic resources; (2) develop a
comprehensive reserve program for the protection, enhancement,
restoration and management of aquatic resources; and (3) identify and
evaluate alternative land development scenarios in the context of the
aquatic resource reserve program. Based on the SAMP, the Corps of
Engineers will identify potential areas and/or activities suitable for
authorization using abbreviated, programlevel permitting procedures
under Section 404 of the CWA. Activities that may be authorized using [[Page 21324]]
such programlevel permitting procedures include, but are not limited
to, the construction of public and private infrastructure, such as
roads, flood control projects and utilities; operation and maintenance
of public and private facilities; residential, commercial, industrial,
and recreational development; and restoration, enhancement, and
creation of aquatic resources. The Corps of Engineers will jointly
develop the SAMP with other public agencies, including the County of
San Diego and the Cities of Chula Vista, and Imperial Beach. In
addition, the Corps of Engineers and County of San Diego will
coordinate with the U.S. Fish and Wildlife Service, the U.S.
Environmental Protection Agency, the California Department of Fish and
Game, and the California Regional Water Quality Control Boards as
appropriate. The Corps of Engineers encourages active participation by
affected interests, including landowners and the general public.
The County of San Diego and the cities of Chula Vista, and Imperial Beach will seek a Master Streambed Alteration Agreement (MSAA) under section 1600 et seq. of the California Fish and Game Code for activities in the SAMP study area that affect lakes, rivers, streams, and associated riparian habitats subject to the Department's jurisdiction. The documentation necessary to support a MSAA will be developed in close coordination with the California Department of Fish and Game.
The environmental review of the SAMP/MSAA will be conducted through an EIS. The County of San Diego will serve as the lead agency for the purpose of environmental review pursuant to the California Environmental Quality Act (CEQA) for the actions described in the SAMP/ MSAA. The Corps of Engineers and the County of San Diego will work cooperatively to prepare the EIS document, and to coordinate the public notice and hearing processes under federal and state law.
2. Alternatives: Alternatives that may be considered include the following two categories:
I. NoSAMP alternatives (also called NoAction alternatives):
(a) No Action (No SAMP). This alternative contemplates that no SAMP
would be developed and that permitting under Section 404 of the CWA
would proceed on a projectbyproject basis. Under the alternative,
each individual project would be required to obtain, as needed, permits from the Army Corps of Engineers.
(b) No Federal Action/No Impacts to Waters of the U.S. (Full
Realization of General Plans). This alternative would require avoidance
of impacts to waters of the United States, eliminating the need for the
issuance of Corps permits. To support the level of development
contemplated by local general plans, this alternative could involve
changes to existing specific plans and other land use documents to
accommodate higher density development and new infrastructure.
(c) No Federal Action/No Impacts to Waters of the U.S. (Partial
Realization of General Plans). This alternative would require avoidance
of impacts to waters of the United States and eliminate the need for
the issuance of Corps permits. Under this alternative, buildout of the
elements of local government general plans affecting the Otay River
Watershed would be reduced by a level commensurate with the avoidance of areas containing jurisdictional resources.
II. SAMP alternatives:
(a) Existing General Plans/MSCP. This alternative reflects land
uses designated in current general plans and other adopted plans. Land
uses would proceed as currently anticipated in the participating local
governments' existing land use plans and would require permits under
Section 404 in some cases. Conserved aquatic resources would be limited to preserve areas identified by the MSCP.
(b) Updated General Plans/MSCP. Under this alternative, the likely
changes in land use type and location that would occur under the
revised General Plans for the City and County of San Diego would be
analyzed. Conserved aquatic resources would be limited to preserve areas identified by the MSCP.
(c) Maximum Open Space/Minimal Development. One or more
alternatives would analyze land use scenarios that would result in
greater set asides of open space and lower levels of development than
currently anticipated for the watershed. The alternative(s) may, for
instance, consider the elimination of certain specific plans and other
highdensity development projects to reduce the impacts of development and gain additional open space in the watershed.
(d) Maximum Development/Minimal Open Space. One or more
alternatives would analyze land use scenarios that would result in
higher levels of development and lower levels of open space. The
alternative(s) may consider high intensity development in areas
otherwise zoned for open space, agriculture, or low density development.
(e) Subbasin Development/Open Space Scenarios. One or more
alternatives would analyze land use scenarios on a subbasinbysubbasin
basis with the goal of protecting subbasin and watershed riparian
ecosystem integrity in terms of hydrology, water quality, and habitat.
Land uses currently anticipated in each subbasin may be modified or
relocated to determine the environmental impact of different land use
configurations. The alternatives would reflect land use scenarios that
would likely have differing effects on the riparian ecosystem integrity of the watershed.
(f) Protection of High Integrity Areas (FunctionBased Approach).
One or more alternatives would focus on maximizing the protection/
preservation of areas with high functional integrity with respect to
aquatic resource hydrology, water quality, and habitat. The
alternative(s) would eliminate certain land uses based on their effects on high integrity resources.
(g) Avoidance of Jurisdictional Wetlands. Under this alternative,
impacts to wetlands under the jurisdiction of the Corps would be
avoided. However, the alternative would contemplate some level of
impact to nonwetland jurisdictional waters, such as ephemeral and intermittent streams.
(h) Updated General Plans/MSCP/Subbasin Functional Assessment
Criteria. This alternative contemplates that land uses would proceed
consistent with general plan updates as likely to be adopted by the
applicable jurisdiction. Under this alternative, the likely changes in
land use type and location that would occur under the revised General
Plans for the City and County of San Diego would be analyzed. In
addition, the alternative would recognize the preserve system
designated under the MSCP; however, additional areas could be set aside
for the protection, enhancement, and restoration of aquatic resources.
These additional areas would be identified based on the goal of
achieving certain ecological integrity targets and other physical and biological considerations.
3. Scoping Process: The Corps' scoping process for the DEIS will involve soliciting written comments and a public meeting. Potentially significant issues to be analyzed in the DEIS include aquatic resources, surface water quality, threatened and endangered species, cultural resources, cumulative, and growth inducing impacts.
4. In order for the EIS to be utilized by the state and local agencies to satisfy
[[Page 21325]]
the requirements of CEQA, the EIS will include a separate discussion of feasible mitigation measures for each significant impact.
5. Other environmental review, consultation requirements, or considerations include compliance with section 106 of the National Historic Preservation Act and section 7 of the Endangered Species Act. Public Scoping
A public scoping meeting to receive input on the scope of the DEIS will be conducted on April 29, 2008 from 7 p.m.9 p.m. at the City of Chula Vista Department of Public Works Building located at 1800 Maxwell Road, Chula Vista, CA 91911. This meeting will address both the SAMP and the MSAA. The public scoping will be conducted in an openhouse format.
Comments on the scope of the DEIS will be accepted from the public until June 18, 2008.
The estimated date the DEIS will be made available to the public is December 2009.
Dated: April 14, 2008.
Mark Durham,
Chief, South Coast Branch, Regulatory Division.
[FR Doc. E88523 Filed 41808; 8:45 am]
BILLING CODE 3710KFP
FOR FURTHER INFORMATION CONTACT Questions about the proposed action and DEIS can be answered by: Ms. Laurie Monarres, Otay River SAMP Project Manager, (858) 6745384, laurie.a.monarres@usace.army.mil, Regulatory Division (CESPLRG), U.S. Army Corps of Engineers, Los Angeles District, San Diego Field Office, 16885 West Bernardo Drive, Suite 300A.
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 50 CFR Part 679 26 CFR Part 1 40 CFR Part 180 47 CFR Part 73 50 CFR Part 17 33 CFR Part 117 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 33 CFR Part 100 40 CFR Part 63 50 CFR Part 622 26 CFR Part 301 39 CFR Part 111 40 CFR Part 300 50 CFR Part 660 44 CFR Part 65 40 CFR Parts 52 and 81 40 CFR Part 271 47 CFR Part 64 50 CFR Part 665 47 CFR Part 76 50 CFR Part 229 14 CFR Part 23 14 CFR Part 25 21 CFR Part 522