Browse: Departments Dates Agencies
RIN ID: RIN 1625-AA-09
USC ID: [USCG-2008-0477]
SUBJECT CATEGORY: Drawbridge Operation Regulations; Intracoastal Waterway (ICW); Beach Thorofare, NJ
DOCUMENT SUMMARY: The Commander, Fifth Coast Guard District, has approved a temporary deviation from the regulations governing the operation of the Margate Bridge, at ICW mile 74, across Beach Thorofare at Margate, New Jersey. The deviation is necessary to sandblast, paint and make repairs to the bridge. This deviation allows the bridge to provide partial vessel openings.
SUMMARY: Intracoastal Waterway; Beach Thorofare, NJ,
Margate Bridge, located at ICW mile 74, across Beach Thorofare at Margate, New Jersey, has a vertical clearance in the closed position to vessels of 14 feet above mean high water (MHW).
The Coast Guard reviewed the 2007 bridge logs provided by the Margate Bridge Company. The logs recorded approximately 79 vessel openings granted in October, 34 vessel openings granted in November and 4 vessel openings granted in December of last year.
Under this temporary deviation, the drawbridge will provide partial openings of the lift spans for vessels. The maintenance and repairs require immobilizing half of the draw span to singleleaf operation each day, beginning 7 a.m. on Wednesday, October 1, 2008, until and including 11:59 p.m. Wednesday, December 31, 2008, with a work barge occupying onehalf of the 58foot wide channel under the bridge, so passage through the bridge will be limited to a 29foot width for the duration of the project. The opposite connecting span while not under repair will continue to open for vessels if at least a halfhour advance notice is given to the bridge tender at (609) 8229175 or via marine radio on channel 13 VHF. Mariners requiring the full opening of the lift spans or the full width of the channel under the bridge will be directed to use the Atlantic Ocean as the alternate route between Absecon and Great Egg Harbor Inlets.
The Coast Guard will inform the users of the waterway through our Local and Broadcast Notices to Mariners of the partial openings of the draw span to minimize transiting delays caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is authorized under 33 CFR 117.35.
Dated: June 11, 2008.
Waverly W. Gregory, Jr.,
Chief, Bridge Administration Branch, Fifth Coast Guard District. [FR Doc. E813879 Filed 61808; 8:45 am]
BILLING CODE 491015P
FOR FURTHER INFORMATION CONTACT Mrs. Sandra S. Elliott, Bridge Management Specialist, Fifth Coast Guard District, at (757) 3986557.
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 47 CFR Part 73 26 CFR Part 1 50 CFR Part 679 40 CFR Part 180 50 CFR Part 17 33 CFR Part 117 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 40 CFR Part 63 6 CFR Part 5 33 CFR Part 100 50 CFR Part 622 50 CFR Part 660 26 CFR Part 301 44 CFR Part 65 39 CFR Part 111 40 CFR Part 271 40 CFR Part 300 47 CFR Part 64 40 CFR Parts 52 and 81 50 CFR Part 665 39 CFR Part 3020 50 CFR Part 229 44 CFR Part 64 49 CFR Part 571