Browse: Departments Dates Agencies
SUBJECT CATEGORY: Notice To Rescind a Notice of Intent To Prepare an Environmental Impact Statement (EIS), Ada and Canyon Counties, ID
DOCUMENT SUMMARY: The FHWA is issuing this notice to advise the public that the
Notice of Intent (NOI) published on July 17, 2007 to prepare an
Environmental Impact Statement (EIS) for a proposed highway project in Ada County, Idaho is being rescinded.
[[Page 41167]]
SUMMARY: Ada and Canyon Counties, Idaho,
The Idaho Transportation Department (ITD) and the Federal Highway Administration (FHWA) are rescinding the Notice of Intent (NOI) to prepare an EIS for a project that has been proposed to evaluate existing transportation improvement needs along approximately 16 miles of Interstate 84 (184) in Ada and Canyon Counties, Idaho. The project is officially known as the 184 Karcher Interchange to Five Mile Environmental Study (Project No. A010 (002); Key No. 10002).
The NOI is being rescinded because the current project development and NEPA process are yielding minimal potential for significant impacts and an EIS is not necessary or appropriate for the environmental evaluation.
The I84 Environmental Study is identified in the COMPASS Communities in Motion: Regional LongRange Transportation Plan 2030 (CIM) as one of several potential transportation needs in the Treasure Valley. The project was initiated with several conceptual alternatives from the previous planning efforts. The initially developed wide range of concept alternatives identified for evaluation in the I84 Karcher to Five Mile Environmental Study had unknown and much greater potential for impacts. In response, it was thought that an EIS would be the best method to discuss impacts from the broad range of alternatives. This class of action was determined before the purpose and need statement was crafted.
Consequently, a Letter of Project Initiation and NOl was published on July 17, 2007 to prepare an EIS.
Public input, agency and stakeholder coordination was conducted under the SAFETEALU Environmental Review process. Public meetings were held on May 15, May 17, and November 6, 2007 to solicit comments from the public on the purpose and need, alternatives being considered and the alternative screening process.
The Participating Agency group convened on August 9 and October 25, 2007. Input from the public and agency meetings assisted in the establishment of the purpose and need for the project, and yielded the project range of alternatives to be considered. Some of the concept alternatives initially considered for the action, such as the development of a new corridor to the south and improvement of local streets, did not meet the established purpose and need and were therefore dismissed from further consideration. In addition, environmental scans and screening did not reveal potential for significant impacts from the remaining build alternatives. Subsequently added screening criteria effectively dismissed additional concept alternatives based on their reasonability, practicability, and constructability. Alternatives were developed and advanced into further screening where actual footprints are evaluated for impacts within the project limits. The screened alternatives to be advanced were presented to the public on March 19, 2008 and to participating agencies on April 2, 2008.
At this point in the project development process, no significant human or natural environmental impacts are evident in the 184 Karcher Interchange to Five Mile Road Environmental Study project that would require an ElS. If, at any point in the environmental process, it is determined that the action is likely to have a significant impact on the environment, the preparation of an EIS will be required.
To ensure that the full range of issues related to this proposed
action and all significant issues are identified, comments and
suggestions are invited from all interested parties regarding this
action to rescind the NOl published July 17, 2007 for the highway
project in Ada and Canyon County, Idaho. Comments or questions
concerning this proposed action should be directed to the FHWA or lTD at the addresses provided above.
Peter J. Hartman,
Division Administrator, FHWAIdaho Division.
[FR Doc. E816053 Filed 71608; 8:45 am]
BILLING CODE 4910RYM
FOR FURTHER INFORMATION CONTACT Mr. Peter Hartman Division Administrator, Federal Highway Administration, 3050 Lakeharbor Lane, Suite 126, Boise, Idaho 83703, Telephone: (208) 334 9180, ext. 116, or Ms. Amy Schroeder, GARVEE Program Engineer, Idaho Transportation Department, P.O. Box 7129, Boise, Idaho 837031129, Telephone: (208) 3348772.
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 50 CFR Part 679 47 CFR Part 73 26 CFR Part 1 40 CFR Part 180 33 CFR Part 117 50 CFR Part 17 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 40 CFR Part 63 33 CFR Part 100 50 CFR Part 622 50 CFR Part 660 26 CFR Part 301 44 CFR Part 65 39 CFR Part 111 40 CFR Part 300 6 CFR Part 5 40 CFR Part 271 47 CFR Part 64 40 CFR Parts 52 and 81 50 CFR Part 665 10 CFR Part 50 44 CFR Part 64 49 CFR Part 571 39 CFR Part 3020