SUBJECT CATEGORY: Conejos Peak Ranger District, Rio Grande National Forest; Colorado; Rio de los Pinos Vegetation Management Project
DOCUMENT SUMMARY: The project analyzes salvage harvesting of spruce beetle
killed and infested trees on timber production areas in the Rio de los
Pinos watershed. This project will provide an opportunity to improve
and relocate the Los Pinos Trailhead (Trail
SUMMARY: Conejos Peak Ranger District, Rio Grande National Forest; Colorado; Rio de los Pinos Vegetation Management Project,
The purpose of this action is to implement the Rio Grande National Forest's Forest Plan by making live and dead timber available to the timber industry as part of the Rio Grande National Forest's timber sale program.
This proposal has been initiated because existing conditions vary from the Desired Conditions defined in Forest Plan MAP 5.13. This disparity indicates a need for improved forest stand conditions, reforestation of areas severely impacted by spruce beetle, reducing longterm fuel buildup in areas severely impacted by spruce beetle, salvage of dead trees before they lose their economic value, and provision of wood products to benefit the local and regional economy.
When seeking to reduce the standing dead fuel component, the goal is to reduce the duration and intensity of a potential wildland fire, thus influencing the severity of its impact. Standing dead fuel is expected to become heavy down fuel within 2050 years.
The Rio Grande National Forest proposes to salvage Engelmann spruce
trees that have been killed by, or are infested with, spruce beetle. [[Page 60232]]
Additionally, we propose to perform \1/4\ to 5 acre patch cuts across
the salvage units to enhance visual resources, and to regenerate areas
heavily impacted by the spruce beetle by planting Engelmann spruce
seedlings within the Rio de los Pinos Analysis Area. The proposed
treatments would contribute toward providing a sustained yield of
forest products from the Rio Grande National Forest and would ensure
meeting or moving toward Forest Plan Desired Conditions for Management
Area Prescriptions (MAP) 5.13. This proposed action would begin in 20092010.
Salvage harvesting of Engelmann spruce would occur on approximately
607 to 878 acres. Anywhere from 38 to 60 trees per acre 8
Under this proposal, trees 8 inches DBH and larger would be considered for harvest. With the exception of the patch cuts, all live nonbeetle infested trees not interfering with operations would be left. Rehabilitation of areas experiencing heavy spruce mortality would occur through natural and artificial regeneration.
Most of the treatment areas are accessible using the existing transportation system. Some road reconstruction, maintenance, and reopening one or more old unclassified roads would be required. Upon project completion, all classified roads that were closed to motor vehicle travel prior to the project would remain closed. Classified roads that are presently closed and old roads that would be reconstructed for log haul would be rehabilitated by subsoiling and seeding according to Project Design Criteria to reduce resource impacts and to put the road templates back into resource production.
Actions proposed in this EIS will provide an opportunity to relocate and improve the Los Pinos trailhead (Trail 736) which currently has little parking space and is only accessible by high clearance vehicles.
Roberto Martinez, District Ranger, Conejos Peak Ranger District, 15571 County Road T.5, La Jara, CO 81140.
The EIS discloses the environmental consequences of implementing the proposed action and alternatives to that action. A separate Decision Notice (DN), signed by the Responsible Official, will explain the management and environmental reasons for choosing the selected alternative; discuss the rationale for rejecting other alternatives; and disclose how the decision responds to the relevant issues.
The decision for the responsible officials to make in the DN is whether or not to implement some level of timber sale harvest and other activities described on all, part, or none of the Analysis Area given considerations of multipleuse goals and objectives. If the decision is made to authorize some level of harvest, the management framework will be described (including Standards and monitoring) to ensure that Desired Condition objectives are met or that movement occurs toward those objectives in an acceptable timeframe.
The Rio Grande National Forest invited public comment and participation regarding this project through the Schedule of Proposed Actions (SOPA), public notice in the Valley Courier (October 9, 2008) the newspaper of record, and a scoping letter sent to potentially concerned public, tribal governments, State and other Federal agencies (October 9, 2008). Comments received in these previous scoping efforts will be retained and considered in this EIS.
An additional comment period will be provided during scoping for this EIS in the form of this notice in the Federal Register, the Schedule of Proposed Actions (SOPA), public notice in the Valley Courierthe newspaper of record, and letters sent to potentially concerned public, tribal governments, State and other Federal agencies. Comment Requested
This notice of intent initiates the scoping process which guides the development of the environmental impact statement. The Forest Service invites written comments on the proposed action, including any issues to consider, as well as any concerns relevant to the analysis. In order to be most useful, scoping comments should be received within 30 days of publication of this Notice of Intent. Comments received in response to this notice, including names and addresses of those who comment, will be considered part of the public record on this Proposed Action and will be available for public inspection. If you wish to withhold your name or street address from public review or from disclosure under the Freedom of Information Act (FOIA), you must state this prominently at the beginning of your written comment. Such requests will be honored to the extent allowed by law, but persons requesting such confidentiality should be aware that under the FOIA, confidentiality may be granted in only very limited circumstances, such as to protect trade secrets. The Forest Service will inform the requester of the agency's decision regarding the request for confidentiality, and where the request is denied, the agency will return the submission and notify the requester that the comments may be resubmitted with or without name and address within a specified number of days. All submissions from organizations or businesses, and from individuals identifying themselves as representatives or officials of organizations or businesses, will be available for public inspection in their entirety. Comments submitted anonymously will be accepted and considered; however, those who submit anonymous comments will not have standing to appeal the subsequent decision under 36 CFR part 215.
Comments and FS responses will be addressed and contained in the Final EIS.
Early Notice of Importance of Public Participation in Subsequent Environmental Review: A draft environmental impact statement will be prepared for comment. The comment period on the draft environmental impact statement will be 45 days from the date the Environmental Protection Agency publishes the notice of availability in the Federal Register.
The Forest Service believes, at this early stage, it is important
to give reviewers notice of several court rulings related to public
participation in the environmental review process. First, reviewers of
draft environmental impact statements must structure their
participation in the environmental review of the proposal so that it is
meaningful and alerts an agency to the reviewer's position and
contentions. Vermont Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519,
553 (1978). Also, environmental objections that could be raised at the
draft environmental impact statement stage but that are not raised
until after completion of the final environmental impact statement may be waived or dismissed by the courts. City
[[Page 60233]]
of Angoon v. Hodel, 803 F.2d 1016, 1022 (9th Cir. 1986) and Wisconsin
Heritages, Inc. v. Harris, 490 F. Supp. 1334, 1338 (E.D. Wis. 1980).
Because of these court rulings, it is very important that those
interested in this proposed action participate by the close of the 45
day comment period so that substantive comments and objections are made
available to the Forest Service at a time when it can meaningfully
consider them and respond to them in the final environmental impact statement.
To assist the Forest Service in identifying and considering issues and concerns on the proposed action, comments on the draft environmental impact statement should be as specific as possible. It is also helpful if comments refer to specific pages or chapters of the draft statement. Comments may also address the adequacy of the draft environmental impact statement or the merits of the alternatives formulated and discussed in the statement. Reviewers may wish to refer to the Council on Environmental Quality Regulations for implementing the procedural provisions of the National Environmental Policy Act at 40 CFR 1503.3 in addressing these points.
Comments received, including the names and addresses of those who comment, will be considered part of the public record on this proposal and will be available for public inspection.
Authority: 40 CFR 1501.7 and 1508.22, 36 CFR 220.5(b) and Forest Service Handbook 1909.15, Section 21.
Dated: October 1, 2008.
Roberto Martinez,
District Ranger/Field Office Manager.
[FR Doc. E824112 Filed 10908; 8:45 am]
BILLING CODE 341011P
FOR FURTHER INFORMATION CONTACT Same as above.
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 50 CFR Part 679 47 CFR Part 73 26 CFR Part 1 40 CFR Part 180 33 CFR Part 117 50 CFR Part 17 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 40 CFR Part 63 33 CFR Part 100 50 CFR Part 622 50 CFR Part 660 44 CFR Part 65 26 CFR Part 301 39 CFR Part 111 40 CFR Part 300 6 CFR Part 5 40 CFR Part 271 47 CFR Part 64 40 CFR Parts 52 and 81 50 CFR Part 665 10 CFR Part 50 44 CFR Part 64 49 CFR Part 571 39 CFR Part 3020