Federal Register: August 11, 2009 (Volume 74, Number 153)
DOCID: fr11au09-114 FR Doc E9-19115
DEPARTMENT OF THE INTERIOR
Indian Affairs Bureau
NOTICE: NOTICES
DOCID: fr11au09-114
DOCUMENT ACTION: Notice of rate adjustment for San Carlos Irrigation Project-- Joint Works, Arizona.
SUBJECT CATEGORY:
Rate Adjustment for Indian Irrigation Project
DATES: Effective September 10, 2009.
DOCUMENT SUMMARY:
The Bureau of Indian Affairs (BIA) owns and operates the San Carlos Irrigation ProjectJoint Works (SCIPJW) located with the project office in Coolidge, Arizona. We are required to establish irrigation assessment rates to recover the costs to administer, operate, maintain, and rehabilitate this project. We are notifying you that we have adjusted the irrigation assessment rate at the SCIPJW to reflect current costs of administration, operation, maintenance, and rehabilitation.
SUMMARY:
Rate Adjustments for Indian Irrigation Project
SUPPLEMENTAL INFORMATION
A Notice of Proposed Rate Adjustment was published in the Federal Register (74 FR 19981) on April 30, 2009, to propose an adjustment to the irrigation assessment rate at the SCIPJW for 2011. The public and interested parties were provided an opportunity to submit written comments during the 30day period that ended June 1, 2009.
Does this notice affect me?
This notice affects you if you own or lease land within the
assessable acreage of the SCIPJW or if you have a carriage agreement with this irrigation project.
What irrigation assessments or charges are adjusted by this notice?
The rate table below contains the current rate for SCIPJW, where
we recover costs of administering, operating, maintaining, and
rehabilitating the project. The table also contains the final rate for the 2011 season.
Western Region Rate Table
Final Final Final
Project name Rate category 2009 rate 2010 rate 2011 rate
San Carlos Irrigation Project (Joint Works).. Basic per acre.................. $21.00 $21.00 $25.00 (See Note
Note
Did the BIA change the proposed rate increase?
Yes. The BIA proposed a $30/acre operation and maintenance (O&M)
assessment rate for the SCIPJW in 2011. This would have been a $9/acre
increase from the 2010 O&M assessment rate of $21/acre. After further
consideration, the BIA is establishing the 2011 O&M assessment rate at
$25/acre. This $5/acre change in the proposed rate increase would
extend, from two to three years, the time period required for BIA to
collect from the water users the funds needed to replace the Coolidge Dam cylinder gates.
Did the BIA receive any comments on the proposed irrigation assessment rate adjustments?
Yes. Written comments relating to the proposed rate adjustment for the SCIPJW were received by letter dated May 29, 2009, from one entity, the San Carlos Irrigation and Drainage District (District). What issues were of concern to the commenter?
The District raised the following comments in its letter. The BIA's response is provided immediately after each comment statement. (1) Comment: The BIA has not employed a reasonable methodology for determining an appropriate O&M charge for 2011.
Response: The methodology used by the BIA to estimate an 2011 O&M budget and determine an appropriate rate for 2011 was reasonable. Based on a review of historical income receipts and expenditures, a budget of projected income receipts and expenditures is developed approximately two years before the O&M income is collected and expenses are incurred. The BIA relies on financial reports generated by the Federal Finance System for reviewing past expenditures and projecting a future budget and expenditures. Procurement files and records maintained by the SCIP JW are also reviewed and considered. For example, with regard to development of the 2011 O&M budget, the BIA reviewed: (1) The yearend reconciled income and expenditure information for 2008; (2) available income and expenditure information 2009; (3) previous budget projections for 2010; and (4) other information relevant to potential future activities, such as the cost information for replacement of the Coolidge Dam cylinder gates.
The SCIPJW staff and District representatives discussed the
pertinent budget information during several meetings held between
November 13, 2008 and March 30, 2009. The District was provided with pertinent budget information during this time period.
(2) Comment: The BIA has provided the District with conflicting
information about current and projected staffing levels for the
Irrigation Division of the Project, and the allocation of $615,000 in 2011 for personnel is excessive and unreasonable.
Response: The BIA does not believe that it has provided the District with conflicting information about current and projected staffing levels for the Irrigation Division of the SCIPJW. The projected 2011 personnel budget for the Irrigation O&M staff is based on actual expenditures incurred by the SCIPJW in 2008 and 2009 for the staff positions the SCIPJW anticipates to be in its employment in 2010 and 2011, with modest cost of living increases. The base information for these staff positions and salary and wage grade scales was [[Page 40228]]
provided to the District in December 2008.
In anticipation of the reductioninforce resulting from the transfer of the SCIPJW maintenance duties to the Joint Control Board (JCB) required by the Arizona Water Settlements Act (Pub. L. 108451, 118 Stat. 3478, 3499 (Dec. 10, 2004)) and the Related Joint Control Board Agreement signed by the District and the Secretary of the Interior, the SCIPJW will be updating its Irrigation Organization Chart. At that time, the District will be provided a copy of the revised Irrigation Organization Chart and associated salary table.
The reductioninforce is in progress and the BIA estimates this action will result in an annual personnel cost savings of approximately $400,000. This savings is accounted for in the 2010 and 2011 O&M budgets for the SCIPJW and was identified to the District on or before March 30, 2009. Although the Supervisory Civil Engineer position was vacant from August 2008 through May 2009, the position has now been filled. The BIA disagrees with the District's assertion that only a halftime Civil Engineer position is needed. There are extensive construction activities planned for SCIPJW facilities pursuant to the Arizona Water Settlements Act by the District, the Gila River Indian Community, and the U.S. Bureau of Reclamation. These activities require the attention of the Supervisory Civil Engineer, in addition to the duties retained by the SCIPJW after the transfer of maintenance duties to the JCB.
Similarly, the BIA disagrees with the District's estimate of how many irrigation system operators the SCIPJW needs to perform the water delivery duties. The SCIPJW has a vast geographical territory, and the irrigation system operators are regularly called on to perform water delivery duties after normal working hours and on weekends and holidays.
BIA notes that the District reiterates its request for the SCIPJW
to assign the well maintenance function to the JCB. The agreement
applicable to the JCB requires the BIA to continue maintenance of
project wells until such time as the wells become a ``District
Rehabilitation Responsibility'' as defined in sections 9.1 and 9.4 of
the Joint Control Board Agreement. There may be other options available
for consideration by BIA in response to this request, such as a Federal
procurement action or an Indian SelfDetermination contract action.
However, consideration of these options would take time to discuss and
evaluate and cannot be resolved in the context of the 2011 O&M rate
process. Regardless, implementation of other options for maintenance of
project wells does not eliminate the costs; it only changes the way the costs are covered.
(3) Comment: The BIA's 2011 budget estimate for utilities, services, and supplies is excessive.
Response: The BIA does not believe the 2011 budget estimate for
these categories is excessive. This conclusion is based on the best
historical information available to the BIA for these expenditures. The
details concerning these budget items were provided to the District
earlier this calendar year. These categories primarily include
expenditures to pay for repair and maintenance of the 98 wells owned
and operated by the SCIPJW. This is a high priority in the O&M budget
because the groundwater supplied from these wells contributes
significantly to the annual water apportionment in the project. Another
significant expenditure in this category is the Federal environmental
compliance costs incurred by the SCIPJW to: (1) Evaluate encroachment
actions on SCIPJW facilities due to nonirrigation development by
District landowners; and (2) to comply with other applicable Federal
environmental requirements in the course of O&M activities retained by
the BIA under the Arizona Water Settlements Act and Joint Board Agreement.
(4) Comment: The replacement of the Coolidge Dam cylinder gates
constitutes ``betterment'' and requires the consent of the District
because the purpose for replacing these gates is to extend the useful life of Coolidge Dam.
Response: The BIA disagrees with the District's assertion that replacement of the Coolidge Dam cylinder gates is ``betterment.'' Coolidge Dam is the asset and the cylinder gates are components of the dam. Replacing the gates does not increase the life of the dam; the replacement only allows the BIA to operate the asset (Coolidge Dam) properly. The BIA considers the gate replacement to be deferred maintenance which needs to be completed as soon as the requisite funds to pay for the replacement costs can be collected through the O&M assessment rate process. The BIA provided extensive technical information about the condition of the cylinder gates to the District twice since 2006 and sought review and comment from the District about the problem and the replacement plan. See the report completed in July 2004 by the Bureau of Reclamation for the BIA titled: ``Coolidge Dam, Comprehensive Dam Review, Bureau of Indian AffairsSafety of Dams Program, Western Region, San Carlos Indian Reservation, 2004.'' This report includes an additional document titled: ``Examination Report, Special Examination, Coolidge Dam, San Carlos, Arizona,'' which documents the findings and recommendations relating to the Coolidge Dam cylinder gates. The District has not submitted substantive comments to the BIA on this matter in response to this technical information.
These reports provide the following information: a buckling failure of a cylinder gate while closed, due to large hydrostatic loads on a reduced steel section (from corrosion), could prevent reopening of the gate for reservoir releases and also present a dam safety concern. A single ninefootdiameter circular bulkhead gate could be fabricated for installation by a crane onto either cylinder gate seat within each intake tower for maintenance and inspection purposes, replacing the function of the cylinder gates at a reasonable cost. Failure of either cylinder gate is considered likely within the next 30 years under normal operating heads and immediate measures should be taken to lock both gates in the fully open position until they are removed. Based on this technical review and information, BIA decided to lock the existing cylinder gates in a fully open position and the gates are no longer available to be closed under any circumstance. This prevents inspection and maintenance of the emergency guard gate and sections of the conduit through the dam upstream of the emergency guard gate.
Based on this information, the BIA believes it is appropriate as
the owner/operator of Coolidge Dam, as well as the steward of the water
supply delivered from Coolidge Dam, to move forward with the actions
required to replace the cylinder gates. In order to reduce the cost
burden to the District landowners, the BIA will reduce the 2011 O&M
rate from $30/acre to $25/acre and collect the funds for this purpose over a threeyear period rather than a twoyear period.
(5) Comment: The BIA's emergency reserve fund should be maintained at $200,000, not $600,000.
Response: The BIA disagrees with the District's analysis of the
emergency reserve fund. During calendar year 2006, when the BIA engaged
in water user meetings with the District and the Indian water users
about the proposed O&M rate for 2008 and 2009, extensive discussion
ensued concerning the amount of the emergency reserve fund and the
separate reserve fund maintained by the SCIPJW for well replacement. In response to the
[[Page 40229]]
concerns expressed by the District in these meetings, the BIA abolished
the separate reserve fund for the well replacement contingencies and
the BIA decided to use the emergency reserve fund to replace wells as
needed and will replenish the reserve fund if it is used for well
replacement. A single well replacement is estimated to cost between
$250,000 and $300,000. The BIA believes a reserve fund sufficient to
replace two wells should be maintained. As such, the BIA believes it is
reasonable to maintain the SCIPJW emergency reserve fund at $600,000.
This amount complies with the BIA's policy for irrigation project reserve funds.
(6) Comment: The District requests copies of all information that
was used to prepare the proposed budget and O&M charge for 2011.
Response: The development of the 2011 O&M budget estimate is logically an outgrowth of the extensive discussions between BIA and the District about the O&M income and expenditures in 2008 and 2009 and the projected O&M budget for 2010. These discussions also included fiscal and programmatic issues and information related to the transfer of SCIPJW maintenance duties to the JCB, as required by the Arizona Water Settlements Act and the Joint Control Board Agreement signed by the District and the Secretary of the Interior.
Examples of the information provided to the District include: staff position titles; staff position salary and wage grade scales; projected and actual expenditures for FY 2009; projected expenditures for 2010; final income and expenditure information for the reconciled yearend 2008 O&M budget (including volumes of documentation from the Federal Finance System and General Ledger); SCIPJW budget spreadsheets displaying historical expenditure data for nearly the last ten years; and detailed descriptions of the O&M activities and performance standards for the SCIPJW.
Additionally, the SCIPJW provided the District with access to all
of its contract files as part of the pending litigation in San Carlos
Irrigation and Drainage District v. United States, No. 06576C, U.S.
Court of Federal Claims. These contract files contained information
pertaining to current SCIPJW obligations and payments for contract
obligations relating to large outlays, such as well maintenance and
repair and environmental compliance costs associated with O&M of the SCIPJW.
Where can I get information on the regulatory and legal citations in this notice?
You can contact the appropriate office(s) stated in the table for the SCIPJW, or you can use the Internet site for the Government Printing Office at http:[sol][sol]www.gpo.gov. What authorizes you to issue this notice?
Our authority to issue this notice is vested in the Secretary of the Interior by 5 U.S.C. 301 and the Act of August 14, 1914 (38 Stat. 583; 25 U.S.C. 385). The Secretary has, in turn, delegated this authority to the Assistant SecretaryIndian Affairs under Part 209, Chapter 8.1A, of the Department of the Interior's Departmental Manual. Who can I contact for further information?
The following table contains the regional and project/agency contacts for the SCIPJW.
Western Region Contacts
Allen Anspach, Regional Director, Bureau of Indian Affairs, Western
Regional Office, Two Arizona Center, 400 N. 5th Street, 12th floor, Phoenix, AZ 85004, Telephone: (602) 3796600
Project Name Project/Agency Contacts
San Carlos Irrigation ProjectJoint Works Bryan Bowker, Project
Manager, P.O. Box 250,
Coolidge, AZ 85228,
Telephone: (520) 7236216
Consultation and Coordination With Tribal Governments (Executive Order 13175)
To fulfill its consultation responsibility to tribes and tribal organizations, BIA communicates, coordinates, and consults on a continuing basis with these entities on issues of water delivery, water availability, costs of administration, operation, maintenance, and rehabilitation of projects that concern them. This is accomplished at the individual irrigation project by project, BIA, and regional representatives, as appropriate, in accordance with local protocol and procedures. This notice is one component of our overall coordination and consultation process to provide notice to, and request comments from, these entities when we adjust irrigation assessment rates. Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use (Executive Order 13211)
This rate adjustment will have no adverse effects on energy supply, distribution, or use (including a shortfall in supply, price increases, and increase use of foreign supplies) as this rate adjustment is implemented. This is a notice for rate adjustment at a BIAowned and operated irrigation project.
Regulatory Planning and Review (Executive Order 12866)
This rate adjustment is not a significant regulatory action and does not need to be reviewed by the Office of Management and Budget under Executive Order 12866.
Regulatory Flexibility Act
This rate adjustment is not a rule for the purposes of the Regulatory Flexibility Act because it establishes ``a rule of particular applicability relating to rates.'' 5 U.S.C. 601(2). Unfunded Mandates Reform Act of 1995
This rate adjustment does not impose an unfunded mandate on State, local, or tribal governments in the aggregate, or on the private sector, of more than $130 million per year. The rule does not have a significant or unique effect on State, local, or tribal governments or the private sector. Therefore, the Department of the Interior (Department) is not required to prepare a statement containing the information required by the Unfunded Mandates Reform Act (2 U.S.C. 1531 et seq.).
Takings (Executive Order 12630)
The Department has determined that rate adjustments do not have significant ``takings'' implications.
[[Page 40230]]
Federalism (Executive Order 13132)
The Department has determined that rate adjustments do not have significant Federalism effects because they will not affect the States, the relationship between the Federal Government and the States, or the distribution of power and responsibilities among various levels of government.
Civil Justice Reform (Executive Order 12988)
In issuing this rule, the Department has taken the necessary steps to eliminate drafting errors and ambiguity, minimize potential litigation, and provide a clear legal standard for affected conduct, as required by section 3 of Executive Order 12988.
Paperwork Reduction Act of 1995
This rate adjustment does not affect the collections of information that have been approved by the Office of Information and Regulatory Affairs, Office of Management and Budget, under the Paperwork Reduction Act of 1995. The OMB Control Number is 10760141 and expires August 31, 2009.
National Environmental Policy Act
The Department has determined that this rate adjustment does not constitute a major Federal action significantly affecting the quality of the human environment and that no detailed statement is required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 4370(d)).
Data Quality Act
In developing this notice, we did not conduct or use a study,
experiment, or survey requiring peer review under the Data Quality Act (Pub. L. No. 106554).
Dated: July 28, 2009.
George T. Skibine,
Acting Principal Deputy, Assistant SecretaryIndian Affairs. [FR Doc. E919115 Filed 81009; 8:45 am]
BILLING CODE 4310W7P
FOR FURTHER INFORMATION CONTACT
Bryan Bowker, Project Manager, P.O. Box 250, Coolidge, AZ 85228, telephone: (520) 7236216.